A liquefied natural gas terminal is a facility for managing the import and/or export of liquefied natural gas (LNG). It comprises equipment for loading and unloading of LNG cargo to/from ocean-going tankers, for transfer across the site, liquefaction, re-gasification, processing, storage, pumping, compression, and metering of LNG.[1] LNG as a liquid is the most efficient way to transport natural gas over long distances, usually by sea.

Types

Liquefied natural gas terminals can be classed as: liquefaction terminals for the export of LNG[2] or regasification terminals for the import of LNG.[3] LNG terminals may combine both functions.

FSRU

See main article: Floating liquefied natural gas. A floating storage and regasification unit (FSRU) is an LNG terminal whose main structure is a special ship moored near a port. As of January 2014 there are operating FSRUs in Brazil, Argentina, Kuwait, Israel, the UAE, Italy, Indonesia, China, Turkey and Lithuania.[4]

Terminal processes and equipment

Unloading and loading of LNG

Terminal facilities include jetties and piers with articulated loading/unloading arms[5] for transferring LNG between ship and shore. It also includes the piping used to transport LNG between the loading arms and the storage and processing facilities at the terminal. LNG is kept at about -162abbr=NaNabbr= to maintain it in a liquid state. Conventional carbon steels are brittle at this temperature. Therefore, special metals are used for this low-temperature cryogenic service where metal is in contact with LNG. Appropriate materials include aluminium alloys with 3 to 5 percent magnesium and high nickel steels containing 9 per cent nickel.[6] The loading/unloading arms and pipework are insulated to prevent heat gain from the air to minimise the vaporization of LNG.[7] Tankers being loaded with LNG displace the vapour volume in their tanks, this gas is routed to boil-off or gas recovery storage tanks. Gas may then be compressed and fed into the local gas network, or it may be routed to the liquefaction plant and returned as liquid to the LNG storage tanks.

Pier

A LNG pier is a specialized kind of working pier designed for the loading and offloading of liquefied natural gas to/from ships and shore based tanks.

A LNG pier could accommodate LNG carriers of a range of sizes.[8] They may be capable of handling LNG tankers of 70,000 to 217,000 cubic metres (m3) cargo capacity (Q-Flex); or tankers of 125,000 to 266,000 m3 cargo capacity (Q-Max).[9] The pier would have at least two insulated lines, one for loading and/or unloading LNG and one for vapor supply or recovery as the vapor space above the LNG changes as the cargo is transferred. Ship-based or shore-based cryogenic pumps[10] are used to transfer the LNG to/from the LNG storage tanks on shore.

Some of these piers are very long, up to, in order to reach to the depth of water required to accommodate LNG tanker traffic.

Storage of LNG

The LNG flows through the pipelines that connect the loading arms on the jetty to storage tanks. Tanks are usually of double wall construction, with the inner tank constructed of low-temperature alloy. This is surrounded by insulation to reduce heat gain and an outer tank of conventional steel or pre-stressed reinforced concrete. In-ground LNG tanks are also used; these are lined or unlined tanks beneath ground level.[11] The low temperature of the LNG freezes the soil and provides effective containment. The tank is sealed with an aluminium alloy roof at ground level. Historically there have been problems with some unlined tanks with the escape of LNG into fissures, the gradual expansion of extent of the frozen ground, and ice heave which have limited the operational capability of in-ground tanks.[12] All piping connected to the LNG tanks, whether above ground or in-ground, are routed through the top of the vessel. This militates against loss of containment in the event of a piping breach. Tanks may be situated within a bund wall to contain the LNG in the event of a rupture of the tank.[13] This is usually a steel or concrete wall surrounding the tank to half the tank height.

Heat transfer into the tanks causes vaporisation of the LNG. This boil-off gas is routed to a boil-off gas holder.[14] Gas may be returned to an unloading ship to make up the vapor space volume. Alternatively it may be compressed and fed into the local gas network, or it may be routed to the liquefaction plant and returned as liquid to the LNG storage tanks

Regasification

Regasification is the process of converting LNG from a liquid to a gaseous state. This requires significant quantities of heat energy to supply the enthalpy of vaporization of LNG and to heat it from -162 °C to about NaNabbr=NaNabbr= for introduction into a pipeline. Gas may be sent to a main gas transmission system, which typically operates at 70–100 bar. NGL is first pumped as liquid to this pressure. A series of heat exchangers are used to regasify the LNG. These may include submerged combustion vaporisers,[15] or an intermediate fluid exchanger (using propane or other fluids),[16] or the use of waste heat from a nearby plant such as a power station.[17] Final heating of the gas may use air or seawater heat exchangers.

To meet the quality specification of the gas transmission system, the outgoing gas may need to be analysed and enriched or diluted. Propane may be added to enrich the gas and nitrogen to ballast or dilute it.[18] Prior to distribution into a high-pressure transmission system, the regasified natural gas is metered and dosed with a stenching or odorizing agent.

Liquefaction

At times of low demand, gas may be withdrawn from a transmission system and liquefied and stored. There are several proprietary systems that are used to liquefy natural gas and turn it into LNG. For full details of processes, see liquefied natural gas.

See also

Notes and References

  1. http://www.lei.lt/energy-security-conference/index_files/Masiulis.pdf LNEG terminal project in Lithuania
  2. http://www.cbi.com/markets/lng/liquefaction-export-terminals Liquefaction Export Terminals
  3. http://total.com/en/energies-expertise/oil-gas/trading-shipping/fields-of-expertise/transportation-storage/regasification Regasification of LNG: Strategic Access to Markets
  4. http://www.globallnginfo.com/World%20LNG%20Plants%20&%20Terminals.pdf World's LNG Liquefaction Plants and Regasification Terminals
  5. Web site: Marine loading arms. 6 June 2020. Flotech.
  6. Walters. W. J. and J. A. Ward. 1965. Facilities for Importation of liquid methane into Canvey Island. Institution of Gas Engineers Autumn Meeting 1965. 1–22.
  7. Web site: Your guide to cryogenic insulation. 5 June 2020. Herose.
  8. Web site: Marine Insight. LNG Tankers – Different Types And Dangers Involved. 13 June 2020. Marine Insight.
  9. Web site: Marine Insight. 28 December 2015. Q-Max Ships: The Largest LNG Ships in the World. 13 June 2020. Marine Insight.
  10. Web site: Science Direct . 1998 . Handbook of Vacuum Science and Technology - Cryogenic Pumps . 13 June 2020 . Science Direct.
  11. Web site: LNG Receiving Terminal, Storage Tank . 6 June 2020 . IHI Corporation.
  12. Murray. Stephen. 2017. A history of the oil, gas and petrochemical industries on Canvey Island. Essex Archaeology and History. 8. 117 and 120.
  13. Hjorteset. Kare etc.. 2013. Development of large-scale precast, prestressed concrete liquefied natural gas storage tanks. https://web.archive.org/web/20200607031535/https://pdfs.semanticscholar.org/a2df/8a0c0ab5bcfe66152e9109c6c050b75267fb.pdf. dead. 2020-06-07. 7 June 2020. PCI Journal. 58. 4. 10.15554/PCIJ.09012013.40.54. 51020545.
  14. Web site: fluenta. LNG: what is boil-off gas and what does it do?. 6 June 2020. fluenta.com.
  15. Web site: April 1997. Submerged combustion vaporisers for LNG distribution facilities. 7 June 2020. Digital Refining.
  16. Web site: Solberg . Erik Langaard . August 2015 . A comparative Analysis of Propane and Ethylene Glycol as Intermediate Fluid in a LNG Regasification System . 7 June 2020 . Norwegian University of Science and Technology.
  17. Web site: Isle of Grain Combined Heat and Power (CHP) Station, Kent, United Kingdom. Power Technology.
  18. Web site: South Hook LNG Terminal Facilities. 6 June 2020. South Hook LNG Terminal.