A joint support ship (JSS) is a multi-role naval vessel capable of launching and supporting joint amphibious and airlift operations. It can also provide command and control, sealift and seabasing, underway replenishment, disaster relief and logistics capabilities for combined land and sea operations.

Background

The preliminary ideas for joint support ships arose from the development of "helicopter carriers", classes of vessels such as landing platform docks (LPDs) and landing helicopter docks (LHDs) designed for the operation of rotary-wing and other types of vertical take-off and landing (VTOL) aircraft. Unlike conventional fixed-wing aircraft carriers, these vessels do not require steam catapults for the launching of aircraft or arresting cables for the recovery or aircraft, and thus provided more space below the flight deck which could be utilised for other purposes. Some early LHDs were converted World War II-era aircraft carriers such as the United States Navy (USN)'s Essex-class vessels, but later designs often featured non-full length flight decks, usually at rear of the vessel.[1]

While initial emphasis was placed upon airborne operations, as the need for combined forces capabilities grew, facilitating amphibious operations also became a requirement, and later designs such as the Royal Navy (RN)'s LPD emerged featuring a well dock to launch and recover personnel, vehicular and utility landing craft, and in the case of the USN's LPD, landing helicopter assault (LHA) and other similar classes of vessels, tracked amphibious landing vehicles such as the AAVP-7A1.[1] [2]

To support the air- and sea-going craft these vessels carried, they often featured fuel bunkers with increased storage capacity, and were often utilised as supplementary auxiliary ships to provide underway replenishment (UNREPs) to other vessels. Their absence of large calibre weapons on weather decks and with increased storage space below, they also proved very useful at sealift operations. Many also had onboard hospital facilities and the vessels served as casualty evacuation vessels. These multiple roles were demonstrated in 1956 during the Suez crisis, where the helicopters of, a former World War II aircraft carrier repurposed to a helicopter carrier, were not only used to transport Royal Marines to the shore but supplies and other cargo as well, and return with wounded troops. With a combination of army (or marine) and navy personnel and aircrew onboard, and often equipped with a wide range of sensor suites, these vessels were utilised as ad-hoc or formal joint command and control centres, as demonstrated during the Vietnam War, the Falklands War and the Gulf War.[2] [3]

With their multi-role capabilities, these vessels have also proven extremely useful in civil emergencies, providing humanitarian aid and disaster relief at times of natural disasters, and for peace-keeping duties providing logistical support for internally displaced persons (IDPs), and this capability is often factored into tender requirements during procurement processes (and which can be helpful at justifying the need for these vessels to politicians).

Examples of vessels of other classes that have undertaken multiple roles for which a JSS is intended to fulfil include:

As a result of the multi-role nature of these operations, a new type of vessel emerged, the joint support ship, as a hybrid of two very different classes of vessels, amphibious assault ships and auxiliary ships.

Design features

While the specific roles that a JSS is designed to fulfil varies between navies (e.g. the Canadian Protecteur class features a reinforced hull for Arctic operations), most vessels share common features to support the basic roles they provide for both navies and armies. Below are some examples of these common features:

Furthermore, to fulfil its missions a flexible modular design allows for configuration of temporary areas for different purposes as missions require. As such it is basically a combination of an amphibious warfare ship and auxiliary ships like replenishment oiler, transport ship, and hospital ship in one.[13]

Vessels in service

Royal Canadian Navy

See main article: Protecteur-class auxiliary vessel.

In 1999 the Canadian government sought to replace the Royal Canadian Navy's ageing of auxiliary oiler replenishment (AOR) ships through the Afloat Logistic Support Capability (ALSC) program. The replacement program envisioned tanker ships with roll-on/roll-off (RORO) sealift capability. These multi-role ships were envisioned to deploy mobilised forces directly to the beach.[14]

In 2004, Public Works and Government Services Canada (PWGSC) issued a request for proposal (RFP) for the joint support ship (JSS) to replace three AOR ships, although one AOR ship was already retired by the time the RFP was released. The RFP capped the bid price at C$1.5 billion (most reports state the cost was C$2.1bn, however C$600 million was reserved for the government's own project costs, and was not included in the RFP bid ceiling price). The RFP called for three multi-role ships capable of refuelling ships at sea, providing ship-borne helicopter support, heavy sealift capability, a mobile hospital, a joint force headquarters centre, and a strengthened hull for operations in sea ice.[15]

PWGSC cancelled the program in 2008 after stating all the received bids were above the mandatory budget. The Canadian government restarted the JSS procurement process in the same year.[14]

In 2013 Canada selected the replenishment ship design to replace the Protecteur-class fleet. The German design provides fuel, provisions, ammunition, and some materiel and medical capabilities, and can land up to two helicopters. [15] The ships are to be built in Vancouver by Seaspan Shipyards under the National Ship Procurement Strategy (NSPS). [14]

Originally to be designated as the Queenston class with ship names of HMCS Queenston and HMCS Châteauguay (named after battle sites from the War of 1812), in 2017 the Royal Canadian Navy renamed the joint support ships to the former Protecteur-class designation, re-using the same ship names HMCS Protecteur and HMCS Preserver.[16]

The cost of building the two replenishment ships was set at C$2.3bn with first delivery occurring in 2018. In 2018, the government's own review indicated the total cost was then calculated to be C$3.4bn, with first delivery not likely before 2022 or 2023.[17] As of 2019, delivery of the first vessel was expected to occur in 2023 followed by the second vessel in 2025. [18] Those dates were each reported in 2022 to have slipped by a further two years.[19]

Royal Netherlands Navy

See main article: HNLMS Karel Doorman (A833).

The Royal Netherlands Navy operates a single JSS, HNLMS Karel Doorman, which officially entered service in 2015 and replaced both of that force's existing replenishment oilers, and .[10]

The vessel was constructed by the Damen Group, at their shipyard in Galați, Romania, although installation of weapon systems and final fit-out was undertaken in Vlissingen, the Netherlands. The vessel has the following design features:[20]

In November 2014, despite the fact the vessel had only recently completed sea trials but not yet commissioned, it was sent on a three-month deployment to West Africa as part of the European Union's response to an Ebola outbreak, where it delivered ambulances, portable hospitals and medical supplies to Guinea, Liberia and Sierra Leone.[21]

In 2016 the Dutch and German Ministers of Defence agreed that HNLMS Karel Doorman would be shared by both the Royal Netherlands Navy and the German Navy.[22]

Planned vessels

Royal Australian Navy

In July 2020 the Australian government published its 2020 Force Structure Plan and 2020 Defence Strategic Update announcing its intention to procure two locally-built two multi-purpose auxiliary vessels able to perform both sealift and replenishment operations under project SEA2200, to replace the Royal Australian Navy's current landing ship dock (LSD) . The new class of JSS vessels would also supplement the RAN's two LHDs which entered service commencing in 2015 to increase its combined forces projection capabilities in the region.[23] [24]

In anticipation of the forthcoming requirement, at the PACIFIC 2019 naval defence exposition in October 2019, Navantia, the company which produced a large number of the RAN's new vessels including the s (AORs), displayed a design for a JSS. The new ship, based upon the company's LPD, features a forward superstructure, large rear helicopter deck and rear well dock, and is said to combine 70% of the load capacity of HMAS Choules and 70% of the fuel capacity of, the AOR decommissioned that year. Specific features include:[25]

In May 2022 the BMT Group, the company that upgraded HMAS Choules when it was acquired from the Royal Navy, displayed their Ellida design at INDO PACIFIC 2022. This vessel is based on the same family of auxiliary craft as the tankers operated by the Royal Fleet Auxiliary and features a large roll-on/roll-off (RoRo) cargo deck as well as stowage for large quantities of provisions and equipment to conduct underway replenishment.[26]

The Damen Group, the company that constructed the JSS for the Royal Netherlands Navy, is also expected to submit their design.[26]

In May 2021, Navantia's Australian subsidiary announced plans to expand its manufacturing capability in Western Australia, and if successful in winning the contract for the RAN's JSS, market this vessel to overseas customers.[27]

Royal New Zealand Navy

It was reported in May 2021 that the Royal New Zealand Navy is a potential customer for further units of joint supply ships to be constructed in Australia.[27]

Cancelled vessels

German Navy

In the mid-1990s, after the end of the Cold War and the resultant change in both the European and global security situation, as well as the reunification with East Germany, Germany's armed forces underwent strategic transformation. Prior to this, the focus of the Bundeswehr was on national defence, but with conflicts in the Balkans, the Gulf War and Somalia which saw multi-national responses, the focus of country's armed forces shifted towards fulfilling Germany's obligations as a member of the international community. There was also an emphasis by NATO of preemptive intervention in "hotspots" around the globe, which required an increase in air and sea uplift capacity so as to deploy reaction forces. Specifically, the German navy was to have the capability to transport a small peacekeeping contingent with the vessel(s) also serving in the role of mission command and coordination. Furthermore, Somalia highlighted the need to provide humanitarian relief.[28]

The German Navy (Deutsche Marine), the smallest branch of the country's armed forces, was ill-equipped for these new requirements, and commenced plans to commission a suitable vessel. This resulted in the Taktische Konzept Mehrzweckschiff project - the "Tactical Concept Multipurpose ship", and in late 1994 MTG Marinetechnik GmbH, the company established by the West German government in 1966 to design warships, responded with a conceptual design for a combined command, transport and hospital vessel that could be used by all branches of the Bundeswehr for global deployments. The cost of the vessel was estimated at 620 million Deutsch Mark (approximately US$395 million). The proposed vessel would feature:[28]

However, the high cost of the proposed vessel caused alarm among certain members of the Bundestag, the country's parliament, and in March 1995 the Chairman of the Defence Committee, Klaus Rose, argued against its acquisition and in May 1995 the Minister of Defence, Volker Rühe announced the project was to be stopped.[28]

The navy persisted that the vessel was required and in 1998 the Weizsäcker-commission was formed, which advised the government of the need for a "transport and deployment support ship". This resulted in Einsatz Truppenunterstützungsschiff (Multi purpose Carrier) specifying an even larger ship with a displacement of 18,000 tonnes, possibly based upon Navantia's Galicia class. In 2003 this too was cancelled, apparently over concerns about the cost. Still the navy persisted and in 2007 announced that Joint Support Ships were to be included in their 2009 plan but by this stage they did not have the support of the army and the plan did not proceed.[28]

In 2009 the Ministry of Defence published Flotte 2025 +, its plan for the future of the navy until 2025 which not only resurrected the proposed construction of two joint supply ships, but also included two Mehrzweckeinsatzschiffs, multipurpose dock ships that would be larger than a JSS. The plan was later updated to also include another multi-purpose ship, a Multi-role Helicopter Dock Expeditionary Support vessel of a modular design that could be reconfigured for various mission profiles and which would also be utilised for a future JSS class. In 2016 this plan was also cancelled due to concerns over its high cost.[28] [29]

As a cost-saving measure, in 2016 the German Minister of Defence signed an agreement with their Dutch counterpart to share the NLMS Karel Doorman, the JSS under construction for Royal Netherlands Navy.[22]

Similar vessels

Indian Navy

See main article: Indian Navy amphibious vessel acquisition project. In 2011 the Indian Navy (IN) published a Request For Information (RFI) for four multi-role support vessels (MRSV), similar in requirements and capabilities to a JSS, to supplement their existing LPD . This resulted in the publication in December 2013 of a Request For Proposal (RFP) for four more LPDs, rather than a new class of vessel, to be constructed. In November 2020 the scope of the RFP was reduced to two ships before the project was eventually cancelled before construction commenced.[30]

In August 2021 the IN published a new RFI for four LHDs, with the first vessel expected to enter service no earlier than 2025. While these ships are technically LHDs they are a multi-role vessel that will undertake a similar range of duties as a JSS including:[31]

Royal Malaysian Navy

See main article: Multi-role support ship (Malaysia). In September 2021 the Malaysian Minister of Defence announced that his country's government would procure two a multi-role support ships (MRSS), vessels very similar in specification to a JSS, for the Royal Malaysian Navy (RMN). The vessels would enhance the RMN's strategic sealift capabilities between Peninsular Malaysia and the East Malaysian states of Sabah and Sarawak on the island of Borneo.[32]

The nature of the MRSS requirements leads towards a smaller version of existing amphibious assault vessels currently available from multiple international shipbuilders, including the French and the Chinese Type 075 landing helicopter docks (LHDs), and Dutch Enforcer-class and Indonesian landing platform docks (LPDs). Navantia Australia proposed that their design for the RAN's JSS could fulfil this role, but the proposed vessel was not included in the list of designs being considered.[25] [32] [33]

The procurement of these vessels is expected to commence in 2024.[32]

United States Navy

The USN operates the world's largest fleet of amphibious assault vessels (AAV) with a number of different classes of ships of various sizes and capabilities that can fulfil a wide range of roles. Of particular relevance to the subject of joint supply ships are the amphibious command ship (ACS) and the LPD.

Blue Ridge-class ACS

The Blue Ridge-class ACS are the USN's and worlds's first and only amphibious command ship, brought about due to previous command ships having insufficient speed to keep up with a 20kn amphibious force. They are based upon the landing platform helicopter (LPH) ships, the USN's first class of dedicated helicopter carriers which began entering service in 1961. The basic design was modified to incorporate a bridge and operations superstructure located amidship along with a rear helicopter deck and communication and sensor masts located on the forward weather deck in place of the base vessels' island bridge and full-length flight deck. There are only two vessels in the class, USS Blue Ridge and USS Mount Whitney, and are the command vessels for the 7th and 6th Fleets respectively.[34]

While theses vessels have greater command and control capabilities than the class upon which they are based, they are limited by the fact that they lack a well dock and are thus deficient in terms of amphibious operations compared to other classes of AAVs in the USN. They are also limited in size of the rotorcraft they can operate, with the biggest being the CH-47 Chinook, and are not able to operate the CH-53 Sea Stallion nor the MV-22 Osprey. Therefore, away from shore-based facilities, their air- and sea-lift capabilities are limited to the helicopters that they can support[34]

They are the oldest commissioned vessels in the USN's fleet, with both vessels undergoing a major modernisation program in 2011 to extend their service lives for at least another 20 years, and Blue Ridge a US$60M propulsion plant overhaul in 2018. However, question marks exist surrounding their remaining scheduled operating lifespan, with the navy facing budget cutbacks and placing a greater emphasis on common capital infrastructure (i.e. weapons systems, power plants, etc.) to reduce cost, and with congressional pressure to reduce the size of its amphibious fleet, with just two class members and little commonality with other classes, they may be candidates for early retirement.[34] [35] [36]

San Antonio-class LPD

The San Antonio-class LPD is the USN's most numerous AAV with 12 ships currently in service as of December 2022 and with three further vessels under construction and another on order.[37]

The class is marketed by its builders, Ingalls Shipbuilding, as a multi-role vessel, and was described by a former Chief of Naval Operations (CNO) as "modular trucks" in reference to its versatility and sealift capacity, who proposed the fitting of modular mission bays as utilised by the navy's littoral combat ships to increase its capabilities. Compared to earlier AAVs such as the Austin class it replaced, this class features larger and more capable sensor suites making it an ideal command and control platform, and unusual for this class of vessel (and more akin to an air warfare destroyer (AWD) features two large sensor masts. In fact, it has been proposed that the Aegis Ballistic Missile Defense System (Aegis BDM), as fitted to the AWDs, be fitted to this ships within class to further increase their multi-mission capabilities.[38] [39] [40]

In recent years the USN has put greater emphasis upon the use of unmanned aerial vehicles (UAV) and unmanned combat aerial vehicles (UCAV), and the San Antonio class makes an excellent candidate as an operations platform, and since 2013 the RQ-21 Blackjack, launched from a portable catapult, has been operated from several ships in this class including USS San Antonio and . In early 2021, was involved in trials with Martin UAV for its V-Bat VTOL UAV.[41] [42] [43]

Future vessels

There are a number of issues facing the USN's capabilities for amphibious warfare, sealift and multi-mission operations:

  1. Decrease in funding: budget cuts are expected in financial years 2024 and 2025 that will be result in the navy facing a "blackhole" in that they will not have sufficient funding to fulfil their proposed 5-year construction plan due to commence in 2025.[44]
  2. Reduction in sealift capacity: In October 2022 the US Navy failed to meet its readiness goal for amphibious ships of 80%, with only 45% of the fleet available. Furthermore, the navy and the Marine Corps have differing views upon the navy's sealift capacity; while there are currently 32 vessels in the amphibious fleet the USMC is pushing for 38 vessels while the USN is looking to operate only 24-28 vessels to meet budget constraints. Current and future capacity is being reduced by, or under threat of reduction by, the following changes:[36] [44] [45]
  3. Increase command & control and information gathering & sharing capabilities: Among the navy's priorities is increasing the command and control capabilities of its amphibious assault fleet to take advantage of the increased amount of data the F-35 Lightning Joint Strike Fighter, operated by the Navy and the Marine Corps, can gather. However, while this aircraft's systems can interface with those of the Blue Ridge-class ACS and San Antonio-class LPDs, it cannot with the, and with seven vessels of this class currently in service, is the second largest class of amphibious ship in the USN behind the San Antonio class. However, any plan to upgrade these vessels, is, as of December 2022, currently unfunded.[44]
  4. Viability of the LCS program: the USN operates two classes of littoral combat ships (LCS), the and the, which with their extensive list of problems are considered by many in Congress and the Department of Defense to be expensive failures and should be prematurely retired from service. While these vessels cannot fulfil all the roles of a JSS, they were supposed to be the navy's premier multi-mission vessels, and if they are removed from service would create a gap in certain capabilities for the Navy.[46]
  5. Next-Generation Logistics Ship (NGLS) Program: NGLS is quite an important project for the USN as not only will it responsible for the Navy's next auxiliary ships but it marks a fundamental shift in the recent design philosophy that "bigger is better", which has seen most other classes of ships grow in size. The USN's emerging doctrine of anti-access/area-denial (A2/AD) aims to create a "no-go zone" for an opposing force in times of conflict built upon more distributed fleets with a reduced proportion of larger ships and an increased proportion of smaller ships, thus lessening the risk posed by concentrated attacks on a relatively small number of large, high-value targets. Vessels in the NGLS program will be part of that objective.

    Currently, the USN is constructing the new TAO (oilers), traditional large - and expensive - vessels at more than $700 million per ship, built at a rate of just one ship per year. The NGLS program would instead deliver a new class of smaller ships that would be less expensive and faster to construct yet meet the requirements for refuelling, rearming and resupply operations. However, these vessels, described as "medium-sized" ships, are not intended to replace but to supplement these new vessels and existing classes such as the Fast combat support ship, with an emphasis on operations in contested and littoral environments deemed too high a risk for larger vessels.

    The Navy's five-year shipbuilding plan for financial years 2023–FY2027 outlines the procurement of the first NGLS in 2026 at a cost of $150 million and the second in 2027 at $156 million, each around the fifth of the cost of a John Lewis-class vessel. It is not yet determined how many vessels will be constructed but the 30-year plan commencing 2023 proposes at least a dozen or so ships, and perhaps twice that number or more. It is envisaged that they will be a family of vessels built upon a common modular design, rather than single type. In December 2021 Austal USA was selected for the program's design study at a cost of $2 million.[47] [48]

In essence, these are the same problems that other countries that operate or are acquiring joint supply ships faced. Furthermore, it is also important to recognise the significance of the downsizing of the proposed NGLS vessels in respect to the USN's future plans. This all leads to the question - could the USN develop a JSS in the near future to satisfy its emerging needs? While there is no such vessel currently planned, the new NGLS could be considered as a JSS in all but name, although it remains to be seen until the design is finalised as to whether these ships will feature the amphibious operations capability of similar ships in other navies.

Royal Danish Navy

Royal Danish Navy built two s in 2003–2005, which are a hybrid between a frigate and a support ship with multiple role capabilities,[49] with the capacity to be transformed from a combat ship with the firepower of a traditional frigate to a hospital ship within a day.[50] The class is based on a frigate-like design, but built with an internal multipurpose deck (flex deck) and a stern vehicle ramp. The ships can serve as command platforms for a staff of 75 persons (naval or joint staff) with a containerized command and control centre, transport and base of operations for a company-sized landing force of some 200 soldiers with vehicles. Alternatively, the flex deck can be used for mine-laying operations with a capacity of some 300 mines, or be fitted out for mine-clearing operations and launch and recover mine detecting and clearing equipment via a retractable gantry crane, adjacent to the stern vehicle ramp, which also is used for launching and recovering the fast landing craft. Furthermore, the flex deck can support a containerized hospital or simply transport a number of ISO standard containers or some 55 vehicles, including up to seven main battle tanks. The ships can carry two landing craft, personnel (LCPs) (Storebro SB90E), two rigid hull inflatable boats and two AW-101 helicopters. For political reasons, the ships were originally launched as "Flexible support ships" to avoid antagonising Russia after the end of the Cold War.[51] On the 16 October 2020, both ships were reclassed as anti-submarine warfare-frigates.

External links

Notes and References

  1. Gone But Not Forgotten . U.S. Naval Institute . Naval History Magazine . J. M. . Caiella . 33 . 5 . October 2019 . 20 December 2022.
  2. Amphibious Evolution . U.S. Naval Institute . Naval History Magazine . Kyle . Mizokami . November 2020 . 146 . 20 December 2022.
  3. Suez, 1956—A Successful Naval Operation Compromised by Inept Political Leadership . Michael H. Coles . Naval War College Review . 59 . Number 4 Autumn . 8 . 2006 . PDF . 20 December 2022.
  4. Web site: HMS Ocean on the Thames for the Olympics . Ministry of Defence (UK) . 21 December 2011 . 20 December 2022.
  5. Web site: HMAS Kanimbla (II) . Royal Australian Navy . 20 December 2022.
  6. Web site: INS Jalashwa brings back nearly 700 stranded Indians from Male . Business Standard . 7 June 2020. 20 December 2022.
  7. Web site: USS Iwo Jima LPH-2 - History . USS Iwo Jima Class Association . 20 December 2022.
  8. Web site: LHD 7 - USS Iwo Jima . Seaforces.org . 20 December 2022.
  9. Web site: Joint Support Ship. National Defence and the Canadian Armed Forces . 13 March 2013 . 27 February 2018.
  10. Web site: The Dutch JSS Multi-Purpose Support Ship. Defense Industry Daily. 27 February 2018.
  11. Web site: Karel Doorman klasse JSS. Dutch . marineschepen.nl . 27 February 2018.
  12. Web site: Joint Support Ship: New and Replace Existing Systems . National Defence and the Canadian Armed Forces . 12 March 2015 . 27 February 2018.
  13. Web site: Joint logistic Support Ship (JSS) . Dutch . Dutch Ministry of Defence . 4 November 2013 . 27 February 2018.
  14. Web site: Joint Support Ship (JSS). globalsecurity.org. 2019-01-21.
  15. Web site: Canadas C$2.9B Joint Support Ship#8221; Project, Take 3 . Defense Industry Daily. 2019-01-21.
  16. Web site: Joint Support Ships to be renamed Protecteur and Preserver. Government of Canada . 26 September 2017 . navy-marine.forces.gc.ca. 22 January 2019.
  17. Web site: Joint Support Ship cost up by $1.1 billion – taxpayers will now spend $3.4 billion on project . Pugliese . David . 2018-06-05 . en. 2019-01-21.
  18. Web site: Joint support ships - Large vessel shipbuilding projects – Shipbuilding projects to equip the Royal Canadian Navy and the Canadian Coast Guard – National Shipbuilding Strategy – Sea – Defence and marine procurement – Buying and Selling – PSPC. 3 May 2019.
  19. Web site: New shipbuilding delay leaves Canada reliant on allies, civilian ship to supply navy . 30 June 2022 .
  20. The Royal Netherlands Navy's JSS Karel Doorman . U.S. Naval Institute . Proceedings . Eric Wertheim . 148 . April 2022 . 20 December 2022.
  21. Web site: EU delivers aid to Ebola-hit countries . DW . Julius Kanubah . 1 May 2015 . 20 December 2022.
  22. Web site: Germany and the Netherlands sign Joint Support Ship LOI . 5 February 2016. Naval Today. 21 July 2018.
  23. Web site: 2020 Force Structure Plan . Department of Defence (Australia) . 1 July 2020 . 20 December 2022.
  24. Web site: 2020 Defence Strategic Update . Department of Defence (Australia) . 1 July 2020 . 20 December 2022.
  25. Web site: PACIFIC 2019: Navantia Australia Unveils Joint Support Ship Design . Naval News . Xavier . Vavasseur . 13 October 2019 . 20 December 2022.
  26. Web site: New Details Emerge On Australia's Future Joint Support Ship . Naval News . Benjamin . Felton . 13 May 2022 . 20 December 2022.
  27. Web site: Spanish naval giant Navantia eyes expansion in Western Australia . The Australian . Gregor . Ferguson . 21 May 2021 . 20 December 2022.
  28. Web site: Joint Support Ship - Taktische Konzept Mehrzweckschiff (TKM) - Einsatz Truppenunterstützungsschiff (ETrUS) . Global Security . 20 December 2022.
  29. Web site: Zielvorstellung Marine 2025+ . Navy Objective 2025+ . Inspekteur der Marine (Inspector of the Navy, Germany) . German . 6 November 2008 . 20 December 2022.
  30. Web site: Multi-Role Support Ship (MRSS) . GlobalSecurity.org . 20 December 2022.
  31. Web site: India Issues RFI For The Procurement Of Four LPD Amphibious Vessels . Naval News . Martin Manaranche . 25 August 2021 . 20 December 2022.
  32. Web site: MRSS acquisition should be expedited, says Navy . The Edge . 30 November 2022 . 20 December 2022.
  33. Web site: DSA 2022: HHI Unveils HDL-13000 Design For Royal Malaysian Navy MRSS . Naval news . Xavier Vavasseur . 29 March 2022 . 20 December 2022.
  34. Web site: Blue Ridge Class Amphibious Command Ship . Military.com . 20 December 2022.
  35. Web site: Returning to Readiness: USS Blue Ridge Marks Major Maintenance Milestone . United States Navy (Commander, U.S. 7th Fleet) . USS Blue Ridge (LCC 19) Public Affairs . 30 April 2018 . 20 December 2022.
  36. Web site: US Marines warn against Navy's FY24 decommission plans . Defense News . Megan Eckstein . 4 October 2022 . 20 December 2022.
  37. Web site: Amphibious Transport Dock - LPD . United States Navy . 21 January 2021 . 20 December 2022.
  38. Web site: U.S. Navy Landing Platform Docks (LPD) . Ingalls Shipbuilding . 20 December 2022.
  39. Web site: Modular 'Trucks' Will Rule The Waves: CNO . Breaking Defense . Sydney J. . Freedberg Jr. . 18 April 2012 . 20 December 2022.
  40. Web site: HII Pitching BMD Role For LPD-17 Hull . Defense Daily . Mike . McCarthy . 21 January 2019 . 20 December 2022.
  41. Web site: RQ-21A Blackjack Small Tactical Unmanned Air System (STUAS) . Naval technology . 14 February 2014 . 20 December 2022.
  42. Web site: USS San Diego (LPD 22) Alligator Dagger Exercise RQ-21A Launch . U.S. Central Command . 6 September 2017 . 20 December 2022.
  43. Martin UAV tests its V-Bat VTOL unmanned aerial vehicle from US Navy USS Portland LPD . Navy Recognition . Naval News . April 2021 . 18 April 2021 . 20 December 2022.
  44. Web site: Navy Wants to Invest In Amphibious Ship Upgrades, But Funding, Timing Still Unclear . USNI News . Megan Eckstein . 13 May 2019 . 20 December 2022.
  45. Web site: US Navy seeks to end San Antonio-class ship production, reducing fleet by 8 amphibious hulls . Defense News . Megan . Eckstein . 29 March 2022 . 20 December 2022.
  46. Web site: US Navy's next-gen naval warfighter is a multi-billion dollar failure . TRT World . 14 April 2021 . 20 December 2022.
  47. Web site: Navy Next-Generation Logistics Ship (NGLS) program: Background and Issues for Congress . Congressional Research Service . 26 July 2022 . 2 December 2022.
  48. Web site: Austal USA To Design U.S. Navy's Next Generation Logistics Ship NGLS . Naval News . Xavier . Vavasseur . 21 December 2021 . 20 December 2022.
  49. Web site: HDMS Absalon and HDMS Esbern Snare - Royal Danish Navy. Navy Recognition. 12 December 2016.
  50. Web site: Absalon Class Flexible Support Ship / Command Support Ship. John. Pike. globalsecurity.org. 12 December 2016.
  51. Web site: Med malerpensler har Søværnet slettet et 20 år gammelt 'underligt' ord. https://web.archive.org/web/20201026170031/https://www.dr.dk/nyheder/politik/med-malerpensler-har-soevaernet-slettet-et-20-aar-gammelt-underligt-ord. 2020-10-26. 17 October 2020.