Synchronous grid of Continental Europe explained

The synchronous grid of Continental Europe (also known as Continental Synchronous Area; formerly known as the UCTE grid) is the largest synchronous electrical grid (by connected power) in the world. It is interconnected as a single phase-locked mains frequency electricity grid that supplies over customers in, including most of the European Union. In 2009, of production capacity was connected to the grid, providing approximately of operating reserve margin.[1] The transmission system operators operating this grid formed the Union for the Coordination of Transmission of Electricity (UCTE), now part of the European Network of Transmission System Operators for Electricity (ENTSO-E).

Area

The synchronous grid of Continental Europe covers territory of the ENTSO-E Continental Europe regional group and some neighboring countries not involved in the ENTSO-E. The synchronous grid includes part or all of Austria, Belgium, Bosnia and Herzegovina, Bulgaria, Croatia, Czech Republic, Denmark (western part), France, Germany, Greece, Hungary, Italy, Luxembourg, Montenegro, the Netherlands, North Macedonia, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, and Switzerland as a members of the ENTSO-E Continental Europe regional group. In addition to the ENTSO-E members, the small west electricity island of Ukraine is synchronized with the grid of Continental Europe. Albania is operating the national grid synchronously with the synchronous grid of Continental Europe. The grids of Morocco, Algeria and Tunisia are synchronised with the European grid through the Gibraltar AC link and form the SWMB. In April 2015, the grid of Turkey was synchronized with the European grid.[2]

Although synchronous, some countries operate in a near island mode, with low connectivity to other countries. The European Commission considers high connectivity to be beneficial, and has listed several interconnection projects as Projects of Common Interest.[3] However, the national grids must also be upgraded to handle increased power flows if the values of a free energy market are to be realised in the EU.[4]

On 16 March 2022, during the 2022 Russian invasion of Ukraine, the ENTSO-E set up synchronisation with the networks of Ukraine and Moldova on an emergency basis to provide external support for the power supply in those countries.[5] (Plans for Ukraine to shift from the Russian grid to the European grid were already in progress, with an experimental disconnect from the Russian grid underway when the invasion occurred.[6]) Power exchange and integration gradually increased,[7] and by August 2022, 400—700 MW were sent from Ukraine to Eastern parts of EU.[8]

List of electricity interconnection levels

Electricity interconnection as percentage (EIL = electricity interconnection level) of installed electricity production capacity in 2014; the EU goal of at least 10% for 2020, and 15% for 2030.[9]

Alternative formulas for calculating interconnection levels are based on peak load instead of installed capacity.[10]

Some border transmissions, particularly around the Alps, have both high utilization rate and high price difference, implying that further transmission would be beneficial.[11]

Country EIL 2014 EIL 2017 Capacity 2019 [GW] Peak load
2018 [GW]
Interconnection level with
InterconnectionGeneration 2002 method 1st Expert
Group's method
29% 11.8 21.3 12.1 55% 98%
17% 19%[12] 8.6 23.1 13.5 37% 64%
11% 1.9 12.7 6.5 15% 29%
69% 3.2 5.0 3.2 64% 99%
0% 0.0 1.5 1.0 0% 0%
17% 9.5 20.8 11.1 45% 85%
44% 51% 7.4 15.9 6.1 46% 121%
1.8 2.8 1.5 65% 120%
30% 3.9 17.3 14.2 23% 28%
10% 22.3 130.7 96.3 17% 23%
10% 28.4 222.4 79.1 13% 36%
11% 1.1 17.1 9.1 6% 12%
29% 6.4 9.1 6.6 70% 97%
9% 0.5 9.8 4.9 5% 11%
7% 11.0 94.4 57.6 12% 19%
2.0 2.8 1.3 71% 161%
2.4 3.6 2.0 67% 121%
245% 1.1 0.3 1.0 409% 105%
0.2 0.7 30%
17% 18% 11.2 30.5 18.5 37% 61%
8.7 30.5 24.1 28% 36%
4% 6.0 42.5 24.5 14% 24%
7% 4.0 19.6 8.7 20% 46%
7% 2.2 18.8 8.9 12% 24%
61% 5.5 7.6 4.5 73% 122%
65% 4.7 3.7 2.4 127% 199%
2% 7.6 104.7 40.6 7% 19%
26% 12.3 40.8 27.4 30% 45%
16.8 16.1 9.8 105% 172%
6% 5.7% (2019)[13] 4.7 78.4 61.4 6% 8%

Interconnections

The British grid is not synchronized with the Continental Europe frequency, but it is interconnected using high-voltage direct current (HVDC) via the HVDC Cross-Channel, BritNed, Nemo Link, IFA-2, North Sea Link, Viking Link and ElecLink links. In 2014, before Nemo Link, IFA-2, ElecLink and North Sea Link became operational, the United Kingdom's electricity interconnection level was 6%.[9]

The networks of Ireland and Northern Ireland form the ENTSO-E Irish regional group, which is not yet interconnected with the Continental Europe grid, but has DC interconnections with the British network through the HVDC Moyle Interconnector and the East–West Interconnector.

Similarly, the Nordic regional group of ENTSO-E (former NORDEL), composed of Norway, Sweden, Finland and the eastern part of Denmark (Zealand with islands and Bornholm), is not synchronized with the Continental Europe, but has a number of non-synchronous DC connections with the Continental Europe grid. Gotland is not synchronized with the Swedish mainland, as it is connected by HVDC.

The network of ENTSO-E Baltic regional group, composed of Lithuania, Latvia and Estonia, currently part of the IPS/UPS system, is interconnected with the Nordic grid at an electricity interconnection level of 10% through the HVDC Estlink cables and NordBalt cable, which is functioning since 2015.[9] The Baltics are also connected with the Continental Europe grid through the Lithuania–Poland interconnection.

The networks of Iceland and Cyprus are not yet interconnected with the other grids. Malta is connected up to 35% via the Malta-Sicily interconnector, commissioned in 2015.

Future extension plans

ENTSO-E is studying the following extensions:

See also

External links

Notes and References

  1. Web site: UCTE Annual REport 2008 . 10 May 2010 . 3 April 2015 . https://web.archive.org/web/20150403103517/https://www.entsoe.eu/fileadmin/user_upload/_library/publications/ce/report_2008.pdf . live .
  2. Web site: ENTSO-E at a Glance. June 2015. ENTSO-E. 13 December 2015. 22 December 2015. https://web.archive.org/web/20151222111517/https://www.entsoe.eu/Documents/Publications/ENTSO-E%20general%20publications/entsoe_at_a_glance_2015_web.pdf . live.
  3. "Union list of projects of common interest " p. 10. European Commission, 18 November 2015.
  4. Book: ACER Market Monitoring Report - 2015 . 30 November 2015 . www.acer.europa.eu . Agency for the Cooperation of Energy Regulators . 978-92-95083-19-6 . 19 July 2016 . 17 August 2016 . https://web.archive.org/web/20160817034329/http://www.acer.europa.eu/Official_documents/Acts_of_the_Agency/Publication/ACER_Market_Monitoring_Report_2015.pdf . live .
  5. Web site: ENTSO-E agrees to start trial synchronization of continental European power grids with those of Ukraine, Moldova from March 16 . live . https://web.archive.org/web/20220316175009/https://en.interfax.com.ua/news/economic/814396.html . 16 March 2022 . 16 March 2022.
  6. Web site: Blaustein . Anna . How Ukraine Unplugged from Russia and Joined Europe's Power Grid with Unprecedented Speed . Scientific American . 29 March 2023 . en.
  7. Web site: Transmission System Operators for Electricity of Continental Europe agree to increase the trade capacity with the Ukraine/Moldova power system . www.entsoe.eu . en-us . 29 July 2022.
  8. Web site: Ukraine will Atomstrom nach Deutschland liefern . stern.de . de . 3 September 2022.
  9. COM/2015/082 final: "Achieving the 10% electricity interconnection target" Text PDF pp. 2–5. European Commission, 25 February 2015. Archive Mirror
  10. Web site: Modelling the European cross-border electricity transmission. en. 27 December 2021. 27 December 2021. https://web.archive.org/web/20211227093100/https://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf. live.
  11. Mezősi . András . Pató . Zsuzsanna . Szabó . László . Assessment of the EU 10% interconnection target in the context of CO 2 mitigation . Climate Policy . 3 July 2016 . 16 . 5 . 659 . 10.1080/14693062.2016.1160864. 156191690 . free . 2016CliPo..16..658M .
  12. Web site: North Sea Region interconnection, Interreg VB North Sea Region Programme . northsearegion.eu . 5 October 2021 . 5 October 2021 . https://web.archive.org/web/20211005231928/https://northsearegion.eu/northsee/e-energy/north-sea-region-interconnection/ . live .
  13. Web site: New cable between Germany and UK advances Europe's integrated power system . Clean Energy Wire . en . 26 July 2021 . 5 October 2021 . 5 October 2021 . https://web.archive.org/web/20211005231925/https://www.cleanenergywire.org/news/new-cable-between-germany-and-uk-advances-europes-integrated-power-system . live .
  14. Web site: The Hidden Threat To Baltic Undersea Power Cables . energy-security.net . Trakimavicius . Lukas . 10 February 2021 . NATO ENSEC COE Energy Security blog . 11 February 2021 . 10 February 2021 . https://web.archive.org/web/20210210155640/http://energy-security.net/2021/02/10/the-hidden-threat-to-baltic-undersea-power-cables/ . dead .
  15. News: "Litgrid" pirmą kartą veikė visiškai savarankiškai – atliko izoliuoto darbo bandymą . . 2023-04-22 . 2023-08-12 . lt.
  16. Web site: Baltic states give Russia notice of electricity grid switch-off date. 16 July 2024. 16 July 2024. LSM.