Higher-speed rail (HrSR),[1] also known as high-performance rail,[2] higher-performance rail,[3] semi-high-speed rail or almost-high-speed rail,[4] is the jargon used to describe inter-city passenger rail services that have top speeds of more than conventional rail but are not high enough to be called high-speed rail services. The term is also used by planners to identify the incremental rail improvements to increase train speeds and reduce travel time as alternatives to larger efforts to create or expand the high-speed rail networks.[5]

Though the definition of higher-speed rail varies from country to country, most countries refer to rail services operating at speeds up to .

The concept is usually viewed as stemming from efforts to upgrade a legacy railway line to high speed railway standards (speeds in excess of), but usually falling short on the intended speeds. The faster speeds are achieved through various means including new rolling stock such as tilting trains, upgrades to tracks including shallower curves, electrification, in-cab signalling, and less frequent halts/stops.[6]

Definitions by country

As with the definitions of high-speed rail, the definition varies by country. The term has been used by government agencies,[7] government officials,[8] transportation planners,[9] academia,[10] the rail industry,[11] and the media,[12] but sometimes with overlaps in the speed definitions. Some countries with an established definition of higher-speed rail include:

Agency / CouncilTop speeds (mph)Ref
California Department of TransportationUp to 125[22]
Minnesota Department of TransportationGreater than 90 but less than 125[23]
North Central Texas Council of Governments80–150
Oklahoma Department of Transportation110–125[24]
Texas Department of Transportation110–125
Virginia Department of Rail and Public TransportationUp to 110

Speed limits

In Canada, the assumption about grade crossing is that operating higher-speed rail services between 160km/h200km/h would require "improved levels of protection in acceptable areas".[25]

In the United States, railroad tracks are largely used for freight with at-grade crossings. Passenger trains in many corridors run on shared tracks with freight trains. Most trains are limited to top speeds of 79mph unless they are equipped with an automatic cab signal, automatic train stop, automatic train control or positive train control system approved by the Federal Railroad Administration (FRA).[26] In developing higher-speed rail services, one of those safety systems must be used.

Additionally, the FRA establishes classification of track quality which regulates the speed limits of trains with Class 5, Class 6, Class 7 and Class 8 for top speeds of,[27], and, respectively.[28] The FRA also regulates passenger train design and safety standards to ensure trains that operate at speeds of up to comply with its Tier I standard and trains that operate at speeds up to comply with its Tier II standard.[29]

Another limitation is the safety of grade crossings (also known as level crossings, flat level crossings, non-grade-separated crossings) which limits how fast trains can go. FRA regulations set speed limits for tracks with grade crossings as follows:[30] Level crossings are generally the most dangerous part of the railway network with a large number of fatal incidents occurring at a grade crossing.

In Europe, the limit is often over grade crossings.[31] In Sweden there is a special rule permitting if there are barriers and automatic detection of road vehicles standing on the track.[32] In Russia is permitted over grade crossings.[33] The United Kingdom has railway lines of 200 km/h (125 mph) which still use grade crossings.

With the above limitations, many regional transportation planners focus on rail improvements to have the top speeds up to when proposing a new higher-speed rail service.[21]

Similar categories

In countries where there had been rail improvement projects in the later part of the 20th century and into the 2000s, there are inter-city rail services with comparable speed ranges of higher-speed rail, but they are not specifically called "higher-speed rail". Below are some examples of such services that are still in operation.

Commuter rail services

Some commuter rail services that cover shorter distances may achieve similar speeds but they are not typically called as higher-speed rail.[19] Some examples are:

Rail improvement strategies

There are many types of trains that can support higher-speed rail operation. Usually, the rail infrastructure needs to be upgraded prior to such operation. However, the requirements to the infrastructure (signalling systems, curve radii, etc.) greatly increase with higher speeds, so an upgrade to a higher-speed standard is often simpler and less expensive than building new high-speed lines. But an upgrade to existing track currently in use, with busy traffic in some segments, introduces challenges associated with the construction work that could potentially disrupt the train services. The followings are some strategies used by regional transportation planners and rail track owners for their rail improvement projects in order to start the higher-speed rail services.

Signal upgrades

In Victoria, Australia, the increased top speeds from in the Regional Fast Rail project required a change to the signalling system to account for increased braking distance. Prior to the project, the system comprised a mixture of equipment from pre-WWI mechanical signalling to the remote control systems of the 1980s. In some cases, operators needed to telephone the local operators to manually control the signal boxes. With the new speeds, the signalling needed to be computerized. The project employed the Solid State Interlocking with the newly laid fiber-optic communication between the components to use three computer systems to control the signals. When the output of one computer differs from the other two, the system will fail that computer and continue the signal operations as long as the outputs from the other two computers are consistent. The project deployed the Train Protection & Warning System which allows the system to automatically applies the brakes at a sufficient distance to stop the train if the driver does not control the speeds adequately. The project also incorporated Train Control and Monitoring System to allow real-time monitoring of the position of trains.[48]

In the United States, the first step to increase top speeds from 79mph is to install a new signal system that incorporates FRA-approved positive train control (PTC) system that is compatible with higher-speed rail operation.[49] They are both transponder-based and GPS-based PTC systems currently in use in the United States. By a mandate, a significant portion of the railroads in the United States will be covered by PTC by the end of 2015.[50]

Track improvements

To support trains that run regularly at higher speeds, the rails need to be reliable. Most freight tracks have wooden ties which cause rails to become slightly misaligned over time due to wood rot, splitting and spike-pull (where the spike is gradually loosened from the tie).[51] The concrete ties used to replace them are intended to make the track more stable, particularly with changes in temperature.[52] Rail joints are also an issue, since most conventional rail lines use bolts and fishplates to join two sections of the rail together. This causes the joint to become slightly misaligned over time due to loosening bolts. To make for a smoother ride at higher speeds, the lengths of rail may be welded together to form continuous welded rail (CWR). However, the continuous welded rails are vulnerable to stress due to changes in temperature.[53]

In Australia, the track condition before the Regional Fast Rail project could only support trains up to speeds of . The tracks are with mixture of wooden and concrete ties. The rail weight varies but with majority being 47kg/m. The track upgrade in the project included changing to use concrete ties and to use new standard of rail weight at 60kg/m in order to support the new top speeds of .[54]

There may be restriction in maximum operating speeds due to track geometry of existing line, especially on curves. Straightening the route, where possible, will reduce the travel time by increasing the allowable speeds and by reducing the length of track. When straight routes are not possible, reducing the number of curves and lowering the degree of curvature would result in higher achievable speeds on those curves. An example is the elimination of three consecutive reverse curves in favor of one larger curve. Raising superelevation may be considered for sharp curves which significantly limit speed. The higher speeds on those modified curves, together with the higher superelevation, will require track modification to have transition spirals to and from those curves to be longer.[55]

Old turnouts may need replacement to allow trains to run through the turnouts at higher speeds. In the United States, some old turnouts have speed limit of . Even with newer turnouts (rated #20), the diverging speed limit is still at which would significantly slow down the higher-speed train passing through those sections. High-speed turnouts (rated #32.7) are capable of handling maximum diverging speeds of .[56] [57] [58]

In order to minimize the downtime to upgrade tracks, a track renewal train (TRT) can automate much of the process, replacing rails, ties, and ballast at the rate of 2 miles per day. In the United States, a TRT is used by Union Pacific Railroad on the track shared with future higher-speed rail service in Illinois area.[59] [60]

For electrified track, the old catenary may need to be replaced. The fixed-tension catenary which is acceptable for low speeds may not be suitable for regular higher-speed rail services, where a constant tension is automatically maintained when temperature changes cause the length of the wire to expand or contract.[61]

Crossing improvements

With trains running at higher speeds throughout the route, safety at all at-grade crossings needs to be considered.

In Australia, the levels of upgrade of the crossing in the rail improvements project were based on the risk analysis. The improvements included flashing light protection, automatic full barriers protection, and pedestrian gates crossings. The project also introduced the use of rubber panels at the crossings.[48]

In the United States, the FRA limits train speeds to without an "impenetrable barrier" at each crossing. Even with that top speed, the grade crossings must have adequate means to prevent collisions. Another option is grade separation, but it could be cost-prohibitive and the planners may opt for at-grade crossing improvements instead.[30]

The safety improvements at crossings can be done using combination of techniques. This includes passive devices such as upgraded signage and pavement markings. Another low-cost passive device is median separators which are installed along the center line of roadways, extending approximately 70 to 100 feet from the crossing, to discourage drivers from running around the crossing gates. More active devices include the four-quadrant gate, which blocks both sides of each traffic lane. Longer gate arms can cover 3/4 of the roadway. Video cameras can also be installed to catch the violators. A signal monitoring system can also be installed to alert the crews when the crossing equipment has malfunctioned.[62]

In Norway, grade crossing speed are not permitted to exceed .[63]

Rerouting and passing sidings

In areas where there is frequent interference between freight and passenger trains due to congestion which causes the passenger trains to slow down, more extensive improvements may be needed. Certain segments of the line in congested areas may need to be rerouted. New track may need to be laid to avoid many curves which slow down the trains. In stretches of heavy freight train traffic, adding passing sidings along the segment should be considered. Sometimes certain stations may need to be bypassed.[64]

Electrification

Another consideration is electrification. Electrifying a railway line entails a major upgrade to the rail infrastructure and equipment. On the infrastructure side, it requires catenary lines to be built above the tracks. New transmission lines are needed to carry power from the power plants. Substations are required for each of the 40miles lengths to reduce severe voltage losses. There is also a need to consider the required amount of power supply and new power plants may be required. For locomotives, new electric locomotives are needed or existing diesel-electric locomotives can be retrofitted into all-electric locomotives, but it is a complicated task.[65] These factors cause electrification to have high initial investment costs. The advantages of all-electric locomotives are that they provide quieter, cleaner and more reliable operations than the diesel-electric counterpart. The fuel consumption, locomotive maintenance costs and track wear of all all-electric locomotives are also lower.[66] Furthermore, electric traction makes the operator more independent of oil price fluctuations and imports, as electricity can be generated from domestic resources or renewable energy. This was a major consideration in the electrification of the German Democratic Republic network, as lignite (and therefore electricity) was cheap and plentiful domestically whereas oil had to be imported at world market prices.

An alternative to catenary lines is to use a third rail system which has a semi-continuous rigid conductor placed alongside or between the rails of a railway track. However the operating speeds of this type of systems cannot be greater than due to its limitation of the power supply gaps at turnouts and grade crossings. Therefore, the third rail system is not generally used for higher-speed rail.[67]

One example in the United States that does involve electrification is the Keystone Improvement Project to provide higher-speed rail service along the Harrisburg-Pittsburgh segment of the Keystone Corridor in Pennsylvania. The plan includes additional track, a new signal system and electrification. If completed as planned, this would allow Amtrak to utilize electric power continuously on service from Philadelphia to Pittsburgh. The first segment ("Main Line") has already been using electric locomotives with a top speed of .[68]

In operation

Australia

See also: High-speed rail in Australia. In 1999, the concept of Regional Fast Rail project was initiated by the Government of Victoria with a goal to provide express higher-speed rail services between four main regional centres of Victoria (Geelong, Ballarat, Bendigo and the Latrobe Valley) and Melbourne. The initiative included a key component to upgrade rail infrastructure to have top speeds up to . The development phase of initiative was between 2000 and 2002. Finally, the services on four lines began between 2005 and 2006 with top speeds of 160 km/h using VLocity trains.[69] Additionally, Queensland Rail's Tilt Train, the Prospector and NSW TrainLink's XPT all have a top service speed of 160 km/h (99–100 mph).[70] [71] [72]

The New South Wales XPT (short for Express Passenger Train) is the main long-distance passenger train operated by NSW TrainLink on regional railway services in New South Wales, Australia from Sydney to Dubbo, Grafton, and Casino as well as interstate destinations, Brisbane and Melbourne. The XPT is based on the British Rail designed High Speed Train and entered service in April 1982. It came to fruition in January 1978 when the Public Transport Commission invited tenders for 25 high-speed railcars similar to the Prospector railcars delivered by Comeng to the Western Australian Government Railways in 1971. Comeng's proposal for a train based on the InterCity 125 was announced as the successful bidder in October 1976.

The Tilt Train is the name for two similar tilting train services, one electric and the other diesel, operated by Queensland Rail on the North Coast line from Brisbane to Rockhampton and Cairns. In May 1999 the Electric Tilt Train set an Australian train speed record of north of Bundaberg, a record that still stands.[73] [74]

The Transwa WDA/WDB/WDC class are a class of railcars built by United Goninan, Broadmeadow for Transwa in 2004–05 to replace the WAGR WCA/WCE class railcars on the AvonLink and Prospector services in Australia. They are capable of high-speed operation.

China

In China, higher-speed railways are railways that are not officially categorized as high-speed rail but allow CRH EMUs run on it with speeds up to 200 km/h.[75] Typically these lines are classified as Grade I conventional railways and are used by both passenger and freight services.

Note that the majority of high-speed lines are also called "passenger-only"(Chinese: 客运专线) lines. Inside mainland China this word invokes a sense of higher-speed rail but the wording usage is inconsistent.

Train identifiers

Identifiers starting with G indicates at least part of the train's route operates at a maximum 300 km/h or above (this is a characteristic of the line rather than the precise maximum speed of this exact train) and not running at deliberately reduced speed on any section. Other sections of the route may have lower speeds as low as 160 km/h.

Identifiers starting with C indicates short-distance travel using CRH trains, the maximum speed is irrelevant (ranging from 160 km/h Ürümqi-Korla service to 350 km/h Beijing-Tianjin (via intercity) service).

Identifiers starting with D indicates CRH services with maximum speed 265 km/h or less, including overnight sleepers on 310 km/h Beijing-Guangzhou line (running them 310 km/h overnight not only causes noises but also disturbs sleeping patterns of passengers. This is an example of deliberately reduced speeds).

Identifiers starting with S indicates metropolitan services using CRH rolling stock and have a different fare system to the national one. Their maximum speed is 160 km/h.

Note: The start and end station in the following lists accounts only CRH services.* denotes some section of this line doesn't have 160 km/h CRH services.

Conventional lines running CRH services

Line nameLine name
(Chinese)
start stationend stationTrain identifiersNote
Southern Xinjiang南疆线(吐库二线段)/C T K Y none
Lanzhou-Xinjiang (West)

(including Second track)

兰新线西段(北疆线)C T K YBole station where Boltala Prefecture branch splits is no longer a passenger stop.[76]
Jinghe-Khorgos精伊霍铁路C T K Y
Boltala Prefecture Branch博州支线C T K Y
Liuyuan-Golmud柳格线柳敦段D K Y noneNo CRH train from/to Dunhuang stops at Yumen.
Changchun-Baicheng
Baicheng-Arxan
长白·白阿线(长乌段)C Z K
Hohhot-Ordos呼鄂线D Z K
Beijing Suburban:
Huairou-Miyun
北京市郊怀密线S
Beijing Suburban:
Sub-Center
北京市郊副中心线S
Tianjin-Jizhou津蓟铁路S
Beijing-Qinhuangdao京秦线(京哈线)D Z T K YBoth conventional and high-speed services has some detouring to Tianjin instead.
Xiong'an Area雄安地区动车D Z T K YSection between and is high-speed Tianjin–Baoding intercity railway(mixed traffic).
G class trains running solely on aforementioned section is not counted.
Section between Shijiazhuang and Xushui East is Beijing–Guangzhou railway.
Section between Bazhou West and Beijing South is Beijing–Kowloon railway.
Northern Tongpu Quadruple Track北同蒲三四线D Z KPart of Datong-Xi'an high-speed line.
Beijing-Shanghai Overnight Sleepers京沪动卧D2/1/3 pair(s) of trains between Beijing and Shanghai/Nanjing/Hangzhou daily.
Trains to Hangzhou have section between Kunshan and Hangzhou runs via Shanghai–Kunming railway and does not stop at Shanghai.
Longkou-Yantai龙烟线D
Nanjing-Qidong宁启线南启段DSection between Nanjing and Nantong is 200 km/h
CR Shanghai Suburban (Shaoxing)上海局市域(绍兴)SLocally administered
CR Shanghai Suburban (Ningbo)上海局市域(宁波)SLocally administered
Dazhou-Chengdu达成线成遂段D Z T KSection between Suining and Chengdu is 200 km/h
Xiangyang-Chongqing襄渝线达渝段D T K
Nanchong-Gaoxing南高线DGaoxing station connects to Dazhou-Chongqing but is not a passenger stop
Shimen County-Changsha石长线D T K
Kunming-Hekou昆玉河铁路(标准轨)YuxiC KCRH service between Yuxi and Kunming South run on Kunming–Yuxi intercity railway (200 km/h)
Shanghai-Kunming沪昆线宣昆段C Z T K none
Litang-Zhanjiang黎湛线贵玉段D T K none
Shejiang-Shantou畲汕线潮汕至汕头G D K

Newly built lines operating less than 200 km/h speed

Line nameLine name
(Chinese)
start stationend stationTrain identifiersNote
Shanghai Area: Jinshan金山线S[77]
Zhongchuan Airport intercity中川机场城际C DLanzhou Area only except a single round trip to/from Tianshui South.
Beijing Subway Daxing Airport Express北京地铁大兴机场线Not existNot part of China Railway System.
Baotou-Xi'an包西线西延段D Z T KDifferent from Baotou–Xi'an high-speed railway (under construction).
Nanjing-Chengdu宁蓉线宜凉段
(宜万铁路)
G D Z KPassenger service branches at .
Lanzhou-Chongqing兰渝铁路G D Z K
Changsha-Zhuzhou/Xiangtan长株潭城际铁路/C
Guiyang-Kaiyang贵开城际铁路C
Guiyang Loop Line贵阳市域铁路环线Loop LineC
Guangzhou-Shenzhen (quadtuple track)广深线(城际线)C DThrough operation to (Guiyang-Guangzhou high-speed line), it operates at 180 km/h.

Designated 200 km/h, operating 160 km/h lines with currently no C/D/G class services

Line nameLine name
(Chinese)
start stationend stationTrain identifiersNote
Jining-Baotou quadtuple track集包第二双线Z T K noneThe section between Hohhot East and Baotou is high-speed rail.
The section between Jining South and Hohhot differs from Zhangjiakou–Hohhot high-speed railway (all of this line's D class service is transfterred to it).
Taiyuan-Zhongwei/Yinchuan Corridor太中银通道/Z T K none

Slow speeds on lines normally running high-speed

This section lists the deliberately reduced scenarios mentioned in "train identifiers" section above.

Line nameLine name
(Chinese)
start stationend stationTrain identifiersNote
Southeast coastal sleepers沪广动卧//DSection between Shanghai and Hangzhou uses Shanghai-Kunming high-speed line. Section between Shenzhen North and Zhuhai uses Guangzhou-Shenzhen-Hong Kong high-speed line and Guangzhou-Zhuhai intercity line.
Beijing-Guangzhou sleepers京广动卧 and others (see note)DOvernight service to,, and using Beijing-Guangzhou-Shenzhen, Guangzhou-Zhuhai, Xinhui-Maoming-Zhanjiang and Shanghai-Kunming high-speed lines.

Greece

Since 1997, ongoing construction to upgrade and built higher-speed lines capable of speeds of up to 200km/h is conducted. The P.A.Th.E. Plan (Patras-Athens-Thessaloniki-Evzonoi), as it is called aims at reduced journey times between Greece's main cities (Athens, Thessaloniki and Patra) as well as an improved rail connection between Greece and North Macedonia. Currently, only the modernized lines of DomokosThessaloniki, Athens AirportKiato, and ThessalonikiStrymonas are in operation at maximum speeds of 160km/h.[78]

India

The Gatimaan Express was India's first semi-high speed train.[79] In October 2014, the railways applied for safety certificate from Commission of Railway Safety to start the service. In June 2015, the train was officially announced. The train was launched on 5 April 2016 and completed its maiden journey between Nizamuddin and Agra Cantt within 100 minutes. But due to low occupancy, Indian Railways first extended this train from Agra to Gwalior on 19 February 2018 and then to Jhansi on 1 April 2018.

The Tejas Express was Introduced by Indian Railways in 2017. It features modern onboard facilities with doors which are operated automatically. Tejas means "sharp", "lustre" and "brilliance" in many Indian languages. The inaugural run of Tejas Express was on 24 May 2017 from Mumbai Chhatrapati Shivaji Maharaj Terminus to Karmali, Goa. It covered 552 km in 8 hours and 30 minutes.[80] On 1 March 2019, second Tejas Express of the country was flagged off between Chennai Egmore and Madurai Junction by Prime Minister Narendra Modi. It covered 497 km in 6 hours and 30 minutes.[81] Lucknow – New Delhi Tejas Express, which was inaugurated on 4 October 2019, is India's first train operated by private operators, IRCTC, a subsidiary of Indian Railways.[82] The Ahmedabad – Mumbai Tejas express, also operated by IRCTC was inaugurated on the 17 January 2020.[83] From 1 September 2021, the train LHB Rajdhani Rakes are replaced with LHB Tejas Sleeper Rakes. This increased the speed of the train to 130 km/h. The train can travel at a top speed of 160 km/h making it a Semi-High Speed Train.

In 2021, Indian Railways started to upgrade Rajdhani Coaches to Tejas coaches. This replaced its traditional LHB Rajdhani coaches On 15 February 2021, the Agartala Rajdhani Express was upgraded with Tejas livery Sleeper Coaches. On 19 July 2021, the Mumbai Rajdhani Express was upgraded to Tejas class smart coaches. LHB Rajdhani coaches.[84] [85] On 1 September 2021 the Rajendra Nagar Patna Rajdhani Express was upgraded to Tejas rakes. This increased the speed of the train to 130 km/h. The train can travel at a top speed of 160 km/h.[86]

In 2019, Vande Bharat Express, also known as Train 18,[87] was inaugurated. This is an Indian higher-speed rail intercity electric multiple unit. It was designed and built by Integral Coach Factory (ICF) at Perambur, Chennai under the Indian government's Make in India initiative over a span of 18 months. The unit cost of the first rake was given as, though the unit cost is expected to go down with subsequent production.[88] At the original price, it is estimated to be 40% cheaper than a similar train imported from Europe.[89] The train was launched on 15 February 2019, from Delhi to Varanasi.[90] The service was named 'Vande Bharat Express' on 27 January 2019.[91] On 5 October 2019, a second Vande Bharat Express was opened from Delhi to Katra[92] On 30 September 2022, Prime Minister Narendra Modi inaugurated a 3rd Vande Bharat Express rake connecting Mumbai and Ahmedabad passing through Surat. This rake was an upgraded second generation version.[93] an other second generation rake was inaugurated from Delhi to Una passing through Chandigarh.[94]

The Delhi Meerut Regional Rapid Transit System (RRTS), also known as RapidX, is a semi high-speed rail project inaugurated in 2023. Trains, called Namo Bharat trains, can reach speeds of up to 180 kilometers per hour.

Inaugural run and entry into service

The train flagged off for an inaugural run by Prime Minister of India Narendra Modi, on 15 February 2019,[95] with its commercial run started from 17 February 2019 onwards.It will be running on the Delhi-Varanasi route,[96] via Kanpur and Prayagraj, connecting the holy city of Varanasi to the Capital city, reducing travel time along the route by 15 percent. The train's regenerative brakes are also expected to allow a 30% savings in electricity costs as compared to its predecessor.[97] At an operating speed of, it will outpace the Shatabdi Express by . Although the trainset has been tested for speeds up to 180 km/h, it is capable of running at speed of 200 km/h. Every other car on the train is motorised.[98] The 8-hour journey from New Delhi to Varanasi station has the Chair Car CC Class fare of ₹1,755.00 and covers the total distance of about 762 kilometers.[99]

Laos

See main article: article and Boten–Vientiane railway. Passenger trains on the 2021 opened Boten–Vientiane railway travel at speeds of up to 160 km/h,[100] [101] however the railway has been described as 'high-speed' as well.[102] Some sections of the railway were planned to allow speeds of up to 200 km/h, however this was downgraded to 160 km/h in the final design.[103] [104]

United States

This is the list of the current higher-speed rail services from the East Coast to the West Coast:

! Corridor / Segment !! Service name !! Length (miles) !! Equipment !! Power !! Current Top speed (mph) !! Avg speed (mph)[105] !! Note
Northeast Regional 457 [106] Trains run on Northeast Corridor trackage shared by high-speed Acela Express trains. This service also qualifies as high-speed rail in certain portions of its route when traveling at its maximum speed, .
235 locomotive-hauled coaches Diesel-electric service started September 22, 2023.
PhiladelphiaHarrisburg, PA, PAKeystone Service104 locomotive-hauled coaches Electric
Empire Service, Lake Shore Limited, Maple Leaf, Adirondack, Ethan Allen Express 141 locomotive-hauled coaches
Hartford Line, Vermonter, Northeast Regional 62 locomotive-hauled coaches Diesel-electric Amtrak services running on the New Haven–Springfield Line started operating at on 16 June 2018.[107]
Chicago, ILDetroit/Pontiac, MI Wolverine 304 locomotive-hauled coaches Diesel-electric As of 2014, a 97miles portion allows speeds up to . Another portion of is under construction to increase to those speeds.[108]
Blue Water 319 locomotive-hauled coaches Diesel-electric As of 2014, a 97miles portion allows speeds up to .[109]
Lincoln Service 284 locomotive-hauled coaches Diesel-electric [110]
Texas Eagle 2,728 locomotive-hauled coaches Diesel-electric
Southwest Chief 2,256 locomotive-hauled coaches Diesel-electric [111]
Pacific Surfliner130 locomotive-hauled coaches Diesel-electric There is a study in place to increase maximum speed to when funding is available.[112]

Earlier attempts

Canada

There have been several different attempts at higher speed rail in the Quebec City–Windsor Corridor, and several high speed rail attempts as well.[13]

Ireland

In 2010, there was a report commissioned by the Chartered Institute of Logistics and Transport as a mid-term review of Transport 21, an Irish infrastructure plan announced in 2005. The report recommended, among other things, a development of national rail to provide higher-speed rail services.[113] However, there have been no progress toward the recommendation.

United States

There have been long-range visions to establish high/higher-speed rail networks in different regions of the United States but without adequate funding. During the American Recovery and Reinvestment Act of 2009, there was a surge of interest to apply for grants from the federal government to start those projects. However, many proposals have been put on hold or cancelled after failing to secure funding or support from the public or key local politicians.[114] [115]

Amtrak Cascades

See main article: Amtrak Cascades. Amtrak Cascades, a 467miles intercity rail service, stretches from Eugene, Oregon, through the State of Washington to Vancouver, British Columbia, in Canada. As of 2010, the long-term goal of this corridor was to have the top speeds of the segment of Eugene, Oregon, to Blaine, Washington, with top speeds in the range, and eventually on a dedicated track.[116] However, as of 2012, the Washington State Department of Transportation plans for its 300miles stretch to have top speeds of only 79mph,[117] and the plan in Oregon is to limit the speeds to as well, with safety and other freight service concerns voiced by the track owner, Union Pacific Railroad.[118] This essentially halts the plan to provide a higher-speed rail service on this corridor in the near future.

Minnesota

The Northern Lights Express project, in the planning stages and proposed to begin construction in 2017, would upgrade the BNSF trackage between Minneapolis and Duluth to support service up to .[119]

Other higher-speed rail proposals are periodically considered, but would need to pass through neighboring states, which have thus far not agreed to cooperate. Minnesota transportation planners proposed a higher-speed rail service called the River Route, with top speeds of, between Minneapolis–Saint Paul, Minnesota, and Chicago, Illinois, via Milwaukee, Wisconsin, which follows the Empire Builder route.[120] There is no current progress with the River Route project due to the cancellation of the funding in Wisconsin.

Another alternative that has been discussed is to have a new route that heads south to Iowa to join the rail link from Iowa to Chicago.[121] There was a report in 2011 that Iowa would halt its involvement in high/higher-speed rail projects.[122] However, the Iowa Department of Transportation and Illinois Department of Transportation continue to pursue the study of rail link between Chicago and Omaha, Nebraska, through Iowa with top speeds of .[123] [124] Therefore, the status of the proposal to link Minneapolis–Saint Paul with Chicago via Iowa is unknown.

New York

In 1998, New York State initiated a $185 million program in partnership with Amtrak to increase the speeds of the Empire Service to by reconstructing all seven gas-turbine Turboliner trainsets, originally built in 1976–1977, to the new RTL-III specification. The reconstructed trains, coupled with track improvements, would cut the travel time between New York City and Albany by 20 minutes. However, the project ran into many problems including issues with the trains and the unsuccessful implementation of required track improvements.[125] New York ended the rehabilitation program in 2005 after spending $70.3 million.[126] Fallout over the program led to litigation between New York and Amtrak; Amtrak would eventually pay New York $20 million and commit to funding $10 million in track improvements.[127] New York auctioned off its surplus Turboliners in 2012 for $420,000.[128]

Ohio

See main article: Ohio Hub. The Ohio Hub, a rail improvement project proposed by the Ohio Department of Transportation, is aimed at revitalizing passenger rail service in the Ohio region. The proposal was to increase the top speeds to in the network connecting Cleveland, Columbus, and Cincinnati, commonly referred as the 3-C corridor.[129] The project is currently in an unknown state after the U.S. government rescinded the federal funding from Ohio and redirected it to other states.[114]

Wisconsin

In October 2009, the Wisconsin Department of Transportation adopted the Connections 2030 plan which is the long-range plan for state transportation needs. The plan includes Wisconsin Rail Plan 2030, the twenty-year plan to improve the state railroad system by 2030. In the rail plan, there is a multi-phase project to upgrade the rail service from Chicago, Illinois, to Milwaukee and Madison, Wisconsin, with top speeds of . The latter phases of the project will expand the same service to Minneapolis–Saint Paul in Minnesota and another route to Green Bay, Wisconsin.[130] There was a reaction against the project in 2010, and the $810 million grant the state originally received for the project from the federal government was rescinded.[114] As of 2012, the rail plan is postponed indefinitely.[131]

Current efforts

Baltic states

The three Baltic states have been working with the European Union as part of the Trans-European Transport Networks (TEN-T) initiative on a study to build a higher-speed rail line in the Rail Baltica corridor to connect Warsaw, in Poland, and Tallinn, in Estonia.[132]

Bangladesh

Bangladesh Government has taken initiatives to develop high-speed rail (HSR) in between its two major cities – Dhaka, the National Capital City and Chattogram (former Chittagong), the second largest and the principal Port City of the country. Bangladesh Railway (BR), the Government-owned and-managed transportation agency of the country, signed a contract of BDT 102 crore on 31 May 2018 with a Consortium of China Railway Design Corporation (CRDC), a Chinese Company and Mazumder Enterprise (ME), a Bangladeshi Pvt. Ltd. Company for feasibility study and detailed design for construction of proposed Dhaka-Chattogram via Cumilla/Laksam HSR line.

With 320.79 km length, Dhaka-Chattogram is the main business corridor and life line of BR, and at present, the railway route is a circuitous way through Tongi-Bhairab Bazar-Brahmanbaria-Cumilla-Chattogram. The proposed shorter route, which would be Dhaka-Cumilla/Laksham-Chattogram, will cut short the length by about 91 km, making the total length around 230 km. The expected speed of the proposed HSR would be above 300 km/h (yet to determine) and it would take less than one hour to reach Chattogram from Dhaka, which currently takes more than five hours. Under the 18-month contract, the Consortium's responsibilities will include identifying alternative alignments, assessing the viability of the project, preparing detailed engineering design, and cost estimation.[133]

Canada

For a rail route to connect Windsor, Ontario to Detroit, Michigan in the United States, a higher-speed rail plan was proposed as an alternative after a study on the Windsor to Quebec City route in Canada was to consider only high-speed rail with top speeds of or more. Politicians in Windsor area proposed in 2012 that having higher-speed rail connection between Windsor and Detroit must be part of the consideration.[25] [134] [135]

Another feasibility study is ongoing as part of the Northern New England Intercity Rail Initiative to connect between Boston and Montreal trains at top speeds of .

Greece

A project to modernize railway network in Greece is ongoing. A new 106km (66miles) alignment between Tithorea and Domokos is designed to avoid the mountainous part. The new line will have speeds of .[78]

India

In October 2013, the Minister of Railways announced at the two-day international technical conference on High Speed Rail Travel; Low Cost Solution that the focus of India's rail improvement is to implement a lower cost solution to meet the immediate needs by providing higher-speed rail services as an incremental step before the dedicated track high-speed rail can be achieved. India's higher-speed rail will be in the range of .[14] On 3 July 2014, a trail run with the new top speeds of was successfully completed on a journey of between Delhi and Agra. The new service, operational since 5 April 2016, cut the travel time from 126 minutes (compared to standard trains) with a top speed of 160km/h to 99 minutes.[136]

In 2019, the government approved 3 rapid regional railways including Delhi–Meerut Regional Rapid Transit System with speeds up to 160 km/h.[137]

In June 2020, the government of Kerala approved the Thiruvananthapuram–Kasargode Semi High Speed Rail Corridor or Silver line, a Semi-High speed rail line connecting the state.[138]

In July 2021, the Government announced plans of making 10 new Vande Bharat Express Lines connecting Over 40 cities. This is planned to be done by 2022.[139]

Malaysia

The KTM ETS is an inter-city rail service operated by Keretapi Tanah Melayu Berhad utilizing electric multiple units. The KTM ETS is the second electric train service to be operated by the Malaysian railway company, after the KTM Komuter service.

Commencing in August 2010, the ETS is the fastest metre gauge train service in Malaysia and operates along the electrified and double-tracked stretch of the West Coast Line between and on the Malaysia-Thai border by the Malaysian national railway operator, Keretapi Tanah Melayu.

The rail service is operated by KTM Intercity Division. It was previously operated by ETS Sendirian Berhad, a fully owned subsidiary of Keretapi Tanah Melayu Berhad. The operation speed for this train is 140 km/h with the maximum possible speeds for the trains at 160 km/h.

New Zealand

Advocacy group Greater Auckland proposed the Regional Rapid Rail initiative in 2017, including tilt trains with a maximum speed of 160 km/h.[140] This network would link Auckland with Hamilton, Tauranga and Rotorua. In December 2018, the Government of New Zealand committed funding to reintroducing a five-year trial rail service between Papakura in southern Auckland to Hamilton, starting in 2020.[141]

Panama

China claimed to invest capitals into 160 km/h rail corridor, total length would be 491 km.[142]

Philippines

The state-owned Philippine National Railways plans to rebuild its historic South Main Line from Manila to the Bicol Region in the southeastern tip of Luzon. The agency will build 639km (397miles) of track, with the main line itself leading to Matnog, Sorsogon and a spur line leading to Batangas City. It will be a standard-gauge railway served by Chinese-built diesel multiple units with a maximum speed of and an average speed of including stops.[143] The project will start construction in mid-2020 and is set to open partially by 2022.

In January 2022, PNR general manager Junn Magno defined the agency's future high-speed rail projects to be electrified railways with a maximum speed of at least 200km/h. The high power costs and resulting expensive ticket prices resulted in the operation of high-speed rail in the country to be marked as infeasible. The agency then resorted to semi-high speed express trains for its new standard-gauge lines.[144]

United States

This is a partial list of ongoing higher-speed rail projects from the East Coast to the West Coast.

! Corridor / Segment !! Length !! Top speed !! Avg speed !! Current status !! Note
Boston, MA – Springfield, MA – Montreal, QC, Canada Feasibility study A study of higher-speed rail options with top speeds of in 3 sections along the route.[145] [146] [147]
New York City – Niagara Falls, NY Fully electrified track, and straightened Hudson River route. See
Washington, DC – Richmond, VA [148] [149] [150]
Richmond – Newport News, VA Tier 1 EIS
Richmond – Norfolk, VA Tier 1 EIS
Richmond, VA – Raleigh, NC Tier 2 EIS Top speeds from Richmond, VA, to south of Petersburg, VA, will be and changed to after that.[151]
Raleigh – Charlotte, NC Construction
Charlotte, NC – Atlanta, GA Tier 1 EIS A option is considered along with high-speed rail.
Atlanta, GA – Macon, GA – Jacksonville, FL Tier 1 EIS See
Atlanta, GA – Chattanooga / Nashville, TN – Louisville, KY Tier 1 EIS completed See
Atlanta, GA – Birmingham, AL Tier 1 EIS See
Atlanta, GA – Columbus, GA Feasibility Study Higher-speed rail was one of the 3 alternatives in the feasibility study completed in 2014. Funding is not yet available to begin Tier 1 EIS phase.[152]
Columbus, OH – Fort Wayne, Indiana – Chicago, ILFeasibility Study Initial operating speeds up to .[153] Study funded by local governments and organizations, not by state governments.[154]
Ann Arbor, MI – Traverse City, MIFeasibility Study Three alternatives with 2 higher-speed rail alternatives at top speeds of and [155]
Kalamazoo, MI – Albion, MI Operation starts May 25, 2021 [156]
Chicago, IL – Milwaukee, WI Environmental Assessment The top speeds of is one of the alternatives under consideration.[157]
Chicago, IL – Omaha, NE (via Iowa) Tier 1 EIS
MinneapolisDuluth, MN Environmental Assessment completed Known as Northern Lights Express, received Finding Of No Significant Impact on Tier 2 Environmental Assessment in February 2018, and cleared to seek federal funding for design and construction.[158]
St. Louis, MO – Kansas City, MO [159] Construction New sidings between Jefferson City and Lee's Summit for service[160]
Oklahoma City, OK – San Antonio, TX Feasibility Study See
Dallas/Fort Worth – Houston, TX Feasibility Study See
PhoenixTucson, AZ Tier 1 EIS completedThree alternatives finalized by Arizona Department of Transportation.[161] The Yellow Corridor Alternative was selected as the preferred alternative at the completion of Tier 1 EIS.[162]
Notes

Proposed routes

In addition to ongoing projects, there are proposed routes that have not reached the feasibility study stage yet. In Pennsylvania, a rail advocacy group started fund raising efforts in 2014 to obtain $25,000 for a preliminary study and additional $100,000 for feasibility study of the route from Erie to Pittsburgh. The proposal is for express train services to directly link the two cities. An alternative is to have intermediate stops in Ohio cities including Ashtabula, Warren, and Youngstown before heading back to New Castle, Pennsylvania.[163]

In Ohio, a rail advocacy group works with local political leaders in Ohio, Indiana and Illinois to consider a higher-speed rail line from Cincinnati to Chicago. This is in response to another advocacy group in Indiana that gained funding for the Columbus, Ohio – Fort Wayne – Chicago route that is already in feasibility study stage. The group persuaded the Hamilton County government in Ohio to advocate for the study.[164] The county commissioners unanimously voted in September 2014 to pursue a feasibility study. As a possible route that goes through the states of Kentucky and Indiana, the county expects that Ohio-Kentucky-Indiana Regional Council of Governments will help fund a feasibility study.[165]

In Michigan, a feasibility study sponsored by an environmental group is in progress for a new rail line between Detroit and Grand Rapids. The proposal is to have trains running at speeds between 79mph110mph. The state transportation department is interested in the study but is not ready to move beyond this study.[166]

In Texas, the East Texas Corridor Council proposed a higher-speed rail route between Longview and Dallas. The trains will operate at speeds of 80mph and .[167]

Vietnam

In 2018, Vietnam planned to build a higher-speed rail line in the northern part of the country to link between Haiphong, Hanoi, and Lào Cai which is then connected to China. The 391km (243miles) line will run parallel to the existing regular speed railway. The top speeds for the new services will be up to .[168]

See also

Notes and References

  1. News: Bowen . Douglas John . 27 August 2012 . U.S. HSR accelerates . Railway Age . live . 10 October 2012 . https://web.archive.org/web/20121001113636/http://www.railwayage.com/index.php/passenger/high-performance/us-hsr-accelerates.html#.UHT7PxVuSSo . 1 October 2012.
  2. "H.R.4361 – National High Performance Passenger Rail Transportation-Oriented Development Act of 2012" 112th Congress of the United States. Retrieved 10 September 2013.
  3. News: Clayton. Mark. Obama plan for high-speed rail, after hitting a bump, chugs forward again. 10 October 2012. Christian Science Monitor. 21 August 2012. 9 October 2012. https://web.archive.org/web/20121009064741/http://www.csmonitor.com/USA/2012/0821/Obama-plan-for-high-speed-rail-after-hitting-a-bump-chugs-forward-again. live.
  4. http://railway-news.com/railway-industry-news/high-speed-rail-in-fly-over-country-americas-aspirations-for-high-speed-rail
  5. Safety of High Speed Ground Transportation Systems. December 1994. Federal Railroad Administration. 3 July 2014. 3 March 2016. https://web.archive.org/web/20160303234324/http://ntl.bts.gov/lib/42000/42600/42666/ord9505.pdf. live.
  6. News: India-China to collaborate on building semi-high speed rail. 4 July 2014. The Economic Times. 29 March 2014. 27 July 2014. https://web.archive.org/web/20140727072024/http://articles.economictimes.indiatimes.com/2014-03-29/news/48684245_1_fuel-adjustment-component-rail-tariff-authority-arunendra-kumar. live.
  7. Web site: Hahn. Johannes. From Passengers to Captains of Europe's Baltic Sea Strategy. 4th Annual Forum on the EU Strategy for the Baltic Sea Region. European Commission. 13 November 2013. 11 November 2013. 13 November 2013. https://web.archive.org/web/20131113050924/http://europa.eu/rapid/press-release_SPEECH-13-904_en.pdf. live.
  8. Web site: 40th Parliament, 2nd Session Standing Committee on Transport, Infrastructure and Communities. Canada Parliament. 31 August 2013. 9 June 2009. 21 September 2013. https://web.archive.org/web/20130921060208/http://www.parl.gc.ca/HousePublications/Publication.aspx?DocId=3973433. live.
  9. Web site: Section 5 Rail Transportation . Congestion Management Process (CMP) . North Central Texas Council of Governments . 31 August 2013 . V-14 . dead . https://web.archive.org/web/20120513202543/http://www.nctcog.org/trans/cmp/SECTION5-RailTransportation.pdf . 13 May 2012 .
  10. Web site: Thoren . Thomas . Team Studies Track Components for Shared-Use Rail Lines . University of Illinois . 31 August 2013 . 9 December 2012 . dead . https://web.archive.org/web/20130921055754/http://cee.illinois.edu/pueblo_rail_project . 21 September 2013 .
  11. Thompson. Louis S.. High-Speed Rail (HSR) in the United States – Why Isn't There More?. Japan Railway & Transport Review. October 1994. 37. 31 August 2013. 21 September 2013. https://web.archive.org/web/20130921061323/http://www.jrtr.net/jrtr03/pdf/f32_tho.pdf. live.
  12. News: Galuszka. Peter. The other reason Virginia didn't seek rail money (WP Opinions). 31 August 2013. Washington Post. 13 June 2011. 21 September 2013. https://web.archive.org/web/20130921203626/http://www.washingtonpost.com/blogs/all-opinions-are-local/post/the-other-reason-virginia-didnt-seek-rail-money/2011/03/10/AGfYCBTH_blog.html. live.
  13. Web site: Ms. Helena Borges (Director General, Surface Transportation Policy, Department of Transport) at the Transport, Infrastructure and Communities Committee. Canada Parliament. 31 August 2013. 12 May 2009. 21 September 2013. https://web.archive.org/web/20130921055357/http://openparliament.ca/committees/transport/40-2/18/helena-borges-1/only/. live.
  14. News: Railway Minister Launches High Speed Rail Corporation of India Limited (HSRC). 13 November 2013. Disha Diary. 29 October 2013. https://web.archive.org/web/20131113050712/http://www.orissadiary.com/CurrentNews.asp?id=45261. 13 November 2013. dead.
  15. Web site: Written evidence from Paul Atkins (HSR 07). UK House of Commons – Transport Committee. 11 January 2015. 11 January 2015. https://web.archive.org/web/20150111080043/http://www.publications.parliament.uk/pa/cm201012/cmselect/cmtran/1185/1185vw09.htm. live.
  16. News: Lind. William. Run a Train That's Fast Enough. 10 October 2012. Engineering News-Record. 11 May 2011. 22 January 2013. https://web.archive.org/web/20130122112618/http://enr.construction.com/opinions/viewpoint/2011/0511-RunTranThatsFastEnough.asp. live.
  17. Web site: Higher Speed Rail in North Carolina and Virginia: Lengthening and Strengthening the Northeast Corridor (NEC) . Regional Transportation Alliance . 10 October 2012 . dead . https://web.archive.org/web/20120514183014/http://www.letsgetmoving.org/images/uploads/pages/RTA-bkfst-final.pdf . 14 May 2012 .
  18. Web site: FAQ . The Cascadia High Speed Rail . 10 October 2012 . dead . https://web.archive.org/web/20130824210123/http://cascadiahighspeedrail.org/faq/default.html . 24 August 2013 .
  19. Web site: Tier I Draft Environmental Impact Statement: Open House and Public Hearing. Virginia Department of Rail and Public Transportation. 10 October 2012. 24 October 2013. https://web.archive.org/web/20131024214450/http://www.rich2hrrail.info/downloads/RHRPublicHearing%20Exhibits-ProjectInformation.pdf. live.
  20. Web site: High-Speed Rail Strategic Plan. PDF. Federal Railroad Administration. April 2009. 10. 16 April 2009. 7 January 2013. https://web.archive.org/web/20130107143104/http://www.fra.dot.gov/eLib/Details/L02833. live.
  21. Web site: The Development of High Speed Rail in the United States: Issues and Recent Events. Congressional Research Service. 10 October 2012. 8 May 2013. https://web.archive.org/web/20130508174004/https://www.fas.org/sgp/crs/misc/R42584.pdf. live.
  22. Web site: Next-Generation Rail Supply Chain Connectivity Forum, Sacramento, California. National Institute of Standards and Technology and Manufacturing Extension Partnership. 22 January 2014. 6. 8 February 2012. 25 September 2012. https://web.archive.org/web/20120925185541/http://www.nist.gov/mep/upload/SciCommSummary-DOT_Forum_CA_Final-2-2.doc. live.
  23. Web site: State Aviation System Plan. Minnesota Department of Transportation. 22 January 2014. 200. July 2013. 3 February 2014. https://web.archive.org/web/20140203183148/http://www.dot.state.mn.us/aero/planning/documents/sasp/saspchapter8.pdf. live.
  24. Types of passenger rail. Texas-Oklahoma Passenger Rail Study Newsletter. Winter 2014. 2. 1. 2. 22 January 2014. 3 February 2014. https://web.archive.org/web/20140203005814/http://ftp.dot.state.tx.us/pub/txdot-info/rail/txok/alternatives-newsletter.pdf. live.
  25. Web site: Deliverable No. 12 – Review of Impacts of HSR on the Transportation System within the Corridor . Updated Feasibility Study of a High Speed Rail Service in the Québec City – Windsor Corridor . Ministère des Transports du Québec, Ontario Ministry of Transportation, and Transport Canada . 17 November 2012 . November 2010 . dead . https://web.archive.org/web/20121030014908/http://www.mto.gov.on.ca/english/pubs/high-speed-rail/impacts/QOHSR%20Del%2012%20Nov9E%20Final.pdf . 30 October 2012 .
  26. Web site: Code of Federal Regulations – Title 49 – Transportation. 20 October 2012. 11 November 2014. https://web.archive.org/web/20141111065846/http://www.gpo.gov/fdsys/pkg/CFR-2011-title49-vol4/xml/CFR-2011-title49-vol4-sec236-0.xml. live.
  27. Web site: Chapter 5 Track Safety Standards Classes 1 through 5. Track Safety Standards Compliance Manual. Federal Railroad Administration. 4 November 2012. https://web.archive.org/web/20080528020612/http://www.fra.dot.gov/downloads/safety/tss_compliance_manual_chapter_5_final_040107.pdf. 28 May 2008.
  28. Web site: Chapter 6 Track Safety Standards Classes 6 through 9, p. 6.13. Track Compliance Manual. Federal Railroad Administration. 4 November 2012. https://web.archive.org/web/20030923081943/http://www.fra.dot.gov/downloads/safety/track_compliance_manual/TCM%206.PDF. 23 September 2003.
  29. Book: High Speed Passenger Rail Safety Strategy. 2009. Federal Railroad Administration. 23. 7 November 2012. https://web.archive.org/web/20110911035857/http://www.fra.dot.gov/downloads/safety/HSRSafetyStrategy110609.pdf. 11 September 2011.
  30. Web site: High-Speed Grade Crossings . Federal Railroad Administration . 20 October 2012 . dead . https://web.archive.org/web/20120904102341/http://www.fra.dot.gov/Pages/217.shtml . 4 September 2012 .
  31. News: Ten Years of Work Needed Before New Trains Can Reach Top Speed. 17 November 2014. Estonian Public Broadcasting. 21 May 2013. 29 November 2014. https://web.archive.org/web/20141129021910/http://news.err.ee/v/economy/1dbd0967-3ae8-4c04-af7d-a14290bea4c4. live.
  32. Book: Kartläggning av plankorsningar – B05-690/TR00 (Swedish). 30 June 2006. Banverket. 17 November 2014. 21 May 2013. https://web.archive.org/web/20130521100659/http://www.trafikverket.se/PageFiles/10137/Kartlaggning_av_plankorsningar_2006.pdf.
  33. News: High-Speed Russian Train Stirs Anger. 17 November 2014. Bloomberg BusinessWeek. 12 July 2010. 24 September 2015. https://web.archive.org/web/20150924124457/http://www.businessweek.com/globalbiz/content/jul2010/gb20100712_212007.htm#p1. dead.
  34. Web site: Hoover. Ryan. Mini-Shinkansen: How East Japan Railway Co. extended high-speed rail without huge infrastructure expenditures. BayRail Alliance. 28 September 2014. 20 July 2006. 11 November 2014. https://web.archive.org/web/20141111070231/http://oldsite.bayrailalliance.org/rail_technology/Mini_Shinkansen_jul06.pdf. live.
  35. Web site: High Speed Lines in the World . https://www.webcitation.org/6U8lfU2Gh?url=http://www.uic.org/IMG/pdf/20140901_high_speed_lines_in_the_world.pdf . dead . 17 November 2014 . International Union of Railways . 27 September 2014 . 1 September 2014 .
  36. Book: Semmens, Peter . High Speed in Japan: Shinkansen – The World's Busiest High-speed Railway . Platform 5 Publishing . 1997 . 1-872524-88-5 . Sheffield, UK.
  37. Web site: AVE-Long Distance Products. Renfe. 13 November 2013. 19 October 2017. https://web.archive.org/web/20171019125238/http://www.renfe.com/EN/viajeros/larga_distancia/productos/index.html. live.
  38. News: Holtung . Siri . 18 May 2011 . . Norwegian Bokmål . Høyhastighet eller høy hastighet? Vestfoldbanen 2026 . High-speed or high speed? The Vestfold track 2026 . https://web.archive.org/web/20160506022410/http://byavisa.sandefjord.no/nor/Naering/Aktuelt/Hoeyhastighet-eller-hoey-hastighet-Vestfoldbanen-i-2026 . 6 May 2016 . dead.
  39. http://www.jernbaneverket.no/Jernbanen/Banene/Gardermobanen/
    in Norwegian
  40. http://www.nmj.no/1000366.html
    in Norwegian
  41. e.g. http://www.sb.no/nyheter/nyheter/for-hoy-togtut/s/2-2.428-1.7540611 ; in Norwegian
  42. Web site: Getting around Sweden by Train. VisitSweden. 13 November 2013. 13 November 2013. https://web.archive.org/web/20131113213824/http://www.visitsweden.com/sweden/travel-guide/getting-around-in-sweden/by-train/. live.
  43. Web site: Our trains . . 1 November 2017 . 7 November 2017 . https://web.archive.org/web/20171107025602/https://www.sj.se/en/about/about-sj/our-trains.html . live .
  44. Web site: Rail Safety Tips. North County Transit District. 3 November 2016. https://web.archive.org/web/20151223191933/http://www.gonctd.com/rail-safety-tips. 23 December 2015. dead.
  45. News: Starcic. Janna. Maryland's MARC Railroad Upgrades Fleet, Service to Bolster Ridership. 26 October 2016. Metro Magazine. 17 June 2016. 26 October 2016. https://web.archive.org/web/20161026231331/http://www.metro-magazine.com/rail/article/713751/maryland-s-marc-railroad-upgrades-fleet-service-to-bolster-ridership. live.
  46. Book: 2016 RTP/SCS Passenger Rail Appendix. December 2015. Southern California Association of Governments. 4 November 2016. 18 January 2017. https://web.archive.org/web/20170118041409/http://scagrtpscs.net/Documents/2016/draft/d2016RTPSCS_PassengerRail.pdf. live.
  47. Book: Caltrain Modernization Program. 14 January 2014. Transbay Joint Powers Authority Citizen Advisory Group. 16 December 2016. 20 December 2016. https://web.archive.org/web/20161220211157/http://transbaycenter.org/uploads/2014/01/TJPA-CAC-1.14.14.pdf. live.
  48. Web site: Marchant . Kevin . The Regional Fast Rail Project – A Technical Focus . Australian Construction Achievement Award . 19 January 2014 . dead . https://web.archive.org/web/20130420163127/http://acaa.net.au/pdf/2007_tp_pp/regionaltp.pdf . 20 April 2013 .
  49. Web site: Pacific Surfliner Corridor Los Angeles to San Diego – Service Development Plan. California Department of Transportation. 21 October 2012. 1 February 2014. https://web.archive.org/web/20140201215458/http://149.136.20.80/rail/dor/assets/File/CA-Pac-Surf_Final_SDP.pdf. live.
  50. Web site: Positive Train Control Overview. Federal Railroad Administration. 21 October 2012. 7 June 2012. https://web.archive.org/web/20120904132328/http://www.fra.dot.gov/rrs/pages/fp_1265.shtml. 4 September 2012.
  51. Book: Sonoma-Marin Area Rail Transit Project SCH #2002112033 Concrete Rail Ties CEQA Addendum to 2006 FEIR. January 2011. Sonoma-Marin Area Rail Transit District. 6. 17 November 2014. 4 March 2016. https://web.archive.org/web/20160304072321/http://www2.sonomamarintrain.org/userfiles/file/Addendum%20to%20FEIR%20(FINAL%20Concrete%20ties%20Addendum%201-12-11).pdf. live.
  52. News: At a Glance: Railway Sleeper Materials. 17 November 2014. Railway-technology.com. 6 August 2010. 29 November 2014. https://web.archive.org/web/20141129041157/http://www.railway-technology.com/features/feature92105/. live.
  53. News: Continuous welded rails strengthen network. 17 November 2014. Creamer's Media Engineering News. 27 June 2014. 17 November 2014. https://archive.today/20141117051606/http://www.engineeringnews.co.za/article/continuous-welded-rails-strengthens-network-but-consider-rail-stress-2014-06-27. live.
  54. Web site: Deveney. Thomas J.. Regional Fast Rail – Project Overview. IRSE Technical Convention. 19 January 2014. 19 March 2004. 29 November 2014. https://web.archive.org/web/20141129053904/http://irse.org.au/publications/technical-papers-australasia/994-2004-march-1-deveney-regional-fast-rail-project-overview. live.
  55. Book: Technical Monograph: Transportation Planning for the Richmond–Charlotte Railroad Corridor (FRA/RDV-04/02). 2004. Federal Railroad Administration. Volume II. https://web.archive.org/web/20120906173125/http://www.fra.dot.gov/downloads/RRDev/rich_vol_2.pdf. 6 September 2012.
  56. News: AMTRAK REQUESTS LESS FEDERAL OPERATING SUPPORT. 21 October 2012. Amtrak Press Release. 3 February 2012. 30 July 2013. https://web.archive.org/web/20130730200336/http://www.amtrak.com/ccurl/93/560/ATK-12-008%20Amtrak%20FY%202013%20Grant%20Leg%20Request.pdf. live.
  57. Web site: Automatic Train Control and Advanced Civil Speed Enforcement System; Northeast Corridor Railroads. Federal Railroad Administration. 21 October 2012. https://web.archive.org/web/20100527212505/http://www.fra.dot.gov/downloads/counsel/acses5.pdf. 27 May 2010.
  58. Web site: Track improvements: Raleigh – Greensboro. NCDOT. 21 October 2012. https://web.archive.org/web/20130927130841/http://www.bytrain.org/track/rghgro.html. 27 September 2013.
  59. Web site: TRT 909. IDOT High Speed Rail. 21 October 2012. 13 November 2012. https://web.archive.org/web/20121113083624/http://www.idothsr.org/. live.
  60. Web site: TRT-909 Track Renewal System. Harsco Rail. 21 October 2012. https://web.archive.org/web/20130118215259/http://www.harscorail.com/services/track-renewal-TRT-909.aspx. 18 January 2013.
  61. Web site: Catenary Improvements Continue on Metro-North's New Haven Line. MTA. 22 October 2012. 27 September 2012. https://web.archive.org/web/20120927152014/http://www.mta.info/news/stories/?story=154. live.
  62. Web site: Sealed Corridor Program. NCDOT. 22 October 2012. 1 September 2012. https://web.archive.org/web/20120901212038/http://www.bytrain.org/safety/sealed.html. live.
  63. http://www.jernbaneverket.no/Sikkerhet/Planovergangar/Der-vei-krysser-jernbane/
    in Norwegian
  64. Web site: WSDOT Summary of Track 1 Projects. 22 October 2012. 17 October 2012. https://web.archive.org/web/20121017161657/http://www.wsdot.wa.gov/NR/rdonlyres/3936E083-54E0-4486-8183-07A9BE03FE56/0/WSDOTSummaryTrack1Projects_Summary.pdf. live.
  65. Freeman. Richard. Cooper. Hal. Why Electrified Rail Is Superior. 21st Century. Summer 2005. 28.
  66. News: Current Developments in UK Rail: An Electrifying Future. 28 September 2014. Railway-technology.com. 9 December 2010. 19 October 2014. https://web.archive.org/web/20141019115049/http://www.railway-technology.com/features/feature104304. live.
  67. News: Yadav. Anil. Traction choices: overhead ac vs third rail dc. 17 November 2014. International Railway Journal. 4 February 2013. 6 September 2014. https://web.archive.org/web/20140906202540/http://www.railjournal.com/index.php/rolling-stock/traction-choices-overhead-ac-vs-third-rail-dc.html. live.
  68. News: Cotey. Angela. Keystone Corridor. 20 October 2012. Progressive Railroading. 12 July 2012. https://web.archive.org/web/20120712080707/http://www.hsrupdates.com/corridor_profiles/details/Keystone-Corridor--84. live.
  69. Web site: Results of special audits and other investigations, August 2006 . Auditor General Victoria . 13 November 2013 . dead . https://web.archive.org/web/20060918152911/http://www.audit.vic.gov.au/reports_mp_psa/psa1602.html . 18 September 2006 .
  70. News: Travelling on the Tilt Train linking Brisbane and Rockhampton in Queensland. Explore Australia by rail with an Australian rail pass. 10 July 2017. en-GB. 19 August 2017. https://web.archive.org/web/20170819144137/http://www.australiarailpass.com/tilt-train/. live.
  71. News: Kalgoorlie celebrates launch of new Prospector. Public Transport Authority (Western Australia). 10 July 2017. en-AU. 19 August 2017. https://web.archive.org/web/20170819145631/http://www.pta.wa.gov.au/news/media-statements/kalgoorlie-celebrates-launch-of-new-prospector. live.
  72. Web site: ???. The Australian. 10 July 2017. 6 November 2021. https://web.archive.org/web/20211106101804/https://insight.adsrvr.org/track/up?adv=vrges6n&ref=https%3A%2F%2Fwww.theaustralian.com.au%2Fsubscribe%2Fnews%2F1%2F%3FsourceCode%3DTAWEB_WRE170_a%26dest%3Dhttps%253A%252F%252Fwww.theaustralian.com.au%252Fnational-affairs%252Fpolicy%252Fvery-fast-train-xpt-showcases-all-the-best-the-80s-has-to-offer%252Fnews-story%252F1d1038d577ccaa00e3db1fecfe4825b1%26memtype%3Danonymous%26mode%3Dpremium&upid=rjdl4pv&upv=1.1.0. live.
  73. Book: Annual Report June 1999. Queensland Rail. 1999. Brisbane. 53. Queensland Rail. 20 August 2016. https://web.archive.org/web/20090930024735/http://www.corporate.qr.com.au/Images/QR_Annual_Report_tcm15-2468.pdf. 30 September 2009. dead.
  74. QR Tilt Train Sets Australian Rail Speed Record Railway Digest June 1999 page 15
  75. Web site: 铁路安全管理条例. gov.cn. 15 May 2018. 14 October 2014. https://web.archive.org/web/20141014043645/http://www.gov.cn/zwgk/2013-09/06/content_2482594.htm. live.
  76. Web site: 中国国家铁路集团有限公司 . 29 November 2019 . 1 August 2020 . https://web.archive.org/web/20200801162329/http://www.china-railway.com.cn/xwzx/zhxw/201909/t20190924_96313.html . live .
  77. Web site: 20日起金山铁路动车组车次全面更新 列车时刻保持不变. 2021-01-19.
  78. Web site: Railway Infrastructure. OSE SA. 10 August 2015. 16 July 2015. https://web.archive.org/web/20150716234421/http://www.ose.gr/en/25-about-ose/89-%CF%83%CE%B9%CE%B4%CE%B7%CF%81%CE%BF%CE%B4%CF%81%CE%BF%CE%BC%CE%B9%CE%BA%CE%AE-%CF%85%CF%80%CE%BF%CE%B4%CE%BF%CE%BC%CE%AE-2. live.
  79. News: PTI. 2014-10-12. Delhi-Agra semi-high speed train to be named Gatimaan Express. en-IN. The Hindu. 2021-07-18. 0971-751X. 9 November 2020. https://web.archive.org/web/20201109083623/https://www.thehindu.com/news/cities/Delhi/delhiagra-semihigh-speed-train-to-be-named-gatimaan-express/article6493500.ece. live.
  80. Web site: Nair. Binoo. 2016-09-30. Mumbai-Goa route gets Railways' premium train Tejas. 2021-07-18. DNA India. en. 18 July 2021. https://web.archive.org/web/20210718235004/https://www.dnaindia.com/india/report-mumbai-goa-route-gets-railways-premium-train-tejas-2260090. live.
  81. Web site: 2019-03-01. Madurai-Chennai Tejas Express flagged off! After Vande Bharat, it's the swankiest Indian Railways train. 2021-07-18. The Financial Express. en-US. 18 July 2021. https://web.archive.org/web/20210718235005/https://www.financialexpress.com/infrastructure/railways/new-trains-2019-tejas-express-chennai-egmore-madurai-train-no-22672-22671-schedule/1502482/. live.
  82. Web site: Ray. Anulekha. 2019-10-04. India's first private train Lucknow-Delhi Tejas Express flagged off today. 2021-07-18. mint. en. 18 July 2021. https://web.archive.org/web/20210718235003/https://www.livemint.com/news/india/india-s-first-private-train-lucknow-delhi-tejas-express-starts-today-key-things-11570164891093.html. live.
  83. Web site: Desk. RailPost News. Ahmedabad-Mumbai Tejas Express To Be Flagged Off Today – RailPost.in. 17 January 2020 . 2021-07-18. en-US. 18 July 2021. https://web.archive.org/web/20210718235006/https://www.railpost.in/ahmedabad-mumbai-tejas-express-to-be-flagged-off-today/. live.
  84. News: Tyagi . Harshita . Western Railway runs Mumbai–New Delhi Rajdhani Express with new Tejas-like smart sleeper coaches . live . https://web.archive.org/web/20210719154222/https://www.timesnownews.com/business-economy/industry/article/western-railway-runs-mumbai-new-delhi-rajdhani-express-with-new-tejas-like-smart-sleeper-coaches/787342 . 19 July 2021 . 19 July 2021 . Times Now.
  85. News: The Incredibles . live . https://web.archive.org/web/20210719154223/https://mumbaimirror.indiatimes.com/mumbai/other/the-incredibles/articleshow/84307471.cms . 19 July 2021 . 19 July 2021 . Mumbai Mirror.
  86. Web site: Livemint . 2021-09-01 . Railways starts Patna-New Delhi Rajdhani Express with Tejas rake from today . live . https://web.archive.org/web/20210903060758/https://www.livemint.com/news/india/indian-railways-starts-patna-new-delhi-rajdhani-express-with-tejas-rake-from-today-11630500931343.html . 3 September 2021 . 2021-09-03 . mint . en.
  87. Web site: India's fastest to be called Vande Bharat Express. Indian Express. 28 January 2019. 28 January 2019. https://web.archive.org/web/20190128060002/https://www.ndtv.com/india-news/train-18-indias-fastest-named-vande-bharat-express-piyush-goyal-1983965. live.
  88. News: Prabhakar . Siddarth . First Made-in-India engineless train gets on track for trial run – Times of India . 4 November 2018 . . 23 October 2018 . 5 November 2018 . https://web.archive.org/web/20181105101450/https://timesofindia.indiatimes.com/city/chennai/first-made-in-india-train-set-ready-for-trial-run/articleshow/66324376.cms . live .
  89. News: Arora . Rajat . Made-in-India 160 km per hour train to run from June . 5 November 2018 . . 16 March 2018 . New Delhi, India . 27 June 2018 . https://web.archive.org/web/20180627202039/https://economictimes.indiatimes.com/industry/transportation/railways/made-in-india-160-km-per-hour-train-to-run-from-june/articleshow/63323107.cms . live .
  90. News: Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi . 7 February 2019 . Business Today . PTI . 15 February 2019 . 7 February 2019 . https://web.archive.org/web/20190207131914/https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html . live .
  91. Web site: Minister of Railways & Coal Shri Piyush Goyal Announces 'Vande Bharat Express'. Press Information Bureau, India. 27 January 2019. 27 January 2019. https://web.archive.org/web/20190127212747/http://www.pib.nic.in/PressReleseDetail.aspx?PRID=1561592. live.
  92. News: Vande Bharat trains: Soon, 44 more semi-high speed trains on Indian Railways network; check details . 23 August 2020 . The Financial Express . 8 July 2020 . 19 August 2020 . https://web.archive.org/web/20200819135854/https://www.financialexpress.com/infrastructure/railways/vande-bharat-trains-soon-44-more-semi-high-speed-trains-on-indian-railways-network-check-details/2017412/#:~:text=ministry%20had%20stated.-,At%20present%2C%20Indian%20Railways%20operates%20two%20world%2Dclass%20Vande%20Bharat,between%20New%20Delhi%20and%20Katra. . live .
  93. Web site: Livemint . 2022-09-30 . New Vande Bharat Express flagged off by PM. Know routes, timings, other details . 2022-10-01 . mint . en.
  94. Web site: PM Modi to flag off Vande Bharat Express in Himachal Pradesh's Una today . 12 October 2022 . 13 October 2022 . Indian Express.
  95. Web site: 7 February 2019 . Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi . live . https://web.archive.org/web/20190207131914/https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html . 7 February 2019 . 17 February 2019 . Business Today.
  96. News: 29 October 2018 . Pics: Train 18 To Begin Trial Run Today. Here Are 10 Things To Know . live . https://web.archive.org/web/20181105062047/https://www.ndtv.com/business/train-18-indias-fastest-train-route-launch-date-today-features-engineless-rotating-seats-in-pictures-1939151 . 5 November 2018 . 4 November 2018 . . NDTV.
  97. News: 14 November 2018 . T 18: Train with a brain is Railways 'engineering marvel' . live . https://web.archive.org/web/20210504213000/http://www.uniindia.com/news/india/t-18-train-with-a-brain-is-railways-engineering-marvel/1404772.html . 4 May 2021 . 9 December 2020 . United News of India.
  98. News: 29 October 2018 . Self-propelled Train 18 debuts for trial run . live . https://web.archive.org/web/20181105012318/http://www.uniindia.com/news/india/self-propelled-train-18-debuts-for-trial-run/1391824.html . 5 November 2018 . 4 November 2018 . United News of India.
  99. Web site: INDIAN RAILWAY CATERING & TOURISM CORPORATION LTD. . dead . https://web.archive.org/web/20200618044258/https://www.irctc.co.in/nget/train-list . 18 June 2020 . 9 December 2020.
  100. Web site: China-Laos Railway starts operation. 2021-12-06. www.news.cn.
  101. Web site: 2021-11-28. Laos hopes for economic boost from Chinese-built railway. 2021-12-06. France 24. en.
  102. News: 2021-12-03. China and Laos open $6 billion high-speed rail link. en. Reuters. 2021-12-06.
  103. Web site: 2020-08-04. China-Laos railway – a guide to the Boten-Vientiane railway in Laos. 2021-12-06. Future Southeast Asia. en-US.
  104. News: High speed rail coming to Laos. Bangkok Post. 2021-12-06.
  105. Web site: Amtrak System Timetable: Updated June 2018. 1 June 2018. 27 September 2018. 22 September 2018. https://web.archive.org/web/20180922164720/https://www.amtrak.com/content/dam/projects/dotcom/english/public/documents/timetables/Amtrak-System-Timetable-060118.pdf. live.
  106. News: Vantuono. William C.. ACS-64 technical support agreement under way. 15 October 2014. Railway Age. 29 September 2014. 18 October 2014. https://web.archive.org/web/20141018083158/http://www.railwayage.com/index.php/mechanical/locomotives/acs-64-technical-support-agreement-under-way.html?channel=35. live.
  107. AMTRAK RUNS TEST TRAINS OF UP TO 110 MPH IN PREPARATION FOR THE LAUNCH OF THE HARTFORD LINE ON JUNE 16 . 6 June 2018 . 27 September 2018 . Connecticut Department of Transportation . 28 September 2018 . https://web.archive.org/web/20180928044107/https://www.ct.gov/dot/cwp/view.asp?A=1373&Q=603150 . live .
  108. Web site: Davis. Wynne. Hoeffner. Tim. 2014 FRA Rail Program Delivery: MICHIGAN T.O. 5 Midwest. Federal Rail Administration. 4 August 2014. 17 January 2015. 7 October 2015. https://web.archive.org/web/20151007144123/https://www.fra.dot.gov/Elib/Document/4105. live.
  109. News: AMTRAK 110 MPH MICHIGAN SERVICE GIVEN GREEN LIGHT. 23 October 2012. Amtrak MDOT Press Release. 7 February 2012. 22 December 2012. https://web.archive.org/web/20121222220100/https://www.michigan.gov/documents/mdot/MDOT-12-010FRA_gives110mph_376056_7.pdf. live.
  110. Web site: Magliari . Marc . 2023-05-03 . 110 mph Schedules Coming for Amtrak Chicago-St. Louis Corridor . 2023-05-03 . Amtrak Media . en-US.
  111. News: Wolfe. Thomas. Passengers on Amtrak's Southwest Chief Experience a Community Away From Home. 21 October 2012. Red Orbit. 27 July 2005. 24 September 2015. https://web.archive.org/web/20150924130442/http://www.redorbit.com/news/technology/187759/passengers_on_amtraks_southwest_chief_experience_a_community_away_from/. live.
  112. Web site: Regional Transportation Plan 2012–2035. Southern California Association of Governments. 11 January 2015. 9. 11 January 2015. https://web.archive.org/web/20150111070616/http://rtpscs.scag.ca.gov/Documents/2012/final/SR/2012fRTP_PassengerRail.pdf. live.
  113. Web site: T21 Midterm Review. Chartered Institute of Logistics and Transport (Ireland). 29 July 2013. November 2010. https://web.archive.org/web/20150210213521/http://cilt.ie/images/stories/T21_Midterm_Review.pdf. 10 February 2015. dead.
  114. News: Lambert. Lisa. U.S. yanks high-speed rail funds for Wisconsin and Ohio. 3 November 2012. Reuters. 9 December 2010. 14 January 2016. https://web.archive.org/web/20160114090643/http://www.reuters.com/article/us-usa-infrastructure-highspeedrail-idUSTRE6B860B20101209. live.
  115. News: Rejected by Florida, U.S. reallocates $2 billion for high-speed rail. 3 November 2012. CNN. 10 May 2011. 17 September 2012. https://web.archive.org/web/20120917234112/http://www.cnn.com/2011/POLITICS/05/09/lahood.rail/index.html. live.
  116. News: Washington to get $590 million for high-speed rail improvements . 22 October 2012 . The Seattle Times . 27 January 2010 . dead . https://web.archive.org/web/20121017222206/http://seattletimes.com/html/localnews/2010910788_highspeedrail28m.html . 17 October 2012 .
  117. Web site: High-Speed Rail Program. WSDOT. 22 October 2012. https://web.archive.org/web/20121014084917/http://www.wsdot.wa.gov/rail/highspeedrail.htm. 14 October 2012. dead.
  118. Web site: Corridor Forum Meeting #1 – Summary. Oregon Passenger Rail – Eugene Portland. Oregon Passenger Rail. 3 November 2012. 29 May 2014. https://web.archive.org/web/20140529205137/http://www.oregonpassengerrail.org/files/meetings/corridor_forum/09252012/final_cf_summary_09252012.pdf. live.
  119. News: Levy. Paul. Plans for $1B rail line from Minneapolis to Duluth chugging along. 17 November 2014. Star Tribune West Metro. 29 June 2014. 29 November 2014. https://web.archive.org/web/20141129044618/http://www.startribune.com/local/west/265144831.html. live.
  120. Web site: River Route: Twin Cities to Chicago. Minnesota High-Speed Rail. 3 November 2012. 5 May 2012. https://web.archive.org/web/20120505020919/http://www.mnhighspeedrail.com/html/mn-rail-route.php. live.
  121. News: Dayton has hopes for high-speed rail in Minn.. 4 November 2012. Minnesota Public Radio. 25 February 2011. 6 November 2021. https://web.archive.org/web/20211106101723/https://www.mprnews.org/story/2011/02/25/dayton-high-speed-rail. live.
  122. News: Branstad kills Iowa involvement in high-speed rail. 4 November 2012. The Daily Iowan. 22 August 2011. 8 September 2012. https://web.archive.org/web/20120908185436/http://www.dailyiowan.com/2011/08/22/Metro/24459.html. live.
  123. Web site: Tier 1 Service Level EIS: Chapter 2 – Alternatives. Chicago to Council Bluffs-Omaha Regional Passenger Rail System Planning Study. Iowa Department of Transportation. 4 November 2012. 3 September 2013. https://web.archive.org/web/20130903163718/http://www.iowadot.gov/chicagotoomaha/pdfs/draftEIS/Chapter%202%20Alternatives.pdf. live.
  124. News: Omaha to Chicago (and possibly through Iowa City) Railway Route Study to Kick off this Month. 4 November 2012. Iowa City Patch. 6 February 2012. https://web.archive.org/web/20140529232642/http://iowacity.patch.com/groups/politics-and-elections/p/omaha-to-chicago-and-possibly-through-iowa-city-railw81492e66d1. 29 May 2014.
  125. News: Kaplan. Thomas. For Sale: 4 Weedy, Rusty Relics of a Doomed Rail Project. 8 November 2012. The New York Times. 31 May 2012. 10 February 2018. https://web.archive.org/web/20180210062203/http://www.nytimes.com/2012/06/01/nyregion/cuomo-administration-looks-to-sell-4-trains-from-failed-rail-project.html?_r=0. live.
  126. News: Express rail plan hits end of line . . 28 May 2005 . Cathy . Woodruff . https://web.archive.org/web/20140819084101/http://www.ble-t.org/pr/news/pf_headline.asp?id=13679 . 19 August 2014 . dead .
  127. News: Track cleared for upgrades; State suit settled; Amtrak to pay $20M, make improvements . . 13 December 2007 . Cathy . Woodruff . https://web.archive.org/web/20141111072558/http://alb.merlinone.net/mweb/wmsql.wm.request?oneimage&imageid=6433663 . 11 November 2014 . dead .
  128. Web site: Karlin. Rick. State's rusting trains sell for $420,000. 13 December 2012. 13 December 2012. 22 March 2016. https://web.archive.org/web/20160322232019/http://www.timesunion.com/local/article/State-s-rusting-trains-sell-for-420-000-4116188.php. live.
  129. Web site: The Ohio & Lake Erie Regional Rail Ohio Hub Study: Technical Memorandum & Business Plan. The Ohio Hub. Ohio Department of Transportation. 3 November 2012. https://web.archive.org/web/20120418024153/http://www2.dot.state.oh.us/ohiorail/Ohio%20Hub/Website/ordc/Ohio_Hub_Final_Docs/Final_Document_Rev_12_06_07/Executive_Summary_Full_Report.pdf. 18 April 2012. July 2007.
  130. Web site: Chapter 6: Intercity Passenger Rail . Wisconsin Rail Plan 2030 . Wisconsin Department of Transportation . 3 November 2012 . dead . https://web.archive.org/web/20130817004243/http://dot.wisconsin.gov/projects/state/docs/railplan-chapter6.pdf . 17 August 2013 .
  131. Web site: Wisconsin Rail Plan 2030 – Draft plan . Wisconsin Rail Plan 2030 . Wisconsin Department of Transportation . 3 November 2012 . dead . https://web.archive.org/web/20121025134111/http://www.dot.wisconsin.gov/projects/state/railplan-chapters.htm . 25 October 2012 .
  132. Web site: Rail Baltica Final Report Volume I. AECOM Limited. 13 November 2013. May 2011. https://web.archive.org/web/20131113052542/http://www.euregio-heltal.org/wp-content/uploads/2011/03/Rail_Baltica_Final_Report_Volume_I_31_05_11_FINAL_v2.pdf. 13 November 2013. dead.
  133. Web site: Welcome to Milan's World . 18 August 2018 . 19 August 2018 . https://web.archive.org/web/20180819081211/http://srmilan.tripod.com/ . live .
  134. Web site: Masse Rolls Out Need for Speed Campaign. Office of Brian Masse. 17 November 2012. https://archive.today/20130115064002/http://www.brianmasse.ca/post/masse-rolls-out-need-for-speed-campaign. 15 January 2013. dead.
  135. News: Windsor politicians disagree with rail study. 17 November 2012. CBCNews. 18 October 2012. 24 October 2011. https://web.archive.org/web/20111024130630/http://www.cbc.ca/news/canada/windsor/story/2011/10/18/wdr-high-speed-rail.html. live.
  136. News: Singh. Mahendra. Delhi to Agra in 99 minutes; train hits 160 kmph on trial run. 4 July 2014. The Times of India. 4 July 2014. 4 July 2014. https://web.archive.org/web/20140704035708/http://timesofindia.indiatimes.com/india/Delhi-to-Agra-in-99-minutes-train-hits-160-kmph-on-trial-run/articleshow/37732774.cms. live.
  137. Web site: Over Rs 30,000 Crore Cleared For Delhi-Meerut High-Speed Rail Corridor. NDTV.com. 12 November 2019. 27 August 2019. https://web.archive.org/web/20190827050043/https://www.ndtv.com/delhi-news/over-rs-30-000-crore-cleared-for-delhi-meerut-high-speed-rail-corridor-1996284. live.
  138. News: Radhakrishnan. S. Anil. 2020-06-09. K-Rail revises alignment of section. en-IN. The Hindu. 2021-07-19. 0971-751X. 19 July 2021. https://web.archive.org/web/20210719024535/https://www.thehindu.com/news/national/kerala/k-rail-revises-alignment-of-vadakara-thalassery-section/article31787611.ece. live.
  139. Web site: 2021-07-18. Indian Railways gears up to roll out 10 trains to link 40 cities in Vande Bharat boost: Report. 2021-07-19. Hindustan Times. en. 18 July 2021. https://web.archive.org/web/20210718155752/https://www.hindustantimes.com/india-news/indian-railways-gears-up-to-roll-out-10-trains-to-link-40-cities-in-vande-bharat-boost-report-101626582550550.html. live.
  140. Web site: High-speed Auckland to Rotorua rail link proposed. NZ Herald. 18 August 2017. 5 August 2017. 17 August 2017. https://web.archive.org/web/20170817193406/http://www.nzherald.co.nz/rotorua-daily-post/news/article.cfm?c_id=1503438&objectid=11905926. live.
  141. News: Tron Express launch date pushed back . 31 May 2019 . Hamilton News . 4 . 3 June 2019 . 3 June 2019 . https://web.archive.org/web/20190603011804/https://www.pressreader.com/new-zealand/hamilton-news/20190531 . live .
  142. Web site: China in Panama: High-speed rail, mega infrastructure news + more. 28 September 2018. 24 November 2019. 1 August 2020. https://web.archive.org/web/20200801144236/https://www.panamaequity.com/exploring-living-in-panama/china-in-panama-high-speed-rail-mega-infrastructure-news-more/. live.
  143. Web site: Towards Improving Connectivity Between the Bicol and Calabarzon Regions. nro5.neda.gov.ph. National Economic and Development Authority. 8 February 2020. 14 November 2019. https://web.archive.org/web/20191114164301/http://nro5.neda.gov.ph/towards-improving-connectivity-between-the-bicol-and-calabarzon-regions/. live.
  144. PNR Bicol Express Train (Junn Magno's Interview on Dos Por Dos). DZRH, via Jessv PH on Youtube. 22 January 2022. 22 January 2022.
  145. Preliminary Service Options Performance Report. Northern New England Intercity Rail Initiative. massDOT. 11. 21 January 2015. April 2014. 21 January 2015. https://web.archive.org/web/20150121084907/http://www.massdot.state.ma.us/Portals/39/Docs/ServiceLeveland_April%2022_2014_small.pdf. live.
  146. Web site: Public Meetings White River, VT & Springfield, MA January 22 and 23, 2014. Northern New England Intercity Rail Initiative. massDOT. 21 January 2015. 21 January 2015. https://web.archive.org/web/20150121084047/http://www.massdot.state.ma.us/Portals/39/Docs/2014-01-24NNEIRIPresentationforWebsite.pdf. live.
  147. Web site: Stakeholder Meeting Pioneer Valley Planning Commission May 7, 2014. Northern New England Intercity Rail Initiative. massDOT. 21 January 2015. 21 January 2015. https://web.archive.org/web/20150121084343/http://www.massdot.state.ma.us/Portals/39/Docs/2014_May%207_StakeholdePresentation_Final.pdf. live.
  148. Web site: Virginia-North Carolina Interstate High-Speed Rail Compact: Lengthening and Strengthening the Northeast Corridor (NEC) – April 20, 2012 . Regional Transport Alliance . 22 October 2012 . dead . https://web.archive.org/web/20141020223728/http://www.letsgetmoving.org/images/uploads/pages/VA-NC-HSR-Compact-one-page-summary.pdf . 20 October 2014 .
  149. News: Public to Weigh in on D.C. to Richmond Higher Speed Passenger Rail. 15 October 2014. U.S. Department of Transportation Federal Railroad Administration Press Release. 6 October 2014. 18 October 2014. https://web.archive.org/web/20141018150703/http://www.nbc29.com/story/26718018/public-to-weigh-in-on-dc-to-richmond-higher-speed-passenger-rail. live.
  150. Randy Brown . Jason Orthner . 4 August 2014 . 2014 FRA Rail Program Delivery: Southeast Region . Federal Railroad Administration . 16 January 2015 . 4 March 2016 . https://web.archive.org/web/20160304092147/http://www.fra.dot.gov/Elib/Document/4104 . live .
  151. Recommendation Report: Southeast High Speed Rail Richmond, VA to Raleigh, NC, Tier II Environmental Impact Statement . DRPT and NCDOT . 10 . 19 May 2014 . dead . https://web.archive.org/web/20131018150716/http://sehsr.org/pdf/Report.pdf . 18 October 2013 .
  152. Book: Columbus to Atlanta High Speed Rail Feasibility Study – Final Report. February 2014. Columbus Consolidated Government. 17 December 2016. 3 July 2014. https://web.archive.org/web/20140703092748/http://columbusga.org/planning/hs-rail/CHSR_Report_Final.pdf. live.
  153. News: Barrow. Keith. Columbus – Chicago passenger rail study published. 20 July 2013. International Railway Journal. 18 July 2013. 7 December 2013. https://web.archive.org/web/20131207050244/http://www.railjournal.com/index.php/north-america/columbus-%E2%80%93-chicago-passenger-rail-study-published.html. live.
  154. News: LeDuc . Doug . Support for passenger rail study gains steam . https://archive.today/20130720024612/http://www.fwdailynews.com/news/latest/support-for-passenger-rail-study-gains-steam/article_0dd859a0-4533-5e60-a737-577a91d3e04a.html . dead . 20 July 2013 . 20 July 2013 . FW Daily News . 9 March 2012 .
  155. News: Dawsey. Chastity Pratt. Plans on track for passenger train from Ann Arbor to Traverse City, group says. 21 April 2018. Bridge. 17 April 2018. 21 April 2018. https://web.archive.org/web/20180421163139/https://www.bridgemi.com/quality-life/plans-track-passenger-train-ann-arbor-traverse-city-group-says. live.
  156. News: Amtrak Midwest trains get green light to increase max speed on Michigan route . 19 May 2021 . Progressive Railroading . 18 May 2021 . 18 May 2021 . https://web.archive.org/web/20210518155416/https://www.progressiverailroading.com/amtrak/news/Amtrak-Midwest-trains-get-green-light-to-increase-max-speed-on-Michigan-route--63505 . live .
  157. Web site: Chicago-Milwaukee Environmental Assessment & Service Development Plan: Agency Stakeholder Meeting . Wisconsin Department of Transportation . 19 January 2015 . 2 December 2014 . dead . https://web.archive.org/web/20150119044455/http://www.dot.wisconsin.gov/projects/rail/docs/chi-mil-12-2-14.pdf . 19 January 2015 .
  158. Book: Northern Lights Express Passenger Rail Project from Minneapolis to Duluth, Minnesota Finding of No Significant Impact and Section 4(f) Determination. 20 February 2018. Federal Railroad Administration. 13 March 2018.
  159. Web site: March 2011 Narrative Application Form – Individual PE/NEPA, Part I: MO-KC to STL Corridor-Pleasant Hill to Jefferson City (90 mph) PE/NEPA. Missouri Department of Transportation. 13 February 2013. 9 November 2012. https://web.archive.org/web/20121109091022/http://modot.org/othertransportation/rail/documents/12PHtoJC.pdf. live.
  160. Web site: Show Me Improved Rail Service. Missouri Department of Transportation. 13 February 2013. April 2011. 9 November 2012. https://web.archive.org/web/20121109091218/http://modot.org/othertransportation/rail/documents/Application%20Summary%20for%20FRA%20HSIPR%20FY%202011%20Projects.pdf. live.
  161. Web site: Final Alternatives 2013. Arizona Department of Transportation. 19 May 2014. 19 May 2014. https://web.archive.org/web/20140519192216/http://www.azdot.gov/docs/default-source/planning/final-alternatives-2013.pdf?sfvrsn=0. live.
  162. Book: Arizona Passenger Rail Corridor Study – Tucson to Phoenix: Record of Decision. 1 December 2016. Arizona Department of Transportation. 17 October 2017. 15 May 2017. https://web.archive.org/web/20170515014439/https://www.fra.dot.gov/Elib/Document/16858. live.
  163. News: Barron. Sean. Eastgate advisory board talks about high-speed rail service. 30 September 2014. The Vindicator. 5 September 2014. 15 September 2014. https://web.archive.org/web/20140915160021/http://www.vindy.com/news/2014/sep/05/eastgate-advisory-board-talks-about-high/. live.
  164. News: Williams. Jason. High-speed rail to Chicago sought. 30 September 2014. Cincinnati.com. 23 September 2014. 27 February 2021. https://web.archive.org/web/20210227224950/https://www.cincinnati.com/story/news/2014/09/22/passenger-rail-to-chicago/16072133/. live.
  165. News: Hamilton County Commissioners Back High-Speed Rail . 30 September 2014 . WKRC TV . 25 September 2014 . dead . https://web.archive.org/web/20140929172153/http://www.local12.com/news/features/top-stories/stories/hamilton-county-commissioners-back-highspeed-rail-18126.shtml . 29 September 2014 .
  166. News: Fleming. Leonard N.. Grand Rapids, Detroit train idea taking shape. 10 August 2015. The Detroit News. 21 July 2015. 16 August 2015. https://web.archive.org/web/20150816104004/http://www.detroitnews.com/story/news/local/michigan/2015/07/20/detroit-gr-train-proposal/30448267/. live.
  167. News: Jones. Peggy. A bullet train in East Texas? Company plans to build Dallas-Houston route. 24 October 2012. News Journal, Longview, Texas.
  168. News: Vietnam plans to build faster railway to China border. 21 April 2018. VietnameNet Bridge. 9 April 2018. 22 April 2018. https://web.archive.org/web/20180422062413/http://english.vietnamnet.vn/fms/society/198640/vietnam-plans-to-build-faster-railway-to-china-border.html. live.