The Type 31 frigate, also known as the Inspiration class, and formerly known as the Type 31e frigate or General Purpose Frigate (GPF), is a class of five frigates being built for the United Kingdom's Royal Navy, with variants also being built for the Indonesian and Polish navies. The Type 31 is intended to enter service in the 2020s alongside the eight submarine-hunting Type 26 frigate and will replace the five general-purpose Type 23 frigates.[1] The Type 31 is part of the British government's "National Shipbuilding Strategy".

Designed by Babcock International, it is based on the Odense Maritime Technology (OMT) frigate hull and is marketed under the name Arrowhead 140.[2] The design has been sold to Indonesia as the two ship Fregat Merah Putih ("Red-White frigate") in September 2021, and to Poland for the three ship Miecznik-class frigates in March 2022.[3] [4] [5]

Development

The 2010 Strategic Defence and Security Review (SDSR) authorised the Global Combat Ship (GCS) programme, which would replace the Royal Navy's thirteen Type 23 frigates. Earlier that year, BAE Systems was awarded a four-year, £127 million contract by the Ministry of Defence to design the new class.[6] It was planned that two variants of the class would be built: five general purpose frigates and eight anti-submarine warfare frigates. There was to be little difference between the two variants, except for the Sonar 2087. Initial expectations were that construction would start in 2016 and the ships would gradually replace the Type 23 frigates by the mid-2030s. The 2015 Defence Review decided that only the eight anti-submarine warfare Type 26 frigates would be ordered and five general purpose frigates to an altogether different design would be ordered to give at least 13 frigates in RN service.[7]

General Purpose Frigate

The resultant General Purpose Frigate (GPFF) was to be a lighter, flexible and more affordable general purpose frigate class.[8] [9] According to the 2015 SDSR, the lower cost of these frigates could lead to the Royal Navy acquiring more than five, therefore increasing its overall numbers of frigates and destroyers.[10] During a defence and security lecture in July 2016, GPFF was referred to as the Type 31 frigate by the First Sea Lord, Admiral Sir Philip Jones,[11] who also stated that Type 31 frigates could permanently operate "East of Suez"—from the Persian Gulf region to the Asia-Pacific.[11] During the same month, BAE Systems revealed two general purpose frigate designs: the "Avenger class", which was based on the "Amazonas-class/River-class Batch 2 offshore patrol vessel", and the "Cutlass class" that was described as a "significantly stretched and enhanced derivation of the Al Shamikh-class corvette design".[12] The Sunday Times stated that Babcock International and BMT had also submitted one design each.[13] [14] Jones described the GPFF as "to be a much less high-end ship. It is still a complex warship, and it is still able to protect and defend and to exert influence around the world, but it is deliberately shaped with lessons from wider industry and off-the-shelf technology to make it... more appealing to operate at a slightly lower end of Royal Navy operations." IHS Janes described it as a "credible frigate" that will cover "maritime security, maritime counter-terrorism and counter-piracy operations, escort duties, and naval fire support... [sitting] between the high-end capability delivered by the Type 26 and Type 45, and the constabulary-oriented outputs to be delivered by the five River-class Batch 2 OPVs."[15]

A September 2017 graphic released by the Royal Navy stressed modular adaptability and flexible construction of the design for export opportunities. Core requirements of the Type 31e frigate included a medium calibre gun, point defence systems, hangar and a flight deck for Wildcat or ten tonne helicopter operated by a crew of around 100 with space for 40 more personnel.[16] The British government released a Request for information (RFI) in September 2017, detailing the desired characteristics of the Type 31e. The RFI provided greater details such as a "Medium Calibre Gun" of greater than 57mm, a point defence anti-air missile system and the optional ability to launch and recover unmanned aerial vehicles.[17]

National Shipbuilding Strategy

In October 2017, the Financial Times stated that It quoted Francis Tusa, a defence analyst, who argued that the competition appeared to be designed to break BAE's hold on naval shipbuilding; However, this was denied by the MoD, which stated that the competition was designed to improve speed of delivery and reduce cost.[18]

In order to maintain national shipbuilding capacity, the 2017 national shipbuilding strategy proposed ordering an initial batch of five Type 31e frigates with an initial in-service date in 2023, with their cost limited to a maximum of £250m each, to be followed by a second batch order of Type 31 for the Royal Navy.[19]

The refresh to the National Shipbuilding Strategy published by the UK Government in March 2022 stated:

Design tenders

Throughout 2017, several designs from different companies were suggested as contenders for the Type 31. BAE submitted two designs, "Avenger", essentially an improved Batch 3 River-class OPV,[20] and "Cutlass", a significantly stretched and enhanced derivation of the Al Shamikh-class corvette.[21] BMT submitted a design called "Venator 110",[22] with Steller Systems putting forward project "Spartan",[23] and Babcock offered a design named "Arrowhead 120".[24]

In October 2017, BAE Systems announced that it would withdraw from the Type 31e competition as a main contractor, citing the capacity constraints of its shipyards on the Clyde, which were full with the work on the new River-class patrol vessels and Type 26 frigates. Instead, BAE announced a partnership with Cammell Laird, whereby BAE would provide its expertise in design and systems integration, while Cammell Laird would be the prime contractor and be responsible for the assembly of the ships at its yard at Birkenhead.[25] The planned design was named "Leander", a reference to three previous classes of ship in the Royal Navy.[26]

In November 2017, it was announced that BMT and Babcock signed a co-operation agreement for the Type 31. They did not choose between their respective "Venator 110" or "Arrowhead 120" designs, but instead would explore their designs to determine the best possible option.[27] In late May 2018, Babcock, partnered with BMT, and Thales Group announced the "Arrowhead 140" design, based on the hull of the Danish s.[28]

The competition was suspended on 20 July 2018 due to 'insufficient compliant bids' being received; however, The Times claimed this was due to a "funding crisis".[29] The competition was restarted in August 2018.[30]

Competitive design phase selection

On 10 December 2018, three groups were selected for the competitive design phase:

Both the BAE Systems and Babcock led entrants had already been put forward when the competition was temporarily suspended. The third bid was submitted by the Atlas Elektronik UK-led team. Both the Babcock and Atlas proposals included Ferguson Marine on the Clyde and Harland & Wolff in Belfast.[31] By August 2019, both of these companies announced that they were in financial difficulties.[32] [33]

It was announced on 12 September 2019 that the Arrowhead 140 design had been selected as the base design for the Type 31 frigate.[34] A contract was formally awarded to Babcock on 15 November 2019, for an average production cost of £250 million per ship and an overall programme cost set to be £2 billion with £1.25 billion value to Babcock.

On 20 January 2020, the Public Accounts Committee was informed by the Permanent Secretary for Defence that the first ship will be launched by 2023, but the in-service date will be in 2027.[35] Earlier statements had been for an in-service date would be in 2023.[36] In September 2022, John Howie, chief corporate affairs officer for Babcock International, stated that all five ships would be "delivered" to the Navy by 2028,[37] though other sources suggested that the actual "in service" date might be somewhat later.[38]

Arrowhead 140

The AH140 design submitted by Babcock, BMT, and Thales is a development of the s in service with the Royal Danish Navy.

An engineering paper published in 2022 by Babcock International stated [39] :

A further engineering paper published in 2024 by Babcock International explains that significant redesign of the 'parent' class was undertaken to create the Type 31 Frigate :

The same paper goes on to explain the impact of these revised UK design standards :

Babcock state that the design the Arrowhead 140 enables the hull to perform any of a wide range of roles specified by the customer such as:[40]

AH140 also features a wide degree of flexibility in the component systems. It is capable of being fitted with a variety of radar masts (fixed or rotating), up to four boat bays for RHIBs or small USVs and the customer's choice of medium and small calibre gun options (up-to 127 mm in position A and up-to 76 mm in position B).[43] Additionally, there are several options for vertical launching systems (VLS) available; from a 24-cell CAMM 'mushroom farm' configuration as cost and weight saving option, up to a 32-cell strike length Mark 41 vertical launch system for long range surface-to-air missiles (SAMs) or surface-to-surface missiles (SSMs) that can be positioned amidships. An additional 16-cell Mark 41 complex can be positioned forward of the bridge by removing the gun mount from Position B enabling either a 48-cell loadout or to free up the central sections for other facilities such as a full-width mission bay.[44] Previous renderings of the Red-White frigate design for Indonesia have also shown an additional 56 cells of an indeterminant type and length added to the rear of the main gun suggesting that even greater level weapon customisation is available in the design.[45]

Another major characteristic of the AH140 is that it has dedicated accommodation for more than 180 personnel but only requires a crew of less than 100, allowing for both lower sustainment costs but also for a large number of mission specific personnel such as flight crew, remote system operators, marines / special forces to be embarked, or refugees in the case of humanitarian operations.[46]

Babcock also markets the 'Arrowyard' for the AH140, a scalable domestic build option that, according to Babcock's marketing "offers a highly capable, cost effective and tailored approach that drives quality and performance and will bring you a competitive edge in international shipbuilding".[47] It consists of a number of options for sovereign assembly/construction ranging from a basic outfitting yard where ship components are delivered by large and assembled alongside, up to a fully vertically integrated yard capable of constructing an entire vessel from basic steel materials within the facility itself. Arrowyard is part of Babcock's business model for the AH140 of indigenous design as a means of building up a secure relationship with export nations and their industrial / societal base.

Exports

On 30 June 2021, it was reported that Babcock was in discussions with Greece, Indonesia, Poland and two other countries about potential Type 31 (AH140) contracts.[48]

On 16 September 2021, Babcock announced that it had signed an agreement with PT PAL Indonesia allowing it to design two AH140 derivatives for the Indonesian Navy.[49] The class are known locally as Fregat Merah Putih ("Red-White Frigate").[50] The first steel cut of the first Red White frigate were done on 9 December 2022.

On 4 March 2022, Babcock announced that it won the frigate competition for the Polish Navy. The Polish Armaments Agency selected Babcock's AH140 from three different platform design proposals provided by the PGZ-MIECZNIK Consortium ("Miecznik" is Polish for "Swordfish). In August 2023, the construction of the first in a series of three Projekt 106 frigates began at PGZ Stocznia Wojenna.

On 21 March 2022, Greece selected a variant of Naval Group's FDI frigate over the AH140.[51]

Following suggestions that the Royal Australian Navy (RAN) might adopt a "Two-Tier" surface combatant mix pairing the tier one Hobart-class destroyers and Hunter-class frigates with a smaller, less capable, but cheaper class to create an "optimal mix" for the RAN; Babcock Australasia reportedly offered the Arrowhead 140 to meet this possible requirement if it were officially announced.[52] in August 2023, Australian Financial Review reported that Babcock had proposed a joint Australian / New Zealand AH140 program to replace their respective Anzac-class frigates.[53] In October 2023, Babcock formally began building its bid for the Royal New Zealand Navy (RNZN) and started looking for NZ based small medium enterprises (SMEs) to develop a domestic supply chain.[54]

On 20 February 2024, the long-awaited intendent review of the Australian Surface Fleet was published, formally announcing the requirement for eleven general-purpose frigates to supplement the now six Hunter-class frigates in replacing the ageing Anzac-class frigates. These ships would be initially built on existing overseas production lines prior to moving to Australia as a means of speeding up delivery to the RAN. Of the four exemplar designs recommended by the review as candidates for the new frigate requirement, the AH140 design was not one of them.[55]

Characteristics

Royal Navy – Type 31 (Inspiration class)

The Inspiration class will have a length of 138.7m (455.1feet), a beam of 20.36m (66.8feet) and a displacement of 7000t. It will have a crew complement of 107, a total range of 7500 nmi, and a top speed of 26+ knots.[56] [57]

The procurement of the equipment fit for the Type 31 differs greatly from traditional practices, with designs decisions being made by the prime contractor [Babcock] or mission systems integrator [Thales] acting as the design authority rather than the Defence Equipment and Support (DE&S) organisation or Royal Navy personnel, in accordance to key characteristics laid down by the Ministry of Defence (MoD) for a general purpose frigate.[58] The published Babcock engineering paper states :

On 1 October 2020, BAE Systems Bofors announced it was under contract to supply five Bofors 57 mm Mk3 medium calibre guns and ten Bofors 40 mm Mk4 small calibre guns to the Royal Navy for the first five Type 31 frigates.[59] The 57 mm Mk3 will equip the A position whilst two 40 mm Mk4s will be mounted in positions B and Y in a broadside configuration. In November 2022 the MoD placed a contract with BAE Systems Bofors

In 2019, Forces News reported that the design would have Sea Ceptor (CAMM) missiles, an advanced air and surface surveillance and target indication radar such as the Thales NS110[60] and be able to operate either an AgustaWestland Wildcat HMA2 or an AgustaWestland Merlin HM2.[61] Type 31 will have the first 4D Dual-Axis, Multi-Beam, Active Electronically Scanned Array (AESA) Radar to be fitted to a RN Frigate [Thales NS110].

The vertical launching system for the Type 31 and its associated missile loadout has gone through a number of revisions over the course of its development. Originally, the design would retain, but would however be "fitted-for-but-not-with" its 32-cell strike length Mark 41 Vertical Launching System and in its place was to be a Sea Ceptor 24-cell 'mushroom farm' in a similar configuration as found on the Type 23 frigates.[62] [63] This was later revised with a more modular version of the launcher consisting of two 2x3-cell launch modules with a reduction from 24 to 12 missiles possibly as a cost-saving venture.[64] However, on 17 May 2023, the First Sea Lord Ben Key stated that Type 31 frigates will in fact be fitted with the 32-cell Mark 41 Strike-Length complex.[65] The exact missile mix for the Type 31 with the Mark-41 has yet to be confirmed but will likely consist of at least 32x Sea Ceptor missiles quad-packed into one of the four 8-cell launch modules in addition to possibly integrating the forthcoming surface launched variant(s) of the Future Cruise/Anti-Ship Weapon(s) being developed jointly by the UK, France, and Italy for surface warfare capability. Other sources have previously suggested that the ship might incorporate the canister-launched Naval Strike Missiles which could be migrated over from the retiring Type 23 frigates and be fitted on the Type 31.[66]

In June 2023, the completed bow stem of the lead unit, HMS Venturer, revealed that a bow-mounted sonar will not be part of the initial build of the ship.[67]

On 26 March 2024, it was announced that Sea Gnat fixed decoy launching system would be replaced across the entire Royal Navy's escort fleet with SEA's Ancilia trainable decoy launcher including on the Type 31 following a £135 million contract. A pair of launchers will be mounted to the deck and will each provide twelve ready rounds of Infrared seduction decoys and radio frequency distraction decoys to defeat missile threats and possibly the ability to launch Martlet missiles in the future.[68] [69]

On 14 May 2024, First Sea Lord Ben Key announced that the Type 31 frigate would be equipped with land strike capabilities. The three missiles under consideration are the Naval Strike Missile, Tomahawk cruise missile and the Future Cruise/Anti-Ship Weapon.[70]

In June 2024 a technical paper was published by Babcock International detailing how the crewing solution for the Type 31 Frigate was developed for the Royal Navy, to use the smallest number of personnel possible to operate a large surface combatant:

With the challenges of a reduced number of available trained and experienced personnel to crew RN platforms in the immediate future, against a background of contemporary platforms requiring additional personnel in order to function to their full capability, Type 31 had to be designed from the outset to be as efficient to operate as possible in terms of personnel numbers whist still able to deliver sustainable operational capability. This was a specific requirement placed on the Type 31 design by the RN to be delivered as part of the programme.
This paper details the technology and other considerations within the Type 31 Frigate that enables a smaller crew :
The Type 31 Frigate complement represents an optimum solution at a point in time. Defined by the latest high-TRL technology available that can be delivered into a class of warships in build now, and the various naval rules and regulations against which the ship was designed, Type 31 has the smallest effective and sustainable size of Ship’s Company possible for a 7,000 tonne General Purpose Frigate that is capable of global combat operations.

Indonesia Navy – Fregat Merah Putih

On 25 August 2023, Indonesia state-own shipyard PT PAL Indonesia successfully held the keel laying ceremony for the first Fregat Merah Putih (Red and White Frigate) in Surabaya.[71] The first frigate was laid down on 25 August 2023 at PAL Indonesia shipyard in Surabaya. The first steel cut of the second Red White frigate were done on 5 June 2024.[72]

Polish Navy – Miecznik class

On 16 August 2023, a steel-cutting ceremony took place for the first of the Miecznik-class frigates, ORP Wicher. The ceremony was held at PGZ Stocznia Wojenna in Gdynia.[73]

Also on 16 August 2023, it was announced that PGZ and Babcock signed an agreement including an option to build five more units. If exercised, this would result in at total of eight Miecznik-class vessels being procured by Poland.

Ships of the class

The Royal Navy's five ships will be known as the "Inspiration class". In May 2021, the names of the five Type 31 ships were announced by the First Sea Lord; these were selected to represent key themes of the future plans of the Royal Navy and Royal Marines:[74]

As of 2021, all ships were planned to be service by February 2030,[76] though by mid-2024, that plan may have slipped by at least a few months.[77] Italics indicate estimated date.

NamePennant No.BuilderOrderedLaid downLaunchedCommissionedStatus
[78] Babcock International, Rosyth15 November 201926 April 2022[79] Mid-2024?[80] Projected late 2026/early 2027[81] Under construction; first steel cut 23 September 2021[82] [83]
16 September 2023[84] Under construction; first steel cut 24 January 2023[85]
Under construction[86]
Announced
Announced
TBCPAL Indonesia, SurabayaBabcock International, Rosyth16 September 202125 August 2023Under construction; first steel cut 9 December 2022
TBCUnder construction; first steel cut 5 June 2024[87]
Wicher (Gale)PGZ Stocznia Wojenna, GdyniaBabcock International, Rosyth4 March 202231 January 2024[88] Under construction; first steel cut on 16 August 2023[89] [90]
Burza (Storm)Announced
Huragan (Hurricane)Announced

See also

Bibliography

Notes and References

  1. News: 21 July 2016 . Oral evidence: Naval Procurement: Type 26 and Type 45 HC 221 . UK House of Commons Defence Select Committee . 21 July 2016.
  2. News: Tovey . Alan . 30 June 2021 . Babcock in talks to sell 'budget frigates' to five countries . The Telegraph . subscription.
  3. Web site: Malufti . Fauzan . 26 August 2023 . Indonesia Lays Keel Of First 'Red White' Frigate . 26 August 2023 . navalnews.com .
  4. Web site: Rangga Baswara . Sawiyya. 10 December 2022 . Pemotongan baja pertama Kapal Fregat Merah Putih telah dilakukan oleh PT PAL . The first steel cutting of the Red and White Frigate Ship was carried out by PT PAL . 19 December 2022 . Airspace Review . id .
  5. Web site: Allison . George . 4 March 2022 . British company Babcock wins Polish frigate competition . 4 March 2022 . UK Defence Journal.
  6. News: BAE wins £127m contract to design Navy warship . BBC . 25 March 2010 . 26 July 2011.
  7. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/478933/52309_Cm_9161_NSS_SD_Review_web_only.pdf National Security Strategy and Strategic Defence and Security Review 2015
  8. News: Collingridge . John . 7 August 2016 . New frigate order will keep shipyards afloat . The Times .
  9. Web site: Restoring the Fleet: Naval Procurement and the National Shipbuilding Strategy . 21 November 2016 . publications.parliament.uk . House of Commons Defence Committee . 30 May 2020.
  10. Web site: National Security Strategy and Strategic Defence and Security Review 2015: A Secure and Prosperous United Kingdom . Government of the United Kingdom . November 2015 . 18 March 2016.
  11. Web site: First Sea Lord's defence and security lecture to the City of London. 21 July 2016 . UK Ministry of Defence. 24 July 2016.
  12. Web site: Scott . Richard . 13 July 2016 . BAE unveils General Purpose Frigate concepts . dead . https://web.archive.org/web/20160801004624/http://www.janes.com/article/62246/bae-unveils-general-purpose-frigate-concepts . 1 August 2016 . 15 July 2016 . IHS Janes.
  13. Web site: Defence in the Media: 7 August 2016. 7 August 2016 . UK Ministry of Defence. 8 August 2016.
  14. News: Collingridge . John . 7 August 2016 . New frigate order will keep shipyards afloat . thetimes.co.uk . The Sunday Times . 8 August 2016.
  15. Web site: Credible choices UK General Purpose Frigate programme . https://web.archive.org/web/20160918103842/http://www.janes360.com/images/assets/408/62408/Credible_choices_UK_General_Purpose_Frigate_programme.pdf . 18 September 2016 . 24 July 2016 . IHS Janes.
  16. Web site: Type 31e launch folder . 7 September 2017.
  17. Web site: Request for information to support Type 31e market testing . 24 October 2018 . gov.uk.
  18. News: Hollinger . Peggy . 25 July 2018 . BAE Systems takes below-deck role on UK's Type 31 frigate . ft.com . Financial Times . 25 July 2018.
  19. Web site: National Shipbuilding Strategy: the future of naval shipbuilding in the UK . . 6 September 2017 . gov.uk . British Ministry of Defence . 26 August 2019 . We have set a maximum £250 million per ship price for the Type 31e.
  20. Web site: The Avenger, a possible yet unpopular contender for the Type 31 Frigate. George. Allison. 6 September 2017.
  21. Web site: The BAE Cutlass, could this be the new Type 31 Frigate?. George. Allison. 5 September 2017.
  22. Web site: BMT tout Venator-110 as the 'natural design choice' for the Type 31 Frigate. George. Allison. 6 September 2017.
  23. Web site: Spartan – A contender for the Type 31 Frigate?. George. Allison. 5 July 2017.
  24. Web site: Babcock unveil Arrowhead 120, a contender for the Type 31 Frigate. George. Allison. 8 September 2017.
  25. Web site: BAE and Cammell Laird to bid for UK's £1.25bn Type 31 frigate programme . . 23 October 2017 . Naval Technology . 25 October 2017 . 24 October 2017 . https://web.archive.org/web/20171024085511/http://www.naval-technology.com/news/newsbae-cammell-laird-to-bid-for-uks-125bn-type-31e-frigate-programme-5954211 .
  26. Web site: BAE Systems teams with Cammell Laird for UK Type 31 frigate build . . 18 October 2017 . Naval Today . 25 October 2017 .
  27. Web site: Babcock and BMT team up on Type 31e Frigate bid . George . Allison . 9 November 2017 . UK Defence Journal . 9 November 2017 .
  28. Web site: Babcock launches 'Team 31', selects Arrowhead 140 design for Type 31e frigate competition. George. Allison. 31 May 2018.
  29. News: Haynes . Deborah . 25 July 2018 . Contest to build a 'budget frigate' on hold as MoD runs out of funds . www.thetimes.co.uk . The Times . 25 July 2018.
  30. News: Gleeson . Bill . 23 August 2018 . Laird's bids for £1.25bn Navy ships contract . Liverpool Echo.
  31. Web site: Three bids for the Royal Navy Type 31e frigate competition formally accepted by the MoD . . 10 December 2018 . Save the Royal Navy . 13 December 2018.
  32. News: Clyde shipyard Ferguson set to go into administration . 16 August 2019 . BBC News . 9 August 2019.
  33. News: Iconic Belfast shipyard Harland & Wolff enters administration after 160 years . 16 August 2019 . Belfast Telegraph Digital . 15 August 2019.
  34. News: Tovey . Alan . 24 August 2019 . Babcock set to build new cut-price frigates and weaken BAE shipbuilding monopoly . Daily Telegraph . London . 26 August 2019.
  35. Web site: Type 31 Programme Accounting Officer Assessment. Lovegrove . Stephen . 20 January 2020 . assets.publishing.service.gov.uk . UK Ministry of Defence . 6 February 2020 .
  36. Web site: Naval shipbuilding: February 2020 update . Brooke-Holland . Louise . 5 February 2020 . researchbriefings.parliament.uk . UK parliament library . 6 February 2020 .
  37. Web site: Bahtić . Fatima . 12 September 2022 . UK: All five Type 31 frigates to be delivered by 2028 .
  38. Web site: Royal Navy formally announces the names of the 'inspiration class' Type 31 frigates | Navy Lookout. 19 May 2021 .
  39. Johnson . J. . Howard . M. . Type 31 Frigate: Complex Warship Design for a Dynamic Operational Environment . Conference Proceedings of INEC . 10.24868/10665 .
  40. Web site: Adaptable Configuration . 2 October 2023 . www.arrowhead140.com.
  41. Web site: 26 June 2023 . Babcock showcases Arrowhead 140 Multi-Role Naval Platform concept with view to Type 32 frigate competition Navy Lookout . 2 October 2023 . www.navylookout.com .
  42. Web site: The Cube – SH Defence . 2 October 2023 . da-DK.
  43. Web site: 16 January 2023 . Developing the Type 31 frigate Navy Lookout . 2 October 2023 . www.navylookout.com .
  44. Johnson . J. . Howard . M. . Type 31 Frigate: Complex Warship Design for a Dynamic Operational Environment . Conference Proceedings of INEC . 10.24868/10665 .
  45. Web site: Navy Lookout . PT PAL shipyard Indonesia about to cut steel on the first Arrowhead-140/Type 31 derivate frigate. . 2 October 2023 . Twitter .
  46. Web site: Arrowhead 140 . 30 October 2023 . www.arrowhead140.com.
  47. Web site: Arrowyard™ . 2023-11-06 . www.arrowhead140.com.
  48. Web site: 2021-06-04 . Babcock offers the Arrowhead-140 frigate design to Greek Navy Navy Lookout . 2023-11-07 . www.navylookout.com . en-GB.
  49. Web site: 16 September 2021 . Babcock sells first new frigate design licence to Indonesia . 16 September 2021 . Babcock International .
  50. Web site: 7 November 2022 . Indo Defence 2022: Indonesia prepares to cut steel on first 'Red-White' frigate . 19 December 2022 . janes.com.
  51. Web site: 2022-03-24 . Thales welcomes Greece's decision to acquire three Belh@rra® frigates . 2023-11-07 . Thales Group . en.
  52. Web site: Felton . Ben . 5 October 2023 . Australian Navy Force Structure Decisions Delayed Again . 6 October 2023 . Naval News .
  53. Web site: 10 August 2023 . Australia-NZ could combine on deal for smaller, missile-laden frigates . 6 October 2023 . Australian Financial Review .
  54. Web site: 26 October 2023 . Babcock to Offer Arrowhead to Aotearoa New Zealand . 27 October 2023 . Naval News .
  55. Web site: 20 February 2024 . ENHANCED LETHALITY SURFACE COMBATANT FLEET - Independent Analysis of the Navy's Surface Combatant Fleet . 26 February 2024 . Defence.gov.au.
  56. Web site: 31 October 2023 . Inspiration Class . 31 October 2023 . Royal Navy.
  57. Web site: Johnson . J . 18 June 2024 . From UMS to Full Autonomy: Experience from a Complex Warship Programme . Paper discussing the crew solution for the Type 31 Frigate.
  58. Web site: 16 January 2023 . Developing the Type 31 frigate. 31 October 2023 . www.navylookout.com .
  59. News: . BAE Systems awarded naval guns contract for U.K.'s Type 31 frigate program . BAE Systems International . 1 October 2020 . 1 October 2020.
  60. News: Thomas . Richard . 27 December 2019 . Naval review 2019: The never-ending Year of the (Royal) Navy . Shephard News . London . 31 December 2019 .
  61. News: . Babcock Set For Type 31 Contract To 'Bring Shipbuilding Home' . Forces News . London . 12 September 2019 . 12 September 2019 .
  62. News: 2 November 2021 . Royal Navy looking to 'increase lethality' of Type 31 Frigates . . 3 November 2021.
  63. Web site: 5 July 2019 . In focus – the Arrowhead 140 Type 31e frigate candidate . 31 October 2023 . www.navylookout.com .
  64. Web site: 2020-02-07 . The Type 31 frigate in view Navy Lookout . 2023-11-07 . www.navylookout.com . en-GB.
  65. Web site: Royal Navy's Type 31 frigates to be fitted with Mk41 vertical launch system . 17 May 2023 . Navy Lookout.
  66. Web site: 23 November 2022 . New missile selection ends UK's anti-ship dilemma, for now .
  67. The bow stem of HMS Venturer moved into the paint hall in Rosyth yesterday. Confirms Type 31 frigates will not have bow-mounted sonar . 1669240137799041024 . NavyLookout . 14 June 2023 . 17 June 2023.
  68. Web site: Staff . Naval News . 2024-03-26 . Royal Navy Selects SEA's Ancilia Decoy Launching System . 2024-04-29 . Naval News . en-US.
  69. Web site: 2024-04-29 . Royal Navy to equip 19 ships with trainable decoy launchers Navy Lookout . 2024-04-29 . www.navylookout.com . en-GB.
  70. News: Britain to arm frigates with land attack missiles . 21 May 2024 . . 14 May 2024.
  71. Web site: Pusat Kodifikasi Kementerian Pertahanan . 2024-05-15 . www.kemhan.go.id.
  72. Web site: Indonesia Mulai Bangun Kapal Fregat Merah Putih Unit Kedua . kompas.com . 5 June 2024 . 6 June 2024 . ID.
  73. Web site: Poland Could Order Five More Miecznik Frigates . 18 August 2023 .
  74. Web site: Ships to inspire – names of Type 31 frigates revealed . . 19 May 2021 . Royal Navy . 19 May 2021.
  75. Web site: Royal Navy's Type 31 frigates have names; HMS Active recalls her predecessor and Falklands liberation . MercoPress South Atlantic . 19 June 2021 . 20 June 2021.
  76. Web site: Royal Navy formally announces the names of the 'inspiration class' Type 31 frigates . . 19 May 2021 . Navy Lookout. 19 May 2021.
  77. Web site: Navy Lookout . 2 August 2024 . Royal Navy frigate strength to get worse before it gets better . 4 August 2024.
  78. 1421117592945704960. NavyLookout. Babcock plans to cut steel on HMS.... 30 July 2021.
  79. Web site: Keel laying for Royal Navy's Type 31 frigate showcases Babcock workforce . Babcock International . 26 April 2022 . 28 April 2020.
  80. Web site: Bahtić . Fatima . Babcock: Float-off of UK's first Type 31 frigate expected in first half of 2024 . Naval Today . 29 December 2023 . https://web.archive.org/web/20231228165233/https://www.navaltoday.com/2023/12/28/babcock-float-off-of-uks-first-type-31-frigate-expected-in-first-half-of-2024/ . 28 December 2023 . en . 28 December 2023 . live.
  81. Web site: Suciu . Peter . The Royal Navy's Type 31 Frigate Looks Like a Real Powerhouse . The National Interest . 7 March 2024 . 27 April 2024.
  82. Web site: Steel cut for first Type 31 frigate – HMS Venturer | Navy Lookout. 23 September 2021 .
  83. First steel cut for Royal Navy Type 31 programme . Government of the United Kingdom . 23 September 2021 . 23 September 2021.
  84. Web site: Keel laid for second Type 31 frigate – HMS Active . 16 September 2023 . 16 September 2023 . Navy Lookout.
  85. Web site: David . Sivills-McCann . Simon . Hunter . First steel cut on Royal Navy's second Type 31 frigate . 24 January 2023 . Forces Network . 24 January 2023 .
  86. Web site: Royal Navy Fleet Poster p.20 . February 2023 . Navy News . 13 June 2023.
  87. Web site: 5 June 2024 . Indonesia Mulai Bangun Unit Kedua Fregat Merah Putih untuk TNI AL . Indonesia Defense.
  88. Web site: Poland lays keel of first Miecznik-class frigate . Naval News. February 2024 .
  89. Web site: 10 April 2022 . Tayfun . Ozberk . First Look At Poland's New Miecznik Frigate. www.navalnews.com. 10 April 2022. https://web.archive.org/web/20220410092917/https://www.navalnews.com/naval-news/2022/04/first-look-at-polands-new-miecznik-frigate. 10 April 2022. live.
  90. Web site: 16 August 2023 . Poland Starts Construction on New Miecznik Frigate . 26 August 2023 . Naval News .