The Space Shuttle program was the fourth human spaceflight program carried out by the U.S. National Aeronautics and Space Administration (NASA), which accomplished routine transportation for Earth-to-orbit crew and cargo from 1981 to 2011. Its official program name was Space Transportation System (STS), taken from a 1969 plan for a system of reusable spacecraft where it was the only item funded for development, as a proposed nuclear shuttle in the plan was cancelled in 1972.[1] [2] It flew 135 missions and carried 355 astronauts from 16 countries, many on multiple trips.

The Space Shuttle, composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank, carried up to eight astronauts and up to 50000lb of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would reenter the Earth's atmosphere and land like a glider at either the Kennedy Space Center or Edwards Air Force Base.

The Shuttle is the only winged crewed spacecraft to have achieved orbit and landing, and the first reusable crewed space vehicle that made multiple flights into orbit. Its missions involved carrying large payloads to various orbits including the International Space Station (ISS), providing crew rotation for the space station, and performing service missions on the Hubble Space Telescope. The orbiter also recovered satellites and other payloads (e.g., from the ISS) from orbit and returned them to Earth, though its use in this capacity was rare. Each vehicle was designed with a projected lifespan of 100 launches, or 10 years' operational life. Original selling points on the shuttles were over 150 launches over a 15-year operational span with a 'launch per month' expected at the peak of the program, but extensive delays in the development of the International Space Station[3] never created such a peak demand for frequent flights.

Background

Various shuttle concepts had been explored since the late 1960s. The program formally commenced in 1972, becoming the sole focus of NASA's human spaceflight operations after the Apollo, Skylab, and Apollo–Soyuz programs in 1975. The Shuttle was originally conceived of and presented to the public in 1972 as a 'Space Truck' which would, among other things, be used to build a United States space station in low Earth orbit during the 1980s and then be replaced by a new vehicle by the early 1990s. The stalled plans for a U.S. space station evolved into the International Space Station and were formally initiated in 1983 by President Ronald Reagan, but the ISS suffered from long delays, design changes and cost over-runs[3] and forced the service life of the Space Shuttle to be extended several times until 2011 when it was finally retired—serving twice as long as it was originally designed to do. In 2004, according to President George W. Bush's Vision for Space Exploration, use of the Space Shuttle was to be focused almost exclusively on completing assembly of the ISS, which was far behind schedule at that point.

The first experimental orbiter, Enterprise, was a high-altitude glider, launched from the back of a specially modified Boeing 747, only for initial atmospheric landing tests (ALT). Enterprises first test flight was on February 18, 1977, only five years after the Shuttle program was formally initiated; leading to the launch of the first space-worthy shuttle Columbia on April 12, 1981, on STS-1. The Space Shuttle program finished with its last mission, STS-135 flown by Atlantis, in July 2011, retiring the final Shuttle in the fleet. The Space Shuttle program formally ended on August 31, 2011.[4]

Program history

See also: Space Shuttle and List of Space Shuttle missions. All Space Shuttle missions were launched from the Kennedy Space Center (KSC) in Florida. Some civilian and military circumpolar space shuttle missions were planned for Vandenberg AFB in California. However, the use of Vandenberg AFB for space shuttle missions was canceled after the Challenger disaster in 1986. The weather criteria used for launch included, but were not limited to: precipitation, temperatures, cloud cover, lightning forecast, wind, and humidity.[5] The Shuttle was not launched under conditions where it could have been struck by lightning.

The first fully functional orbiter was Columbia (designated OV-102), built in Palmdale, California. It was delivered to Kennedy Space Center (KSC) on March 25, 1979, and was first launched on April 12, 1981—the 20th anniversary of Yuri Gagarin's space flight—with a crew of two.

Challenger (OV-099) was delivered to KSC in July 1982, Discovery (OV-103) in November 1983, Atlantis (OV-104) in April 1985 and Endeavour (OV-105) in May 1991. Challenger was originally built and used as a Structural Test Article (STA-099), but was converted to a complete orbiter when this was found to be less expensive than converting Enterprise from its Approach and Landing Test configuration into a spaceworthy vehicle.

On April 24, 1990, Discovery carried the Hubble Space Telescope into space during STS-31.

In the course of 135 missions flown, two orbiters (Columbia and Challenger) suffered catastrophic accidents, with the loss of all crew members, totaling 14 astronauts.

The accidents led to national level inquiries, detailed analysis of why the accidents occurred, and significant pauses where changes were made before the Shuttles returned to flight.[6] After the Challenger disaster in January 1986, there was a delay of 32 months before the next Shuttle launch.[7] A similar delay of 29 months occurred after the Columbia disaster in February 2003.[6]

The longest Shuttle mission was STS-80 lasting 17 days, 15 hours. The final flight of the Space Shuttle program was STS-135 on July 8, 2011.

Since the Shuttle's retirement in 2011, many of its original duties are performed by an assortment of government and private vessels. The European ATV Automated Transfer Vehicle supplied the ISS between 2008 and 2015. Classified military missions are being flown by the US Air Force's uncrewed spaceplane, the X-37B.[8] By 2012, cargo to the International Space Station was already being delivered commercially under NASA's Commercial Resupply Services by SpaceX's partially reusable Dragon spacecraft, followed by Orbital Sciences' Cygnus spacecraft in late 2013. Crew service to the ISS is currently provided by the Russian Soyuz and, since 2020, the SpaceX Dragon 2 crew capsule, launched on the company's reusable Falcon 9 rocket as part of NASA's Commercial Crew Development program.[9] Boeing's Starliner capsule will start ISS crew service from 2025. For missions beyond low Earth orbit, NASA is building the Space Launch System and the Orion spacecraft, part of the Artemis program.

Accomplishments

Space Shuttle missions have included:

Budget

Early during development of the Space Shuttle, NASA had estimated that the program would cost $7.45 billion ($43 billion in 2011 dollars, adjusting for inflation) in development/non-recurring costs, and $9.3M ($54M in 2011 dollars) per flight.[11] Early estimates for the cost to deliver payload to low-Earth orbit were as low as $118 per pound ($260/kg) of payload ($635/lb or $1,400/kg in 2011 dollars), based on marginal or incremental launch costs, and assuming a 65,000 pound (30 000 kg) payload capacity and 50 launches per year.[12] [13] A more realistic projection of 12 flights per year for the 15-year service life combined with the initial development costs would have resulted in a total cost projection for the program of roughly $54 billion (in 2011 dollars).

The total cost of the actual 30-year service life of the Shuttle program through 2011, adjusted for inflation, was $196 billion.[14] In 2010, the incremental cost per flight of the Space Shuttle was $409 million, or 14186$/kg to low Earth orbit (LEO). In contrast, the comparable Proton launch vehicle cost was $141 million, or 6721$/kg to LEO and the Soyuz 2.1 was $55 million, or 6665$/kg, despite these launch vehicles not being reusable.[15]

NASA's budget for 2005 allocated 30%, or $5 billion, to space shuttle operations;[16] this was decreased in 2006 to a request of $4.3 billion.[17] Non-launch costs account for a significant part of the program budget: for example, during fiscal years 2004 to 2006, NASA spent around $13 billion on the Space Shuttle program,[18] even though the fleet was grounded in the aftermath of the Columbia disaster and there were a total of three launches during this period of time. In fiscal year 2009, NASA budget allocated $2.98 billion for 5 launches to the program, including $490 million for "program integration", $1.03 billion for "flight and ground operations", and $1.46 billion for "flight hardware" (which includes maintenance of orbiters, engines, and the external tank between flights.)

Per-launch costs can be measured by dividing the total cost over the life of the program (including buildings, facilities, training, salaries, etc.) by the number of launches. With 135 missions, and the total cost of US$192 billion (in 2010 dollars), this gives approximately $1.5 billion per launch over the life of the Shuttle program.[19] A 2017 study found that carrying one kilogram of cargo to the ISS on the Shuttle cost $272,000 in 2017 dollars, twice the cost of Cygnus and three times that of Dragon.[20]

NASA used a management philosophy known as success-oriented management during the Space Shuttle program which was described by historian Alex Roland in the aftermath of the Columbia disaster as "hoping for the best".[21] Success-oriented management has since been studied by several analysts in the area.[22] [23] [24]

Accidents

In the course of 135 missions flown, two orbiters were destroyed, with loss of crew totalling 14 astronauts:

There was also one abort-to-orbit and some fatal accidents on the ground during launch preparations.

STS-51-L (Challenger, 1986)

See main article: Space Shuttle Challenger disaster. Close-up video footage of Challenger during its final launch on January 28, 1986, clearly shows that the problems began due to an O-ring failure on the right solid rocket booster (SRB). The hot plume of gas leaking from the failed joint caused the collapse of the external tank, which then resulted in the orbiter's disintegration due to high aerodynamic stress. The accident resulted in the loss of all seven astronauts on board. Endeavour (OV-105) was built to replace Challenger (using structural spare parts originally intended for the other orbiters) and delivered in May 1991; it was first launched a year later.

After the loss of Challenger, NASA grounded the Space Shuttle program for over two years, making numerous safety changes recommended by the Rogers Commission Report, which included a redesign of the SRB joint that failed in the Challenger accident. Other safety changes included a new escape system for use when the orbiter was in controlled flight, improved landing gear tires and brakes, and the reintroduction of pressure suits for Shuttle astronauts (these had been discontinued after STS-4; astronauts wore only coveralls and oxygen helmets from that point on until the Challenger accident). The Shuttle program continued in September 1988 with the launch of Discovery on STS-26.

The accidents did not just affect the technical design of the orbiter, but also NASA.[7] Quoting some recommendations made by the post-Challenger Rogers commission:[7]

STS-107 (Columbia, 2003)

See main article: Space Shuttle Columbia disaster. The Shuttle program operated accident-free for seventeen years and 88 missions after the Challenger disaster, until Columbia broke up on reentry, killing all seven crew members, on February 1, 2003. The ultimate cause of the accident was a piece of foam separating from the external tank moments after liftoff and striking the leading edge of the orbiter's left wing, puncturing one of the reinforced carbon-carbon (RCC) panels that covered the wing edge and protected it during reentry. As Columbia reentered the atmosphere at the end of an otherwise normal mission, hot gas penetrated the wing and destroyed it from the inside out, causing the orbiter to lose control and disintegrate.

After the Columbia disaster, the International Space Station operated on a skeleton crew of two for more than two years and was serviced primarily by Russian spacecraft. While the "Return to Flight" mission STS-114 in 2005 was successful, a similar piece of foam from a different portion of the tank was shed. Although the debris did not strike Discovery, the program was grounded once again for this reason.

The second "Return to Flight" mission, STS-121 launched on July 4, 2006, at 14:37 (EDT). Two previous launches were scrubbed because of lingering thunderstorms and high winds around the launch pad, and the launch took place despite objections from its chief engineer and safety head. A five-inch (13 cm) crack in the foam insulation of the external tank gave cause for concern; however, the Mission Management Team gave the go for launch.[25] This mission increased the ISS crew to three. Discovery touched down successfully on July 17, 2006, at 09:14 (EDT) on Runway 15 at Kennedy Space Center.

Following the success of STS-121, all subsequent missions were completed without major foam problems, and the construction of the ISS was completed (during the STS-118 mission in August 2007, the orbiter was again struck by a foam fragment on liftoff, but this damage was minimal compared to the damage sustained by Columbia).

The Columbia Accident Investigation Board, in its report, noted the reduced risk to the crew when a Shuttle flew to the International Space Station (ISS), as the station could be used as a safe haven for the crew awaiting rescue in the event that damage to the orbiter on ascent made it unsafe for reentry. The board recommended that for the remaining flights, the Shuttle always orbit with the station. Prior to STS-114, NASA Administrator Sean O'Keefe declared that all future flights of the Space Shuttle would go to the ISS, precluding the possibility of executing the final Hubble Space Telescope servicing mission which had been scheduled before the Columbia accident, despite the fact that millions of dollars worth of upgrade equipment for Hubble were ready and waiting in NASA warehouses. Many dissenters, including astronauts, asked NASA management to reconsider allowing the mission, but initially the director stood firm. On October 31, 2006, NASA announced approval of the launch of Atlantis for the fifth and final shuttle servicing mission to the Hubble Space Telescope, scheduled for August 28, 2008. However SM4/STS-125 eventually launched in May 2009.

One impact of Columbia was that future crewed launch vehicles, namely the Ares I, had a special emphasis on crew safety compared to other considerations.[26]

Preservation

Out of the five fully functional shuttle orbiters built, three remain. Enterprise, which was used for atmospheric test flights but not for orbital flight, had many parts taken out for use on the other orbiters. It was later visually restored and was on display at the National Air and Space Museum's Steven F. Udvar-Hazy Center until April 19, 2012. Enterprise was moved to New York City in April 2012 to be displayed at the Intrepid Museum, whose Space Shuttle Pavilion opened on July 19, 2012. Discovery replaced Enterprise at the National Air and Space Museum's Steven F. Udvar-Hazy Center. Atlantis formed part of the Space Shuttle Exhibit at the Kennedy Space Center visitor complex and has been on display there since June 29, 2013, following its refurbishment.[27]

On October 14, 2012, Endeavour completed an unprecedented 12miles drive on city streets from Los Angeles International Airport to the California Science Center, where it has been on display in a temporary hangar since late 2012. The transport from the airport took two days and required major street closures, the removal of over 400 city trees, and extensive work to raise power lines, level the street, and temporarily remove street signs, lamp posts, and other obstacles. Hundreds of volunteers, and fire and police personnel, helped with the transport. Large crowds of spectators waited on the streets to see the shuttle as it passed through the city. Endeavour, along with the last flight-qualified external tank (ET-94), is currently on display at the Science Center's Samuel Oschin Pavilion (in a horizontal orientation) until the completion of the Samuel Oschin Air and Space Center (a planned addition to the California Science Center). Once moved, it will be permanently displayed in launch configuration, complete with genuine solid rocket boosters and external tank.[28] [29]

Crew modules

One area of Space Shuttle applications is an expanded crew.[30] Crews of up to eight have been flown in the Orbiter, but it could have held at least a crew of ten.[30] Various proposals for filling the payload bay with additional passengers were also made as early as 1979.[31] One proposal by Rockwell provided seating for 74 passengers in the Orbiter payload bay, with support for three days in Earth orbit.[31] With a smaller 64 seat orbiter, costs for the late 1980s would be around US$1.5 million per seat per launch.[32] The Rockwell passenger module had two decks, four seats across on top and two on the bottom, including a 25-inch (63.5 cm) wide aisle and extra storage space.[32]

Another design was Space Habitation Design Associates 1983 proposal for 72 passengers in the Space Shuttle Payload bay.[32] Passengers were located in 6 sections, each with windows and its own loading ramp at launch, and with seats in different configurations for launch and landing.[32] Another proposal was based on the Spacelab habitation modules, which provided 32 seats in the payload bay in addition to those in the cockpit area.[32]

There were some efforts to analyze commercial operation of STS.[33] Using the NASA figure for average cost to launch a Space Shuttle as of 2011 at about $450 million per mission, [34] a cost per seat for a 74[35] seat module envisioned by Rockwell came to less than $6 million, not including the regular crew. Some passenger modules used hardware similar to existing equipment, such as the tunnel,[35] which was also needed for Spacehab and Spacelab

Successors

During the three decades of operation, various follow-on and replacements for the STS Space Shuttle were partially developed but not finished.[36]

Examples of possible future space vehicles to supplement or supplant STS:[36]

One effort in the direction of space transportation was the Reusable Launch Vehicle (RLV) program, initiated in 1994 by NASA.[38] This led to work on the X-33 and X-34 vehicles.[38] NASA spent about US$1 billion on developing the X-33 hoping for it be in operation by 2005.[38] Another program around the turn of the millennium was the Space Launch Initiative, which was a next generation launch initiative.[39]

The Space Launch Initiative program was started in 2001, and in late 2002 it was evolved into two programs, the Orbital Space Plane Program and the Next Generation Launch Technology program.[39] OSP was oriented towards provided access to the International Space Station.[39]

Other vehicles that would have taken over some of the Shuttles responsibilities were the HL-20 Personnel Launch System or the NASA X-38 of the Crew Return Vehicle program, which were primarily for getting people down from ISS. The X-38 was cancelled in 2002,[40] and the HL-20 was cancelled in 1993.[41] Several other programs in this existed such as the Station Crew Return Alternative Module (SCRAM) and Assured Crew Return Vehicle (ACRV)[42]

According to the 2004 Vision for Space Exploration, the next human NASA program was to be Constellation program with its Ares I and Ares V launch vehicles and the Orion spacecraft; however, the Constellation program was never fully funded, and in early 2010 the Obama administration asked Congress to instead endorse a plan with heavy reliance on the private sector for delivering cargo and crew to LEO.

The Commercial Orbital Transportation Services (COTS) program began in 2006 with the purpose of creating commercially operated uncrewed cargo vehicles to service the ISS.[43] The first of these vehicles, SpaceX Dragon 1, became operational in 2012, and the second, Orbital Sciences's Cygnus did so in 2014.[44]

The Commercial Crew Development (CCDev) program was initiated in 2010 with the purpose of creating commercially operated crewed spacecraft capable of delivering at least four crew members to the ISS, staying docked for 180 days and then returning them back to Earth.[45] These spacecraft, like SpaceX's Dragon 2 and Boeing CST-100 Starliner were expected to become operational around 2020.[46] On the Crew Dragon Demo-2 mission, SpaceX's Dragon 2 sent astronauts to the ISS, restoring America's human launch capability. The first operational SpaceX mission launched on November 15, 2020, at 7:27:17 p.m. ET, carrying four astronauts to the ISS.

Although the Constellation program was canceled, it has been replaced with a very similar Artemis program. The Orion spacecraft has been left virtually unchanged from its previous design. The planned Ares V rocket has been replaced with the smaller Space Launch System (SLS), which is planned to launch both Orion and other necessary hardware.[47] Exploration Flight Test-1 (EFT-1), an uncrewed test flight of the Orion spacecraft, launched on December 5, 2014, on a Delta IV Heavy rocket.[48]

Artemis 1 is the first flight of the SLS and was launched as a test of the completed Orion and SLS system.[49] During the mission, an uncrewed Orion capsule spent 10 days in a 57000km (35,000miles) distant retrograde orbit around the Moon before returning to Earth.[50] Artemis 2, the first crewed mission of the program, will launch four astronauts in 2024[51] on a free-return flyby of the Moon at a distance of 8520sp=usNaNsp=us.[52] [53] After Artemis 2, the Power and Propulsion Element of the Lunar Gateway and three components of an expendable lunar lander are planned to be delivered on multiple launches from commercial launch service providers.[54] Artemis 3 is planned to launch in 2025 aboard a SLS Block 1 rocket and will use the minimalist Gateway and expendable lander to achieve the first crewed lunar landing of the program. The flight is planned to touch down on the lunar south pole region, with two astronauts staying there for about one week.[55] [56] [57] [58]

Gallery

Assets and transition plan

The Space Shuttle program occupied over 654 facilities, used over 1.2 million line items of equipment, and employed over 5,000 people. The total value of equipment was over $12 billion. Shuttle-related facilities represented over a quarter of NASA's inventory. There were over 1,200 active suppliers to the program throughout the United States. NASA's transition plan had the program operating through 2010 with a transition and retirement phase lasting through 2015. During this time, the Ares I and Orion as well as the Altair Lunar Lander were to be under development,[59] although these programs have since been canceled.

In the 2010s, two major programs for human spaceflight are Commercial Crew Program and the Artemis program. Kennedy Space Center Launch Complex 39A is, for example, used to launch Falcon Heavy and Falcon 9.

Criticism

See main article: Criticism of the Space Shuttle program.

Support vehicles

Many other vehicles were used in support of the Space Shuttle program, mainly terrestrial transportation vehicles.

See also

Simulation
Physics
Other spaceflight programs
Similar vehicles

References

Footnotes

Citations

Further reading

External links

Notes and References

  1. Web site: Portree . David S. F. . The Last Days of the Nuclear Shuttle (1971) . Wired.com . August 1, 2024.
  2. Web site: Space Task Group Report, 1969. Roger D.. Launius. NASA. 1969. July 31, 2024. January 14, 2016. https://web.archive.org/web/20160114031850/http://www.hq.nasa.gov/office/pao/History/taskgrp.html. live.
  3. Web site: International Space Station Historical Timeline. Center for Advancement of Science in Space. November 27, 2022.
  4. Web site: Breaking News | Shannon to review options for deep space exploration . Spaceflight Now . August 29, 2011 . May 17, 2012.
  5. Web site: Space Shuttle Weather Launch Commit Criteria and KSC End of Mission Weather Landing Criteria. KSC Release No. 39-99. NASA Kennedy Space Center. July 6, 2009. dead. https://web.archive.org/web/20090626180630/http://www-pao.ksc.nasa.gov/kscpao/release/1999/39-99.htm. June 26, 2009.
  6. Web site: Columbia's White External Fuel Tanks. Space.com. April 12, 2006.
  7. Web site: Return to Flight...Challenger Accident. John A.. Logsdon.
  8. News: Secretive US space plane X-37B lands after record 908 days in orbit. November 14, 2022. New Scientist. November 27, 2022.
  9. Web site: NASA, Partners Update Commercial Crew Launch Dates . NASA Commercial Crew Program Blog . February 6, 2019 .
  10. Web site: Spacelab joined diverse scientists and disciplines on 28 Shuttle missions. NASA. March 15, 1999. February 11, 2011.
  11. Book: Bulletin of the Atomic Scientists. February 1973. 39.
  12. NASA (2003) Columbia Accident Investigation Board Public Hearing Transcript
  13. Web site: Report to the Congress: Cost-Benefit Analylsis Used in Support of the Space Shuttle Program. https://ghostarchive.org/archive/20221009/http://archive.gao.gov/f0302/096542.pdf . October 9, 2022 . live. November 25, 2008. United States General Accounting Office. 1972. Comptroller General.
  14. News: Borenstein. Seth. Space shuttle's legacy: Soaring in orbit and costs. September 30, 2021. Phys.org. July 5, 2011. Associated Press.
  15. Xu. Hollingsworth. Smith. Qin. Peter. Katharine . Launch Cost Analysis and Optimization Based on Analysis of Space System Characteristics . Transactions of the Japan Society for Aeronautical and Space Sciences . July 2019 . 62 . 4 . 177–178 . 10.2322/tjsass.62.175 . January 13, 2024. free .
  16. News: Total Tally of Shuttle Fleet Costs Exceed Initial Estimates . . Leonard . David . February 11, 2005 . August 6, 2006.
  17. News: NASA 2006 Budget Presented: Hubble, Nuclear Initiative Suffer . Berger . Brian . February 7, 2006 . . August 6, 2006.
  18. Web site: NASA Budget Information. January 27, 2015.
  19. Shuttle programme lifetime cost . April 7, 2011 . Pielke . Roger Jr. . Radford Byerly . 2011Natur.472...38P . . 472 . 7341 . 10.1038/472038d . 38 . 21475182. free .
  20. Web site: Review: The Space Shuttle Program: Technologies and Accomplishments . Foust . Jeff . November 20, 2017 . The Space Review.
  21. Web site: Roland Statement . NASA . June 18, 2018.
  22. Book: Weinrich . Heinz . Management: A Global, Innovative, and Entrepreneurial Perspective . 2013 . 126.
  23. Book: Klikauer . Thomas . Management Education: Fragments of an Emancipatory Theory . 2016 . 220.
  24. Book: Keuper . Franz . Finance Bundling and Finance Transformation: Shared Services Next Level . 2013 . i.
  25. Web site: NASA wants shuttle to fly despite safety misgivings. February 8, 2023. The Washington Times. Chien . Philip. June 26, 2006 . https://web.archive.org/web/20230326030503/https://www.washingtontimes.com/news/2006/jun/26/20060626-110227-5543r/ . March 26, 2023 . live .
  26. Web site: Dumping NASA's New Ares I Rocket Would Cost Billions. Space.com. August 12, 2009 . Halvorson . Todd . https://web.archive.org/web/20221209000024/https://www.space.com/7126-dumping-nasa-ares-rocket-cost-billions.html . December 9, 2022 . live .
  27. Web site: Space Shuttle Atlantis Exhibit Opens with Support from Souvenirs. June 29, 2013 .
  28. Web site: Space Shuttle Endeavour homepage . November 27, 2022. California Science Center.
  29. News: California Science Center breaks ground on space shuttle Endeavour's new vertical home. June 1, 2022. Los Angeles Daily News. November 27, 2022.
  30. Web site: Human Space Flight (HSF) – Space Shuttle. https://web.archive.org/web/20000831011229/http://spaceflight.nasa.gov/shuttle/reference/basics/orbiter/index.html. dead. August 31, 2000.
  31. Web site: Space Future – The Future of Space Tourism. Peter Wainwright. (www.spacefuture.com).
  32. Web site: Space Future – The Space Tourist. Peter Wainwright. (www.spacefuture.com).
  33. Web site: Commercial Orbital Transportation Services. https://web.archive.org/web/20140606215941/http://www.nasa.gov/sites/default/files/files/SP-2014-617.pdf . June 6, 2014 . live. February 2014. November 20, 2022. NASA.
  34. Web site: NASA . 2011 . How much does it cost to launch a Space Shuttle? . dead . https://web.archive.org/web/20221205113150/https://www.nasa.gov/centers/kennedy/about/information/shuttle_faq.html#10 . December 5, 2022 . June 28, 2011 . NASA.
  35. Web site: Rockwell 74 Passenger Module. November 20, 2022.
  36. Web site: Politics played a big role in why NASA doesn't already have a new spacecraft to replace the retiring space shuttles. Funding and technical challenges put a stop to any attempts to build the ' Space Shuttle 2.'. Space.com. April 12, 2011.
  37. Web site: Shuttle II. https://web.archive.org/web/20161228021051/http://astronautix.com/s/shuttleii.html. dead. December 28, 2016.
  38. Web site: Reusable Launch Vehicle. https://web.archive.org/web/20130224062451/http://spinoff.nasa.gov/spinoff1996/14.html. dead. February 24, 2013.
  39. Web site: NASA's Space Launch Initiative: The Next Generation Launch Technology Program. May 2003. November 20, 2022. NASA.
  40. Web site: X-38 project's cancellation irks NASA, partners. June 9, 2002.
  41. Web site: HL-20 – Lifting Body Spaceplane for Personnel Launch System. x0av6. August 4, 2016.
  42. Web site: NASA ACRV. https://web.archive.org/web/20161224031240/http://www.astronautix.com/n/nasaacrv.html. dead. December 24, 2016.
  43. NASA . August 18, 2006 . NASA Selects Crew and Cargo Transportation to Orbit Partners . November 21, 2006.
  44. Web site: ISS partners prepare to welcome SpaceX and Orbital in a busy 2012. Bergin. Chris. October 6, 2011. NASASpaceFlight.com (Not affiliated with NASA). December 13, 2011.
  45. Web site: Biggest CCDev Award Goes to Sierra Nevada. https://archive.today/20120909235028/http://www.spacenews.com/venture_space/100201-biggest-ccdev-award-goes-sierra-nevada.html. dead. September 9, 2012. Berger. Brian. February 1, 2011. Imaginova Corp.. December 13, 2011.
  46. Web site: NASA Commercial Crew Program Mission in Sight for 2018. January 4, 2018. NASA. April 14, 2018.
  47. Web site: NASA Announces Design for New Deep Space Exploration System. September 14, 2011. NASA. April 28, 2012.
  48. Web site: Acronyms to Ascent – SLS managers create development milestone roadmap. Bergin. Chris. February 23, 2012. NASA. April 29, 2012.
  49. News: SLS launches Artemis 1 mission. Jeff . Foust. November 16, 2022. November 27, 2022. Space News.
  50. Web site: Artemis I – Flight Day 10: Orion Enters Distant Retrograde Orbit . Sandra . Jones. November 25, 2022. NASA. November 27, 2022.
  51. Web site: Report No. IG-20-018: NASA's Management of the Orion Multi-Purpose Crew Vehicle Program . https://ghostarchive.org/archive/20221009/https://www.oversight.gov/sites/default/files/oig-reports/IG-20-018.pdf . October 9, 2022 . live . . . July 16, 2020 . December 28, 2020.
  52. Web site: First Flight With Crew Important Step on Long-Term Return to Moon. Hambleton. Kathryn. August 27, 2018. NASA. November 27, 2022.
  53. Web site: NASA's First Flight With Crew Important Step on Long-term Return to the Moon, Missions to Mars. Hambleton. Kathryn. May 23, 2019. NASA. July 10, 2019.
  54. News: NASA Has a Full Plate of Lunar Missions Before Astronauts Can Return to Moon. Hanneke . Weitering . May 23, 2019. Space.com. November 27, 2022. And before NASA sends astronauts to the moon in 2024, the agency will first have to launch five aspects of the lunar Gateway, all of which will be commercial vehicles that launch separately and join each other in lunar orbit. First, a power and propulsion element will launch in 2022. Then, the crew module will launch (without a crew) in 2023. In 2024, during the months leading up to the crewed landing, NASA will launch the last critical components: a transfer vehicle that will ferry landers from the Gateway to a lower lunar orbit, a descent module that will bring the astronauts to the lunar surface, and an ascent module that will bring them back up to the transfer vehicle, which will then return them to the Gateway..
  55. Web site: NASA administrator on new Moon plan: 'We're doing this in a way that's never been done before'. Grush. Loren. May 17, 2019. The Verge. November 27, 2022. Now, for Artemis 3 that carries our crew to the Gateway, we need to have the crew have access to a lander. So, that means that at Gateway we're going to have the Power and Propulsion Element, which will be launched commercially, the Utilization Module, which will be launched commercially, and then we'll have a lander there..
  56. Web site: NASA administrator on new Moon plan: 'We're doing this in a way that's never been done before'. Grush. Loren. May 17, 2019. The Verge. November 27, 2022. The direction that we have right now is that the next man and the first woman will be Americans, and that we will land on the south pole of the Moon in 2024..
  57. Web site: Chang. Kenneth. For Artemis Mission to Moon, NASA Seeks to Add Billions to Budget. The New York Times. May 25, 2019. https://web.archive.org/web/20190525034839/https://www.nytimes.com/2019/05/13/science/trump-nasa-moon-mars.html . May 25, 2019 . May 25, 2019. Under the NASA plan, a mission to land on the moon would take place during the third launch of the Space Launch System. Astronauts, including the first woman to walk on the moon, Mr. Bridenstine said, would first stop at the orbiting lunar outpost. They would then take a lander to the surface near its south pole, where frozen water exists within the craters.. live. limited.
  58. News: NASA outlines plans for lunar lander development through commercial partnerships. July 21, 2019.
  59. Web site: NASA Transition Management Plan. https://ghostarchive.org/archive/20221009/http://www.nasa.gov/pdf/202388main_Transition_Mgmt_Plan-Final.pdf . October 9, 2022 . live. Olson. John. Joel Kearns . August 2008. JICB-001. National Aeronautics and Space Administration.
  60. Book: Jenkins, Dennis R. . Space Shuttle: Developing an Icon − 1972–2013. 978-1-58007-249-6 . Specialty Press . 2016.
  61. News: NASA Railroad rides into sunset. Florida Today. May 23, 2015. November 27, 2022. James. Dean.