The River class is a type of bulk carrier designed for service on the Great Lakes. The MV Mark W. Barker, the first of the class is due to enter service for the Interlake Steamship Company on 27 July 2022.
In April 2019, it was announced that Interlake had ordered a single River-class ship from Fincantieri Bay Shipbuilding of Sturgeon Bay, Wisconsin.[1] The vessel was the first new ship ordered by Interlake since 1981, and the first Great Lakes bulker built on the Great Lakes since 1983.[1] Construction began in August 2019, when the first steel was cut.[2] The ship was built in modular sections, the first of which were joined together at a ceremonial keel laying in June 2020. At the event, Interlake announced that she would be named MV Mark W. Barker, the ship was commissioned on 1 September 2022 [3]
The River class was designed by Interlake, Fincantieri Bay, and Bay Engineering, and measures 639feet long, with a beam of 78feet and a draft of 45feet.[4] It has a deadweight tonnage of 28,000 DWT, with a unique cargo hold and hatch design that allows for the transport of both bulk raw materials and large individual cargo.[5] As a self-unloading ship, a bow-mounted conveyor system that is 76m (249feet) long is installed for offloading of bulk materials. Ship propulsion power is about 5800kW from two diesel engines - EMD 710s on Mark W. Baker - and electrical power totals 3440kW from a genset and a shaft-mounted generator on each main engine.[5] A single propeller gives the ship a service speed of about 15mph.[4]