Graz tramway network | |
Locale: | Graz, Styria, Austria |
Status: | Operational |
Lines: | 6 |
Owner: | City of Graz |
Operator: | Holding Graz (since) |
Minimum Radius Of Curvature: | 17,5 m |
Speed: | 70km/h max. |
El: | 600 V DC |
Depot: | Remise I (Alte Poststraße), II and III (Steyrergasse) |
Stock: | 86 |
Route Length: | 70.4km (43.7miles) |
Stops: | 95 |
Pass Year: | 2012 |
Passengers: | 53.56 million |
Map State: | show |
Website: | http://www.holding-graz.at/linien.html Holding Graz Linien |
Era1 Name: | Horse tram |
Era1 Start Year: | 1878 |
Era1 End Year: | 1899 |
Era1 State: | show |
Era1 Owner: | Grazer Tramway |
Era1 Operator: | Grazer Tramway |
Era1 Propulsion System: | Horses |
Era2 Name: | Electric tram |
Era2 End Year: | present |
Era2 State: | show |
Era2 Status: | Still running |
Era2 Operator: | Holding Graz (since) |
Era2 Propulsion System: | Electricity |
Era2 El: | 600 V DC |
Historical Line 2 (Circle line) Hauptbahnhof - Hauptbahnhof | |
Native Name: | Linie 2 (Ringlinie) |
Native Name Lang: | de |
Color: | ff0000 |
Linelength: | 6km (04miles) |
Stations: | 17 (1899-1953) 18 (1954-62) 14 (1962-63) 12 (1963-71) |
Start: | Hauptbahnhof |
End: | Hauptbahnhof (until 1962) Keplerbrücke (until 1963) Wormgasse (until 1971) |
Open: | as horse tramway as electric tramway |
Close: | connection Hbf Keplerstraße Wickenburgg. remaining parts |
Mapcolor: | red (until) |
Map State: | collapsed |
The Graz tramway network is a network of tramways forming an important part of the public transport system in Graz, which is both the capital city of the federal state of Styria, Austria, and the second largest city in Austria.
In operation since 1878, the network presently has six daytime lines, and five evening and Sunday lines., the Graz tram network ran on an almost 60km (40miles) of route, and served 53.56 million passengers.[1] It is operated by the Graz Linien division of Holding Graz, the city owned utility company who also operate the city's bus network and the Schlossbergbahn funicular railway. The trams form part of the styrian integrated fare system which covers all modes of public transport in Graz and Styria.
The Tramway Museum Graz, at the terminus of line 1 in Mariatrost, holds many exhibits relating to the system.[2]
The first trams to run in Graz were horse trams in private ownership, with service commencing in 1878. The lines were electrified from 1899. In 1939, the tram network was acquired by the city.[2]
In 1941, the narrow gauge electric railway that had linked Graz with the suburb of Mariatrost since 1898, was converted to standard gauge and became part of the tram network. The resulting long outer section of tram route 1 still retains many light railway features, with its off-street routing and long stretches of single track.[2] [3]
The Graz tram network reached a peak in 1950. Growing car ownership, and the growth of residential areas in outer reaches of the city not served by the trams, led to a fall in tram usage and eventually, after 1950, the closure of several tram routes. The city introduced trolleybuses in 1941 to serve the outer areas of the city, but these were replaced by motor buses by 1967.[2]
In the 1990s, with the city's narrow central streets proving ill-suited to large quantities of private car traffic, the city adopted a policy of improving and expanding public transport, with modernisation and extension of the tramway. The area around Jakominiplatz was developed as the main tram and city bus interchange from 1995, whilst extensions to Puntigam, Liebenau/Murpark and St Peter followed in 2006 and 2007.[2]
In 2001, Graz was the launch customer for the Bombardier Transportation's Cityrunner design, with the acquisition of 18 27m (89feet) long five-section trams. These were the city's first 100% low-floor trams, although the concept was introduced in 1999 by the fitting of new low-floor centre sections to 12 existing trams.[2]
In 2007, Graz ordered 45 Stadler Variobahn trams for delivery between 2009 and 2015. These vehicles proved controversial, with complaints over noise and vibration levels. Initially confined to the north–south axis lines 4 and 5, the trams started operating on the east–west axis in 2013, after modifications and imposition of a speed limit.[2] [4]
In 2012, new tram tunnels were built to serve the city's main railway station (Graz Hauptbahnhof), which was previously the terminus of two tram lines and some distance from the main westbound tram route. Trams on the main line now stop in a new subsurface tram station in the station forecourt area. This allows the station to be served by four of the city's six lines.[2]
In 2016 a new extension of line 7 in order to serve the new medical campus of the University of Graz in Stiftingtalstraße was constructed and opened to the public on 11 September 2016. The line was extended by one stop from the previous terminus at St. Leonhard.[5]
Line Eggenberg/UKH - Mariatrost | |
Native Name: | Linie |
Native Name Lang: | de |
Color: | 009FDD |
Linelength: | 11.2km (07miles) |
Stations: | 32 |
Start: | Eggenberg/UKH |
End: | Mariatrost |
Mapcolor: | light blue |
Event2label: | Current route since |
Map State: | collapsed |
Line / Andritz - (Jakominiplatz) - Krenngasse | |
Native Name: | Linie / |
Native Name Lang: | de |
Color: | 73B224 |
Color2: | 9D64AA |
Linelength: | 6.5km (04miles) |
Stations: | 19/7 |
Start: | Andritz |
End: | Krenngasse |
Mapcolor: | light green/purple |
Event2label: | Current route since |
Map State: | collapsed |
Line Reininghaus - Liebenau/MURPARK | |
Native Name: | Linie |
Native Name Lang: | de |
Color: | DDA22C |
Linelength: | 8.5km (05.3miles) |
Stations: | 24 |
Start: | Reininghaus |
End: | Liebenau/MURPARK |
Mapcolor: | light brown |
Event2label: | Current route since |
Map State: | collapsed |
Line Andritz - Puntigam | |
Native Name: | Linie |
Native Name Lang: | de |
Color: | 89492B |
Linelength: | 9.8km (06.1miles) |
Stations: | 28 |
Start: | Andritz |
End: | Puntigam |
Mapcolor: | brown |
Event2label: | Current route since |
Map State: | collapsed |
Line /16 Smart City - St. Peter | |
Native Name: | Linie /16 |
Native Name Lang: | de |
Color: | 005D35 |
Linelength: | 8.2km (05.1miles) |
Stations: | 23 |
Start: | Smart City/P.Tunner-Gasse/tim |
End: | St. Peter |
Mapcolor: | green |
Event2label: | Current route since |
Map State: | collapsed |
Line /17 Wetzelsdorf - LKH Med Uni/Klinikum Nord | |
Native Name: | Linie /17 |
Native Name Lang: | de |
Color: | F39300 |
Linelength: | 7.7km (04.8miles) |
Stations: | 25 |
Start: | Wetzelsdorf |
End: | LKH Med Uni/Klinikum Nord |
Mapcolor: | orange |
Event2label: | Current route since |
Map State: | collapsed |
The following services operate during the day on Mondays to Saturdays:[6]
The following services operate in the evenings and on Sundays:
Graz's tram network is built to standard gauge and is electrified using overhead line at 600 V DC. The network is largely double track, with some of single track on the northern, former light railway, section of line 1, and just over towards the southern terminus of line 5 (construction work to expand line 5 to double tracks will finish in November 2024). Most of the track is at grade, with the exception of the subsurface tram stop, with linking tunnels, at the main railway station, and a short tunnel just before the southern terminus of line 5.[2] [7]
With the exception of the short tunnelled sections, and the former light railway section of line 1, all of the system is street based, with varying degrees of segregation. As the trams are single-ended, with doors on only one side, all terminal locations are equipped with turning loops, and all tram stops are to the nearside of the tram.[2] [7]
, the Graz tramway network's fleet was:[8]
Nos. | Image | Manufacturer | Built | Length(mm) | Axles | Wheelbase(mm) | Seated/Standing | Notes | |
---|---|---|---|---|---|---|---|---|---|
501–510 (10) | SGP Graz | 1978 | 25,343 | 8 | 6,000 | 40/94 | |||
601–612 (12) | SGP Graz | 1986–1987 | 27,000 | 8 | 6,000 | 41/126 | Low-floor middle segment installed 1999. | ||
651–668 (18) | Bombardier Transportation | 2000–2001 | 27,000 | 6 | 6,000 | 54/90 | To Bombardier's standard, 100% low-floor, Cityrunner design. | ||
201–245 (45) | Stadler Rail | 2009–2015 | 27,000 | 6 | 6,000 | 54/90 | To Stadler Rail's standard, 100% low-floor, Variobahn design. | ||
– | Alstom | starting 2024 | 33.810 | 6 | 140/60 | Alstom Flexity, service starting 2025, 100 % low-floor[9] |
The Graz tramway network is entirely within zone 101 of the Verbund Linie, an integrated tariff for public transport throughout Styria. Zone 101 tickets are valid on all trams, and all city buses with single or double digit route numbers. They are also valid on regional buses, which have three digit route numbers, and trains, but only within the boundary of the zone.[10]
Tickets are available for different periods of validity, including one hour, 24 hours, a week, a month or a year, and allow unlimited changes of vehicle within the validity period. Tickets can be purchased from ticket machines on board the trams or at the major stops, from tobacconists, or from a central office. They are also available by SMS text message or via a smartphone app.[10]
Aimed at visitors to the city, there is also a three-day ticket which allows unlimited travel within the city for three days, as well as giving reduced admission charges at selected attractions. The ticket is available at hotels and other accommodation, at the city tourist information office, at ticket sale counters at the Schloßbergbahn funicular, and at Graz Airport.[11]
With the introduction of the full set of Variobahn trams, many of Graz's older high-floor trams will be retired. It is also planned to lengthen the new Variobahn trams by adding 2 further sections to the trams.[2]
There are plans for a number of extensions to existing lines plus the building of 1 new line.
On February 5, 2018, the co-financing of a comprehensive expansion program was signed between the city of Graz and, for the first time, the province of Styria. By 2023, 117 million euros are to be allocated for the construction or expansion of six routes. Co-financing from the federal government is being sought.
In mid-April 2021, the plans for the South-West Line (Line 8) were presented. It is scheduled to be built in 2024, with an estimated cost of around 127 million euro
Starting 2025 15 new vehicles of the type Flexity from the manufacturer Alstom are supposed to enter service.[14]