Electricity sector in India explained

Country:India
Coverage:99.94% (31 March 2019)
Capacity:441,969 MW[1]
Production:1,948.956 TWh
Productionyear:FY2024
Greenhouse:2,309.98 million metric tons of CO2[2]
Greenhouseyear:2018
Use:1,395 kWh per capita
Useyear:FY2024
Tdlosses:17.68%
Tdlossesyear:FY2022-23
Residential:25.77%
Residentialyear:FY2022
Industrial:41.16%
Industrialyear:FY2022
Agriculture:17.67%
Agricultureyear:FY2022
Commercial:8.29%
Commercialyear:FY2022
Traction:1.53%
Tractionyear:FY2022
Rtariff:[3]
Rtariffyear:Dec. 2020
Ctariffyear:Dec. 2020
Privategen:33.46% (FY2020)
Policy:Ministry of Power
Renewableenergy:Ministry of New and Renewable Energy
Environment:Ministry of Environment, Forest and Climate Change
Law:Electricity Act, 2003

India is the third largest producer of electricity in the world.[4] During the fiscal year (FY) 2023–24, the total electricity generation in the country was 1,949 TWh, of which 1,734 TWh was generated by utilities.

The gross electricity generation per capita in FY2023-24 was 1,395 kWh. In FY2015, electric energy consumption in agriculture was recorded as being the highest (17.89%) worldwide.[5] The per capita electricity consumption is low compared to most other countries despite India having a low electricity tariff.[6]

The Indian national electric grid has an installed capacity of 442.0 GW as of 31 March 2024.[7] Renewable energy plants, which also include large hydroelectric power plants, constitute 43% of the total installed capacity.

India’s electricity generation is more carbon-intensive (713 grams CO2 per kWh) than the global average (480 gCO2/kWh), with coal accounting for three quarters of generation in 2023.[8] [9] [10] [11]

The government declared its efforts to increase investment in renewable energy. Under the government's 2023-2027 National Electricity Plan, India will not build any new fossil fuel power plants in the utility sector, aside from those currently under construction.[12] [13] It is expected that non-fossil fuel generation contribution is likely to reach around 44.7% of the total gross electricity generation by 2029–30.[14]

History

The first demonstration of electric light in Calcutta (now Kolkata) was conducted on 24 July 1879 by P.W. Fleury & Co. On 7 January 1897, Kilburn & Co secured the Calcutta electric lighting license as agents of the Indian Electric Co, which was registered in London on 15 January 1897. A month later, the company was renamed the Calcutta Electric Supply Corporation. The control of the company was transferred from London to Calcutta only in 1970. The introduction of electricity in Calcutta was a success, and power was next introduced in Bombay (now Mumbai).[15] The first electric lighting demonstration in Mumbai was in 1882 at Crawford Market and the Bombay Electric Supply & Tramways Company (BEST) set up a generating station in 1905 to provide electricity for the tramway.[16]

The first hydroelectric installation in India was installed near a tea estate at Sidrapong for the Darjeeling Municipality in 1897.[17] The first electric street light in Asia was lit on 5 August 1905 in Bangalore.[18] The first electric train in the country ran on the Harbour Line between Bombay's Chhatrapati Shivaji Maharaj Terminus (then Victoria Terminus) and Kurla on 3 February 1925.[19] The first high-voltage laboratory of India was established at the Government Engineering College, Jabalpur in 1947.[20] On 18 August 2015, Cochin International Airport became the world's first fully solar powered airport with the inauguration of a dedicated solar plant (see CIAL Solar Power Project).[21] [22]

India began using grid management on a regional basis in the 1960s. Individual State grids were interconnected to form 5 regional grids covering mainland India, the Northern, Eastern, Western, North Eastern and Southern Grids. These regional links were established to enable transmission of surplus electricity between states in each region. In the 1990s, the Indian government began planning for a national grid. Regional grids were initially interconnected by asynchronous high-voltage direct current (HVDC) back-to-back links facilitating the limited exchange of regulated power. The links were subsequently upgraded to high capacity synchronous links.

The first interconnection of regional grids was established in October 1991 when the North Eastern and Eastern grids were interconnected. The Western Grid was interconnected with these grids in March 2003. The Northern grid was also interconnected in August 2006, forming a Central Grid that was synchronously connected and operating at one frequency. The sole remaining regional grid, the Southern Grid, was synchronously interconnected to the Central Grid on 31 December 2013 with the commissioning of the 765 kV Raichur-Solapur transmission line, establishing the National Grid.[23] [24]

By the end of the calendar year 2015, despite poor hydroelectricity generation, India had become a power surplus nation with huge power generation capacity idling for want of demand.[25] The calendar year 2016 started with steep falls in the international price of energy commodities such as coal, diesel oil, naphtha, bunker fuel, and liquefied natural gas (LNG), which are used in electricity generation in India.[26] [27] [28] [29] [30] As a result of the global glut in petroleum products, these fuels became cheap enough to compete with pit head coal-based power generators.[31] Coal prices have also fallen.[32] Low demand for coal has led to coal stocks building up at power stations as well as coal mines.[33] New installations of renewable energy in India surpassed installations of fossil fuel for the first time in 2016–17.[34]

On 29 March 2017, the Central Electricity Authority (CEA) stated that for the first time India has become a net exporter of electricity. India exported 5,798 GWh to neighboring countries, against a total import of 5,585 GWh.

The Government of India launched a program called "Power for All" in 2016.[35] The program was accomplished by December 2018 in providing the necessary infrastructure to ensure uninterrupted electricity supply to all households, industries, and commercial establishments.[36] Funding was made through a collaboration between the Government of India and its constituent states.[37] [38]

Installed capacity

The total installed power generation capacity is the sum of utility capacity, captive power capacity, and other non-utilities which is 495.200 GW as on 31 March 2023.

Utility power

Installed Capacity
as on! colspan="4"
Thermal (MW)Nuclear
(MW)
Renewable (MW)data-sort- type="numeric" rowspan="2" style="background:#dfd;"Total (MW)data-sort-type="numeric" rowspan="2"% Growth
(on yearly basis)
data-sort-type="numeric"Coal data-sort-type="numeric"Gas data-sort-type="numeric"Diesel data-sort- type="numeric" style="background:#ddf;"Sub-Total
Thermal
data-sort-type="numeric"Hydro data-sort-type="numeric"Other
Renewable
data-sort- type="numeric" style="background:#ddf;"Sub-Total
Renewable
align=left 31 December 1947 756 style="text-align:center;"- 98 854 style="text-align:center;"- 508 style="text-align:center;"- 508 1,362 style="text-align:center;"-
align=left 31 December 1950 1,004 style="text-align:center;"- 149 1,153 style="text-align:center;"- 560 style="text-align:center;"- 560 1,713 8.59%
align=left 31 March 1956 1,597 style="text-align:center;"- 228 1,825 style="text-align:center;"- 1,061 style="text-align:center;"- 1,061 2,886 13.04%
align=left 31 March 1961 2,436 style="text-align:center;"- 300 2,736 style="text-align:center;"- 1,917 style="text-align:center;"- 1,917 4,653 12.25%
align=left 31 March 1966 4,417 137 352 4,903 style="text-align:center;"- 4,124 style="text-align:center;"- 4,124 9,027 18.80%
align=left 31 March 1974 8,652 165 241 9,058 640 6,966 style="text-align:center;"- 6,966 16,664 10.58%
align=left 31 March 1979 14,875 168 164 15,207 640 10,833 style="text-align:center;"- 10,833 26,680 12.02%
align=left 31 March 1985 26,311 542 177 27,030 1,095 14,460 style="text-align:center;"- 14,460 42,585 9.94%
align=left 31 March 1990 41,236 2,343 165 43,764 1,565 18,307 style="text-align:center;"- 18,307 63,636 9.89%
align=left 31 March 1997 54,154 6,562 294 61,010 2,225 21,658 902 22,560 85,795 4.94%
align=left 31 March 2002 62,131 11,163 1,135 74,429 2,720 26,269 1,628 27,897 105,046 4.49%
align=left 31 March 2007 71,121 13,692 1,202 86,015 3,900 34,654 7,760 42,414 132,329 5.19%
align=left 31 March 2012 112,022 18,381 1,200 131,603 4,780 38,990 24,503 63,493 199,877 9.00%
align=left 31 March 2014 145,273 21,782 1,200 168,255 4,780 40,532 31,692 72,224 245,259 10.77%
align=left 31 March 2017 192,163 25,329 838 218,3306,780 44,478 57,260 101,138 326,841 10.31%
align=left 31 March 2018 197,171 24,897 838 222,9066,780 45,293 69,022 114,315 344,002 5.25%
align=left 31 March 2019 200,704 24,937 637 226,2796,780 45,399 77,641 123,040 356,100 3.52%
align=left 31 March 2020[39] 205,135 24,955 510 230,6006,780 45,699 87,028 132,427 370,106 3.93%
align=left 31 March 2021[40] 209,294 24,924 510 234,7286,780 46,209 94,433 140,642 382,151 3.25%
align=left 31 March 2022 210,700 24,899 510 236,1096,780 46,723 109,885 156,607 399,497 4.53%
align=left 31 March 2023 211,855 24,824 589 237,2696,780 46,850 125,160 172,010 416,059 4.15%
align=left 31 March 2024 217,589 25,038 589 243,2178,180 46,928 143,645 190,573 441,970 6.23%
Nearly 32,285 MW coal thermal power projects are under construction as on 1 April 2021.[41]

The total installed utility power generation capacity as on 31 March 2023 by type is given below.[1]

Breakdown of Installed Generation Capacity as on 31/03/2023!Source!Installed Capacity (MW)!% of Share in Total
Fossil Fuels (Total)237,26957%
Coal 205,23549.3%
Lignite 6,6201.6%
Gas24,8246.0%
Diesel5890.1%
Non-Fossil Fuels (Total)178,79043%
Hydro46,85011.3%
Wind 42,63310.2%
Solar66,78016.1%
Bio Mass Power/Cogen10,2482.5%
Waste to Energy5540.1%
Small Hydro4,9441.2%
Nuclear6,7801.6%
Total Installed Capacity 416,059100%
Hydroelectric power plants with ≤ 25 MW generation capacity are included in Renewable category (classified as SHP – Small Hydro Project)

Captive power

The installed captive power generation capacity (above 0.5 MW capacity) associated with industry-owned plants is 79,340 MW as of 31 March 2024. In the fiscal year 2023–24, captive power generation was 214,581 GWh.[42] Diesel power generation sets of 75,000 MW capacity (excluding sets of size above 1 MW and below 100 kVA) are also installed in the country.[43] In addition, there are a large number of diesel generators of capacity less than 100 kVA to cater to emergency power needs during power outages in all sectors.[44]

Captive Power Sector, FY 2023–24
Source Captive Power Capacity (MW) Share Electricity generated (GWh) Share
Coal 46,900 59.11%180,500 84.12%
Hydroelectricity 140 0.18%341 0.09%
Renewable energy source 7,500 9.45%10,0804.70%
Natural Gas6,500 8.19%21,500 10.02%
Oil 18,300 23.07%2,1501.00%
Total 79,340 100.00% 214,581 100.00%

The major states leading in captive power generation are Odisha, Gujarat, Chhattisgarh, Karnataka, Uttar Pradesh and Rajasthan which are producing nearly 66% of the total.

State Wise Captive Power, FY 2021–22[45]
State Captive Power Capacity (MW) Electricity generated (GWh)
Odisha 12,171 62,587
Gujarat 7,061 19,413
Chhattisgarh 5,787 21,487
Karnataka6,613 15,169
Uttar Pradesh 4,779 13,957
Rajasthan 3,161 11,585
India 76,733 209,311

Installed capacity by state or territory

See main article: States of India by installed power capacity.

State/Union Territory!! colspan="5"
Thermal (in MW)Nuclear
(in MW)
Renewable (in MW)Total
(in MW)
% of National Total% Renewable
Coal Lignite Gas Diesel Sub-Total
Thermal
Hydel Other
Renewable
Sub-Total
Renewable
Western Region 84236 1400 10806.49 - 96442.49 2540 7392 42755.33 50147.33 149129.82 35.04%33.63%
14692 1400 7551.41 align="center"- 23643.41 1140 1990 21792.75 23782.75 48566.16 11.41%48.97%
23856 align="center"- 3207.08 align="center"- 27063.08 1400 3047 13241.26 16288.26 44751.34 10.52%36.40%
22000 align="center"- align="center"- align="center"- 22000 align="center"- 2235 6270.86 8505.86 30505.86 7.17%27.88%
23688 align="center"- align="center"- align="center"- 23688 align="center"- 120 1366.24 1486.24 25174.24 5.92%5.90%
align="center"- align="center"- 48 align="center"- 48 align="center"- align="center"- 37.75 37.75 85.75 0.02%44.02%
align="center"- align="center"- align="center"- align="center"- style="background-color: #ddf;" align="center"- align="center"- align="center"- 46.47 46.47 46.47 0.01%100%
Southern Region 40557.50 3640 6491.80 460.49 51149.80 3320 11747.15 52331.17 64078.32 118548.12 27.86%54.05%
10045 3640 1027.18 211.70 14923.88 2440 2178.20 18706.32 20884.52 38248.40 8.99%54.60%
9480 align="center"- align="center"- 25.20 9505.20 880 3689.20 17848.74 21537.94 31923.14 7.50%67.47%
12390 align="center"- 4898.54 36.80 17325.34 align="center"- 1610 9381.55 10991.55 28316.89 6.65%38.82%
8642.50 align="center"- align="center"- align="center"- 8642.50 align="center"- 2405.60 5152.32 7557.92 16200.42 3.81%46.65%
align="center"- align="center"- 533.58 159.96 693.54 align="center"- 1864.15 1194.20 3058.35 3751.89 0.88%81.51%
align="center"- align="center"- 32.50 align="center"- 32.50 align="center"- align="center"- 43.27 43.27 75.77 0.02%57.11%
align="center"- align="center"- align="center"- 26.83 26.83 align="center"- align="center"- 4.77 4.77 31.60 0.01%15.09%
Northern Region 44285 1580 5994.96 - 51859.96 1620 19696.27 34540.29 54236.56 107716.52 25.31%50.35%
92001580 1022.83 align="center"- 11802.83 1180 411 23431.56 23842.56 36825.39 8.65%64.74%
24075 align="center"- 1493.14 align="center"- 25568.14 440 501.60 4901.27 5402.87 31411.01 7.38%17.20%
align="center"- align="center"- align="center"- align="center"- style="background-color: #ddf;" align="center"- align="center"- 10263.02 1091.46 11354.48 11354.482.67%100%
5680 align="center"- align="center"- align="center"- 5680 align="center"- 1096.30 1970.50 3066.80 8746.80 2.05%35.06%
5330 align="center"- 431.59 align="center"- 5761.59 align="center"- align="center"- 1561.75 1561.75 7323.34 1.72%21.32%
align="center"- align="center"- 664 align="center"- 664 align="center"- 3975.35 934.09 4909.44 5573.44 1.31%88.09%
align="center"- align="center"- 175 align="center"- 175 align="center"- 3360 216.41 3576.41 3751.41 0.88%95.33%
align="center"- align="center"- 2208.40 align="center"- 2208.40 align="center"- align="center"- 320.41320.412528.81 0.59%12.67%
align="center"- align="center"- align="center"- align="center"- style="background-color: #ddf;" align="center"- align="center"- 89 48.79137.79 137.79 0.03%100%
align="center"- align="center"- align="center"- align="center"- style="background-color: #ddf;" align="center"- align="center"- align="center"- 64.05 64.05 64.05 0.01%100%
Eastern Region 36997 - 80 92.71 37169.71 - 5987.75 1931.24 7918.99 45088.70 10.59%17.56%
13487 align="center"- 80 align="center"- 13567 align="center"- 1341.20 636.02 1977.22 15544.22 3.65%12.72%
9540 align="center"- align="center"- align="center"- 9540 align="center"- 2154.55 640.08 2794.63 12334.63 2.90%22.66%
9060align="center"- align="center" - align="center"- 9060align="center" - align="center" - 420.26 420.26 9480.262.23%4.43%
4910align="center"- align="center"- align="center"- 4910 align="center"- 210 139.92 349.92 5259.92 1.24%6.65%
align="center"- align="center"- align="center"- align="center"- style="background-color: #ddf;" align="center"- align="center"- 228259.80 2341.80 2341.80 0.55%100%
align="center"- align="center"- align="center"- 92.71 92.71 align="center"- align="center"- 35.16 35.16 127.870.03%27.50%
North-Eastern Region 750 - 1664.95 36 2450.95 - 2027 574.41 2601.41 5052.36 1.19%51.49%
750 align="center"- 597.36align="center"- 1347.36 align="center"- 350 191.92 541.92 1889.28 0.44%28.68%
align="center"- align="center"- align="center"- align="center"- style="background-color: #ddf;" align="center"- align="center"- 1115 144.90 1259.90 1259.90 0.30%100%
align="center"- align="center"- 1067.60 align="center"- 1067.60 align="center"- align="center"- 34.48 34.48 1102.08 0.26%3.13%
align="center"- align="center"- align="center"- align="center"- style="background-color: #ddf;" align="center"- align="center"- 322 73.02 395.02 395.02 0.1%100%
align="center"- align="center"- align="center"- 36 36 align="center"- 105 18.48 123.48 159.48 0.04%77.43%
align="center"- align="center"- align="center"- align="center"- style="background-color: #ddf;" align="center"- align="center"- 60 75.90 135.90 135.90 0.03%100%
align="center"- align="center"- align="center"- align="center"- style="background-color: #ddf;" align="center"- align="center"- 75 35.71 110.71 110.71 0.03%100%
Total 206825.50 6620 25038.21 589.20 239072.91 7480 46850.17 132132.44 178982.61 425535.52 100.00%42.06%
Other Renewable Energy sources include SHP (Small Hydro Power - hydel plants ≤ 25 MW), Biomass Power, Urban & Industrial waste, Solar and Wind Energy

Demand

Demand trend

The draft national electricity plan 2022 prepared by CEA says that the peak demand and energy demand would be 272 GW and 1,852 billion kWh (excluding rooftop solar generation) respectively in the fiscal year 2026–27.[46] The peak demand and energy demand would be 363 GW and 2,459 billion kWh (excluding rooftop solar generation) respectively in the fiscal year 2031–32. From the calendar year 2015 onwards, power generation in India has been less of a problem than power distribution.[47] [48] [49] [50] [51]

Demand drivers

Nearly 0.07% of Indian households (0.2 million) have no access to electricity. The International Energy Agency estimates India will add between 600 GW to 1,200 GW of additional new power generation capacity before 2050.[52] This added new capacity is similar in scale to the 740 GW total power generation capacity of the European Union (EU-27) in 2005. The technologies and fuel sources India adopts as it adds this electricity generation capacity may have a significant impact on global resource usage and environmental issues.[53] The demand for electricity for cooling (HVAC) is projected to grow rapidly.[54]

According to the analysis presented in the India Cooling Action Plan (ICAP) released by the Ministry of Environment, Forests and Climate Change, only 8 percent of Indian households own air-conditioning units. The cooling demand across India is projected to rise at a rate of 15-20 percent annually and aggregated cooling demand will grow to around eight times by 2037–38, as compared to the 2017-18 baseline. In India, 45 percent of the country's peak electricity demand in 2050 is expected to come from space cooling alone.[55]

About 136 million Indians (11%) use traditional fuels – firewood, agricultural waste and dry animal dung fuel – for cooking and general heating needs.[56] These traditional fuels are burnt in cook stoves, sometimes known as chulah or chulha.[57] Traditional fuel is an inefficient source of energy, and its burning releases high levels of smoke, PM10 particulate matter,,, PAHs, polyaromatics, formaldehyde, carbon monoxide and other air pollutants, affecting outdoor air quality, haze and smog, chronic health problems, damage to forests, ecosystems and global climate.[58] [59] [60] The World Health Organization estimates that 300,000 to 400,000 people in India die of indoor air pollution and carbon monoxide poisoning every year because of biomass burning and use of chulahs.[61] Burning traditional fuel in conventional cook stoves is estimated to release 5–15x more pollutants than industrial combustion of coal, and is unlikely to be replaced until electricity or clean-burning fuel and combustion technologies become reliably available and widely adopted in rural and urban India. The growth of the electricity sector in India may help find a sustainable alternative to traditional fuel burning.

In addition to air pollution problems, a 2007 study finds that discharge of untreated sewage is the single most important cause for pollution of surface and groundwater in India. The majority of government-owned sewage treatment plants remain closed most of the time in part because of the lack of a reliable electricity supply to operate the plants. Uncollected waste accumulates in urban areas, causing unhygienic conditions, and release heavy metals and pollutants that leaches to surface and groundwater.[62] [63] A reliable supply of electricity is required to address India's water pollution and associated environmental issues.

The per capita annual domestic electricity consumption in India during the year 2009 was 96 kWh in rural areas and 288 kWh in urban areas for those with access to electricity. Globally the per capita annual average is 2,600 kWh and in the European Union it is 6,200 kWh.[64]

Adding to it, the recent coal crisis has raised an alarm as over 60 per cent of the electricity produced in the country is derived from thermal power plants, and thus, depend on coal.[65]

In 2021, electricity consumption in India was dominated by the industrial sector at 43.9%. The residential sector used 25.3%, agriculture and forestry 19.0%, and commercial and public services 6.6%. Transport had the lowest share at 1.6%.

Year*! rowspan="2"
Mid-year
population
(millions)[66]
Net consumption
(GWh)
% of TotalGross
per-capita generation
(in kWh)
Domestic Commercial Industrial Traction Agriculture Misc
1947** 3304,182 10.11% 4.26% 70.78% 6.62% 2.99% 5.24% 16.3
1950** 3765,610 9.36% 5.51% 72.32% 5.49% 2.89% 4.44% 18.2
1956 41710,150 9.20% 5.38% 74.03% 3.99% 3.11% 4.29% 30.9
1961 45816,804 8.88% 5.05% 74.67% 2.70% 4.96% 3.75% 45.9
1966 50830,455 7.73% 5.42% 74.19% 3.47% 6.21% 2.97% 73.9
1974 60755,557 8.36% 5.38% 68.02% 2.76% 11.36% 4.13% 126.2
1979 68184,005 9.02% 5.15% 64.81% 2.60% 14.32% 4.10% 171.6
1985 781124,569 12.45% 5.57% 59.02% 2.31% 16.83% 3.83% 228.7
1990 870195,098 15.16% 4.89% 51.45% 2.09% 22.58% 3.83% 329.2
1997 997315,294 17.53% 5.56% 44.17% 2.09% 26.65% 4.01% 464.6
2002 1089374,670 21.27% 6.44% 42.57% 2.16% 21.80% 5.75% 671.9
2007 1179525,672 21.12% 7.65% 45.89% 2.05% 18.84% 4.45% 559.2
2012 1,220785,194 22.00% 8.00% 45.00% 2.00% 18.00% 5.00% 883.6
2013 1,236 824,301 22.29% 8.83% 44.40% 1.71% 17.89% 4.88% 914.4
2014 1,252 881,562 22.95% 8.80% 43.17% 1.75% 18.19% 5.14% 957
2015 1,267 938,823 23.53% 8.77% 42.10% 1.79% 18.45% 5.37% 1010
2016 1,284 1,001,191 23.86% 8.59% 42.30% 1.66% 17.30% 6.29% 1075
20171,299 1,066,268 24.32% 9.22% 40.01% 1.61% 18.33% 6.50% 1122
2018 1,313 1,130,244 24.20% 8.51% 41.48% 1.27% 18.08% 6.47% 1149
2019 1,328 1,196,309 24.76% 8.24% 41.16% 1.52% 17.69% 6.63% 1181
2020 1,342 1,291,494 24.01% 8.04% 42.69% 1.52% 17.67% 6.07% 1208
2021 1,356 1,227,000 25.67% 8.31% 41.09% 1.51% 17.52% 5.89% 1177
2022 1,3701,296,300 25.77% 8.29% 41.16% 1.53% 17.67% 5.59% 1255
2023 1,3751,403,400 25.79% 7.49% 42.40% 1.78% 17.16% 5.38% 1331
2024 1,3971,543,000 24.30% 8.10% 41.80% 2.14% 16.53% 7.13% 1395
* Data from the fiscal year ending on 31 March of each year.
** Refers to the fiscal year ending on 31 December.

Note: Gross per-capita generation=(gross electricity generation by all sources plus net import) / mid-year population. 'Consumption' is 'gross electricity generation by all sources plus net import' after subtracting transmission losses and auxiliary consumption in electricity generation.

Rural and Urban electrification

See also: Saubhagya scheme and Rural Electrification Corporation Limited.

India's Ministry of Power launched Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) as one of its flagship programs in July 2015 with the objective of providing round-the-clock power to rural areas. The program focused on reforms in the rural power sector by separating feeder lines for rural households from those for agricultural applications and strengthening transmission and distribution infrastructure. A previous scheme for rural electrification, Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) was subsumed into the new scheme.[67] As of 28 April 2018, 12 days ahead of the target date, all Indian villages (a total of 597,464 census villages) were electrified.[68]

India has also achieved close to 100% electrification of all rural and urban households. As of 4 January 2019, 211.88 million rural households were provided with electricity, close to 100% of the 212.65 million total rural households.[69] As of 4 January 2019, 42.937 million urban households are provided with electricity, close to 100% of the 42.941 million total urban households.

Per-Capita consumption

Electricity consumption per capita in 2021–2022[70] [71] [72] ! State/Union territory ! Population
(Millions)
! Total
Consumers
(Millions)! Total
Connected
Load (MW)! Per-capita
consumption
(kWh) ! Total
sales
(TWh)! Domestic
sales
(TWh)! Industrial HV
sales
(TWh)! Industrial MV
& LV sales
(TWh)! Agriculture
sales
(TWh)! Commercial
sales
(TWh)
0.640.081,58412,250 6.4
0.50.06806 5,9142.13
1.560.663,1123,7364.02
Gujarat70.2919.2368,994 2,239124.87 16.51 41.12 14.60 13.79 4.31
29.696.0310,3012,21143.96 6.44 7.51 0.60 5.93 1.41
125.0133.0794,3361,588149.45 30.19 34.15 9.88 36.25 9.54
85.1217.2431,4911,23270.86 16.79 9.24 1.29 26.52 3.37
Western Region 312.8076.39210,6571,736401.75 71.49 100.49 26.87 82.53 19.15
Puducherry1.590.511,568 2,1382.85 0.81 1.51 0.16 0.06 0.21
Tamil Nadu76.5432.4587,144 1,714109.2433.97 35.61 9.89 13.43 10.33
Andhra Pradesh[73] 52.9020.0046,633 1,56771.05 18.19 23.43 3.11 14.11 4.54
37.8216.9941,7032,12665.6813.32 17.53 1.23 22.15 5.70
67.0928.8366,340 1,37673.1814.11 19.75 5.05 21.93 5.81
35.5713.8230,228 84425.1312.75 4.701.22 0.38 4.83
0.070.03938190.05
Southern Region271.57112.31273,713 1,548347.18 93.19 102.54 20.67 72.09 31.44
30.4510.1639,9182,35056.21 15.32 12.58 3.1312.57 3.46
29.707.3733,7132,18649.68 11.97 10.75 2.04 9.12 4.00
20.806.6621,5031,68427.62 16.43 0.47 2.34 0.03 5.31
7.422.658,3161,74210.33 2.35 4.68 0.08 0.08 0.51
11.472.757,876 1,52013.46 3.20 5.44 0.26 0.43 1.33
Chandigarh1.220.261,611 1,5291.41
Jammu and Kashmir13.762.194,099 1,47510.23 4.880.920.230.38 1.70
79.7915.9851,1481,34579.52 14.25 11.53 2.11 28.81 4.09
Uttar Pradesh232.3031.7768,284 663109.57 43.95 10.25 3.98 18.95 6.28
Northern Region 426.9079.82236,473 1,137358.09 113.09 56.76 14.32 70.39 27.06
44.119.8416,6002,26482.05 8.42 6.02 0.40 0.78 2.15
0.680.12290 1,0110.441
38.764.178,499 86730.27 6.47 11.83 0.30 0.17 1.03
98.4024.95296,15873355.11 17.53 15.58 2.14 1.22 5.45
Andaman and Nicobar0.400.01340 8780.27
124.1517.6521,66632926.55 15.04 2.76 0.80 1.14 2.39
Eastern Region 306.5156.8977,011807194.7047.74 36.45 3.683.33 11.12
1.540.242446450.51
3.300.591,2557511.54
1.220.275295820.66
Nagaland2.200.32205 4330.70
4.090.977804351.05
35.246.139,7373849.81 3.78 1.57 0.12 0.05 1.09
3.180.541,0883620.73
North Eastern Region50.789.0813,84042615.066.15 2.35 0.23 0.10 1.52
National 1,368.56334.51811,6941,255 1,316.76 339.78 479.83 76.65 228.51 97.12

Notes: Per capita consumption = (gross electricity generation + captive power generation + net import) / mid-year population.Nearly a 24% difference between sales and gross generation due to auxiliary power consumption of thermal power plants and transmission and distribution (T&D) losses, etc. Maximum peak load (MW) in a year is nearly 25% of the total connected load only.

Electricity generation

India has recorded rapid growth in electricity generation since 1985, increasing from 179 TW-hr in 1985 to 1,057 TW-hr in 2012.[74] The majority of the increase came from coal-fired plants and non-conventional renewable energy sources (RES), with the contribution from natural gas, oil, and hydro plants decreasing in 2012–2017. The gross utility electricity generation (excluding imports from Bhutan) was 1,484 billion kWh in 2021–22, representing 8.1% annual growth compared to 2020–2021. The contribution from renewable energy sources (including large hydro) was nearly 21.7% of the total. In 2019–20, all the incremental electricity generation is contributed by renewable energy sources as the power generation from fossil fuels decreased.[75] During the year 2020–2021, the utility power generation decreased by 0.8% (11.3 billion kWh) with a reduction in power generation from fossil fuels by 1% and power generation from non-fossil sources is more or less same of the previous year. In 2020–21, India exported more electricity than it imported from neighboring countries.[76] Solar power generation in 2020–21, occupied third place after coal and hydropower generations surpassing wind, gas and nuclear power generations.

In 2022–23, renewable power generation was 22.47% of total utility power generation when total utility power generation increased by 8.77% to 1614.70 billion kWh. In 2023-24, renewable electricity generation is nearly 20.76% due to lower contribution from hydropower stations.

Yearly gross electricity generation by source (GWh)
YearFossil FuelNuclearHydro*Sub
total
RES[77] Utility and Captive Power
CoalOilGasMini
hydro
SolarWindBio
mass
OtherSub
total
UtilityCaptive
(see Table above)
MiscTotal
2011–12612,497 2,649 93,281 32,286 130,511 871,224na na na na na 51,226 922,451134,387na 1,056,838
2012–13691,341 2,449 66,66432,866 113,720 907,040 na na na na na 57,449 964,489144,009na 1,108,498
2013–14746,087 1,868 44,522 34,228 134,847 961,552 na 3,350 na na na 59,615 1,021,167156,643na 1,177,810
2014–15835,838 1,407 41,075 36,102 129,244 1,043,666 8,0604,600 28,214 14,944 41461,780 1,105,446166,426 na 1,271,872
2015–16[78] 896,260 406 47,122 37,413 121,377 1,102,578 8,3557,450 28,604 16,681 26965,781 1,168,359183,611 na 1,351,970
2016–17[79] 944,861 275 49,094 37,916 122,313 1,154,523 7,673 12,086 46,011 14,159 21381,869 1,236,392197,000 na 1,433,392
2017–18[80] 986,591 386 50,208 38,346 126,123 1,201,653 5,056 25,871 52,666 15,252 358101,839 1,303,493 183,000 na 1,486,493
2018–191,021,997 129 49,886 37,706 135,040 1,244,758 8,703 39,268 62,036 16,325 425126,757 1,371,517 175,000 na 1,546,517
2019–20[81] 994,197 199 48,443 46,472 155,769 1,245,080 9,36650,103 64,639 13,843366138,337[82] 1,383,417 239,567 na 1,622,983
2020–21[83] 981,239 129 51,027 42,949 150,3051,225,649 10,258 60,402 60,150 14,8161621147,247[84] 1,373,187 224,827 na 1,598,014
2021–22[85] 1,078,444 115 36,143 47,019 151,6951,313,418 10,463 73,483 68,640 16,056 2,268170,912[86] 1,484,442209,311 na 1,693,753
2022–23[87] 1,182,096 320 23,885 45,861 162,0991,414,281 11,170102,014 71,814 16,024 2,529203,5321,617,813211,932na 1,829,745
2023–24[88] 1,294,071 401 31,301 47,817 133,9721,507,555 9,485 115,975 83,385 13,243 2,746 225,835[89] 1,734,375214,581na 1,948,956

Notes: Coal includes lignite; Misc: includes contributions from emergency diesel generator sets, rooftop solar, captive power generation from below 1 MW capacity plants, etc.; *Hydro includes pumped storage generation; na = data not available. The above data is excluding net imports from Bhutan.

Thermal power

In April 2024, India's electricity sector has seen a significant shift towards coal due to a shortfall in hydropower generation, driven by lower-than-expected rainfall. As reported by the Grid Controller of India Ltd. in April, coal's share in the total power generation mix increased to 77% in the first week of the month, compared to the previous year. This shift to coal is a strategic response to meet the rising electricity demands anticipated during the summer season and ahead of the upcoming elections. This is despite the fact that India's coal reserves were 34% higher than the previous year. The reliance on coal in the short term highlights the tension between India's energy security needs and its clean energy targets.[90]

Pollution from coal-based power plants

In India the Commercial Energy makes 74% of total energy, of which coal based energy production is around 72–75%, as per 2020 data. For utility power generation, India consumed 622.22 million tons of coal during 2019–20 which is less by 1% compared to 628.94 million tons during 2018–19. However coal imports for utility power generation increased by 12.3% during year 2019–20 at 69.22 million tons from 61.66 million tons during 2018–19.[91] A large part of the Indian coal reserve is similar to Gondwana coal: it is of low calorific value and high ash content, with poor fuel value. On average, Indian coal has a gross calorific value (GCV) of about 4500 Kcal/kg, whereas in Australia, for example, the GCV is about 6500 Kcal/kg .[92] The result is that Indian power plants using India's coal supply consume about 0.7 kg of coal per kWh of power generation, whereas in the United States thermal power plants consume about 0.45 kg of coal per kWh. In 2017, India imported nearly 130 Mtoe (nearly 200 million tons) of steam coal and coking coal, 29% of total consumption, to meet the demand in electricity, cement and steel production.[93] [94]

The Centre for Science and Environment has assessed the Indian coal-based power sector as one of the most resource-wasteful and polluting sectors in the world, in part due to the high ash content in India's coal.[95] India's Ministry of Environment and Forests has therefore mandated the use of coals whose ash content has been reduced to 34% (or lower) in power plants in urban, ecologically sensitive and other critically polluted areas. The coal ash reduction industry has grown rapidly in India, with current capacity topping 90 megatonnes.

Before a thermal power plant is approved for construction and commissioning in India it must undergo an extensive review process that includes environmental impact assessment.[96] The Ministry of Environment and Forests has produced a technical guidance manual to help project proposers avoid environmental pollution from thermal power plants.[97] As of 2016, the existing coal-fired power stations in the utility and captive power sectors were estimated to require nearly 12.5 million INR per MW capacity to install pollution control equipment to comply with the latest emission norms set out by the Ministry of Environment and Forests.[98] [99] [100] [101] Most of the coal fired stations have not complied installation of flue gas de-sulphurisation units for reducing the pollution.[102] In April 2020, CPCB declared that over 42,000 MW thermal power plants have outlived their lives.[103] India has also banned imports of pet coke for use as fuel.[104] As a signatory to the Paris Agreement, India is also reducing power generation from coal to control the emission of greenhouse gases.[105] The particulate, NOx and SOx emissions (excluding particulate emissions in the form of drift from wet cooling towers and mercury emissions from the flue stacks) of coal, oil and gas fired power stations in utility power sector (excluding captive power plants) are monitored regularly.[106]

The state and central power generation companies are permitted by the Government of India to minimize the cost of coal transportation using flexible coal linkage swaps from inefficient plants to efficient plants, and from plants situated far from coal mines to plants close to the pit head, leading to a reduction in the cost of power.[107] Although coal imports for consumption in the utility sector are declining, the overall imports of steam coal are increasing as the local coal production is unable to meet the requirements of coal-fired captive power plants.[108] [109] India is introducing single spot auctions/exchanges for all type of coal consumers.[110]

In 2021, the majority of CO2 emissions from power generation in India were produced by coal, accounting for 96.7% of the total. Natural gas was responsible for 2.6% of emissions, while oil contributed 0.5%.

Retirement of old thermal power plants

India's coal-fired, oil-fired and natural gas-fired thermal power plants are inefficient and replacing them with cheaper renewable technologies offers significant potential for greenhouse gas (CO2) emission reduction. India's thermal power plants emit 50% to 120% more CO2 per kWh produced compared to average emissions from their European Union (EU-27) counterparts.[111] The central government plans to retire coal-based plants that are at least 25 years old and contributing excessive pollution, totalling 11,000 MW of capacity.[112] As of 2018 there is no similar retirement plan for the captive power sector. In 2020 Carbon Tracker estimated that phasing out 20 years or more old coal-fired plants and the coal fired plants under construction with electricity sale price exceeding INR 4/kWh with new renewables is more economical as these coal fired plants are imposing heavy financial burden on Discoms.[113]

Some diesel generator plants and gas turbine plants were also decommissioned in 2016 though they are best suitable for catering ancillary services.[114]

Integration of renewable power

India has committed to install 275,000 MW renewable energy capacity by 2027.[115] The existing base load coal and gas based power plants need to be flexible enough to accommodate the variable renewable energy. Also ramping up, ramping down, warm start up, hot start up capabilities of existing coal based power stations are critical to accommodate the frequent variations in renewable power generation.[116] [117] It is also examined to use the retired coal based electric generators as synchronous condensers for improving the grid inertia when it is dominated by static power generation sources like solar and wind power.[118] As the solar power plants remain idle during the night hours, reactive power capability of the inverters installed as part of the solar power plant can also be used during the night time for solving the problem of very high voltage which occurs due to low loads on the transmission lines.[119] Wind and solar power plants are also capable to provide fast frequency response in ramping up falling grid frequency.[120] Grid-forming inverters can also restart a downed grid by providing black start power from inverter-based resources like solar, wind and batteries.[121]

Natural gas supply constraints

The installed capacity of natural gas-based power plants (including the plants ready to be commissioned with the commencement of natural gas supply) was nearly 26,765 MW at the end of the financial year 2014–15. These plants were operating at an overall plant load factor (PLF) of 22% due to a severe shortage of natural gas in the country,[122] and the fact that imported liquid natural gas (LNG) was too expensive for power generation. Many power stations were shut down throughout the year for a lack of natural gas supply.[123] The natural gas shortage for power sector alone was nearly 100 million cubic metre per day at standard conditions.[124] The break-even price for switching from imported coal to LNG in electricity generation was estimated to be approximately US6$/MMBtu (thermal energy).[125] The Indian government has taken steps to enhance power generation from gas-based power plants by waiving import duties and taxes.[126] [127]

Gasification of coal or lignite or pet coke or biomass produces synthesis gas or syngas (also known as coal gas or wood gas) which is a mixture of hydrogen, carbon monoxide and carbon dioxide gases.[128] Coal gas can be converted into synthetic natural gas by using the Fischer–Tropsch process at low pressure and high temperature. Coal gas can also be produced by underground coal gasification if the coal deposits are located deep in the ground or it is uneconomical to mine the coal.[129] Synthetic natural gas production technologies promise to dramatically improve India's supply of natural gas.[130] The Dankuni coal complex produces syngas that is piped to industrial users in Calcutta.[131] Many coal-based fertiliser plants can also be economically retrofitted to produce synthetic natural gas. It is estimated that the production cost for syngas could be below US6$/MMBtu.[132] [133]

Earlier, natural gas use in power generation was thought to be a bridge fuel as it emits far less CO2 (below 50%) when compared to coal use in power generation until renewable power generation without CO2 emissions become economical.[134] Renewable power generation is already cheaper than coal and gas fueled power generation in India. Now the bridge fuel concept is no more valid and existing gas-based generation needs to compete with the coal-based generation when there is no adequate renewable power generation (including storage and peaking type hydropower). The problem of stranded assets/capacity is more deep-rooted for gas-based power plants than that of the coal-based power plants as coal is far cheaper than natural gas in India.

Nuclear power

See main article: Nuclear power in India.

As of 31 March 2022, India had 6.78 GW of installed nuclear power generation capacity or nearly 1.7% of the total installed utility power generation capacity. Nuclear plants generated 47,063 million kWh at 79.24% PLF in 2021–22.[135]

India's nuclear power plant development began in 1964. India signed an agreement with General Electric (United States) for the construction and commissioning of two boiling water reactors at Tarapur. In 1967, this effort was placed under India's Department of Atomic Energy. In 1971, India set up its first pressurized heavy water reactors with Canadian collaboration in Rajasthan.

In 1987, India created the Nuclear Power Corporation of India Limited to commercialize nuclear power. The Nuclear Power Corporation of India is a public sector enterprise, wholly owned by the Government of India, under the administrative control of the Department of Atomic Energy. The state-owned company has ambitious plans to establish plants totalling to 63 GW generation capacity by 2032.[136]

India's nuclear power generation effort is subject to many safeguards and oversights. Its environmental management system is ISO-14001 certified, and it undergoes peer review by the World Association of Nuclear Operators, including a pre-start-up peer review. The Nuclear Power Corporation of India Limited commented in its annual report for 2011 that its biggest challenge is to address public and policymaker perceptions about the safety of nuclear power, particularly after the Fukushima Daiichi nuclear disaster in Japan.[137]

In 2011, India had 18 pressurized heavy water reactors in operation, with another four projects launched totaling 2.8 GW capacity. India is in the process of launching its first prototype fast breeder reactor using plutonium-based fuel obtained by reprocessing the spent fuel of first-stage reactors. The prototype reactor is located in Tamil Nadu and has a capacity of 500 MW.

India has nuclear power plants operating in the following states: Maharashtra, Gujarat, Rajasthan, Uttar Pradesh, Tamil Nadu and Karnataka. These reactors have an installed electricity generation capacity of between 100 MW and 1000 MW each. The Kudankulam nuclear power plant (KNPP) is the single largest nuclear power station in India. KNPP Unit 1 with a capacity of 1000 MWe was commissioned in July 2013, while Unit 2, also with a capacity of 1000 MWe, attained criticality in 2016. Two additional units are under construction.[138] The plant has suffered multiple shutdowns, leading to calls for an expert panel to investigate.[139] First 700 MWe PHWR unit under phase II of Kakrapar Atomic Power Station achieved first criticality in July 2020 and expected to begin commercial operation by December 2022.[140] [141]

In 2011, uranium was discovered in the Tummalapalle uranium mine, the country's largest uranium mine and possibly one of the world's largest. The reserves were estimated at 64,000 tonnes, and could be as large as 150,000 tonnes.[142] The mine began operation in 2012.[143]

India's share of nuclear power plant generation capacity is 1.2% of worldwide nuclear power production capacity, making it the 15th largest nuclear power producer. India aims to supply 9% of its electricity needs with nuclear power by 2032 and 25% by 2050. Jaitapur Nuclear Power Project, India's largest nuclear power plant project, is planned to be implemented in partnership with Électricité de France under an agreement signed on 10 March 2018.[144]

India's government is developing up to 62 additional nuclear reactors, mostly using thorium fuel, which it expects to be operational by 2025. It is the "only country in the world with a detailed, funded, government-approved plan" to focus on thorium-based nuclear power.[145]

Renewable energy

See main article: Renewable energy in India. On 12 August 2021, India's grid-connected electricity generation capacity reached 100 GW from non-conventional renewable technologies[39] [146] and 46.21 GW from conventional renewable power or major hydroelectric power plants. As of 12 August 2021, there are about 50 GW of projects under development, and 27 GW that are tendered and yet to be auctioned.[39] The firm and dispatchable renewable electricity (FDRE) tariff has fallen to 4.98 ₹/kWh (0.06 $/kWh) in August 2024 which is cheaper than the tariff of new pithead coal based power plants in India.

Capacity
(in MW)
46,162
82,637
5,005
10,355
591
Total non-conventional renewable Power 144,751

Hydro power

See main article: Hydroelectric power in India.

The hydro-electric power plants at Darjeeling and Shivanasamudra were among the first in Asia, and were established in 1898 and 1902 respectively.

India's potential for hydropower has been assessed to be about 125,570 MW at a 60% load factor.[147] India is ranked fourth globally by underutilized hydropower potential. The estimated amount of viable hydropower including off-the-stream pumped storage hydroelectric potential varies with improved technology and the cost of electricity generation from other sources. In addition, there is an estimated 6,740 MW of potential for small, mini, and micro-hydro generators and 56 sites for pumped storage schemes with an aggregate capacity of 94,000 MW have been identified.[148] [149] In 2020, the power tariff from Solar PV clubbed with pumped storage hydro have fallen below the coal-based power plant tariffs in offering base load and peak load power supply.[150] [151]

The installed hydropower capacity as of 31 March 2024 was 46,928 MW, approximately 10.7% of the total installed utility capacity.[7] Small, mini, and micro-hydro generators add another 5,005 MW capacity. The share of this sector operated by public companies is 97%.[152] Companies engaged in the development of hydroelectric power in India include the National Hydroelectric Power Corporation (NHPC), Northeast Electric Power Company (NEEPCO), Satluj Jal Vidyut Nigam (SJVNL), Tehri Hydro Development Corporation, and NTPC-Hydro.

Pumped storage schemes offer the potential for centralized peak power stations for load management in the electricity grid.[153] [154] They also produce secondary /seasonal power at no additional cost when rivers are flooding with excess water. Storing electricity by alternative systems such as batteries, compressed air storage systems, etc. is more costly than electricity production by standby generator. India has already established nearly 4,785 MW pumped storage capacity as part of its installed hydro power plants.[155] [156]

Hydropower is a low-carbon, renewable electricity source. However, its advantages are not limited to power generation. In fact, many of its other services are becoming increasingly important in the context of the energy transition and climate change. Hydropower plants offer a broad range of services to the grid that includes balancing and ancillary services. Additionally, hydropower can provide water services such as flood control, irrigation control, water distribution, recreational facilities, and wastewater control.[157]

In April 2024, the Grid Controller of India Ltd. noted an 11% drop in March hydropower production from the previous year, leading to a greater dependence on coal to meet energy demands. This highlights hydropower's sensitivity to rainfall and its impact on India's energy mix.

Solar power

See main article: Solar power in India. The solar energy sector in India offers potentially enormous capacity, though little of this potential has so far been exploited. Solar radiation of about 5,000 trillion kWh per year is incident over India's land mass, with average daily solar power potential of 0.25 kWh/m2 of used land area with available commercially proven technologies.[158] As of 31 March 2024, the installed capacity was 81.813 GWAC and nearly 6.7% of utility electricity generation.[146] India is the third largest producer of solar power globally.[8]

Solar power plants require nearly 2ha land per MW capacity, which is similar to coal-fired power plants when life cycle coal mining, consumptive water storage and ash disposal areas are taken into account, and hydropower plants when the submergence area of the water reservoir is included.[159] Solar plants with 1.33 million MW capacity could be installed in India on 1% of its land, which is about 32,000 km2 (3,200,000 hectares). Large tracts of land that are unproductive, barren and devoid of vegetation exist in all parts of India, exceeding 8% of its total area. These are potentially suitable for solar power.[160] It has been estimated that if 32,000 square km of these wastelands were used for solar power generation, 2000 billion kWh of electricity could be produced, twice the total power generated in 2013–14. At a price of 2.75 ₹/kWh and 1.8 million kWh/MW yearly generation, this would result in a land annual productivity/yield of per acre, which compares favorably with many industrial areas and is many times more than the best productive irrigated agriculture lands.[161] Building solar power plants on marginally productive lands offers the potential for solar electricity to replace all of India's fossil fuel energy requirements (natural gas, coal, lignite, and crude oil),[162] and could offer per capita energy consumption at par with USA/Japan for the peak population expected during its demographic transition.[163]

The sale price of power generated by solar photovoltaics fell to per kWh in November 2020 which is lower than any other type of power generation in India.[164] [165] In 2023, the levelised tariff in US$ for solar electricity fell to 1.62 cents/kWh, far below the solar PV sale tariff in India.[166] [167] In 2020, the power tariff from Solar PV clubbed with pumped storage hydro or battery storage have fallen below the coal based power plant tariffs in offering base load and peak load power supply.[151]

Land acquisition is a challenge for solar farm projects in India. Some state governments are exploring innovative ways to address land availability, for example, by deploying solar capacity above irrigation canals.[168] [169] This allows solar energy to be harvested while simultaneously reducing the loss of irrigation water by solar evaporation.[170] The state of Gujarat was first to implement the Canal Solar Power Project, using solar panels on a 19000km (12,000miles) long network of Narmada canals across the state to generate electricity. It was the first such project in India.

Synergy with other types of power generation

A major disadvantage of solar power is that it produces electricity only in daylight, and not during nighttime or cloudy daytime. This disadvantage can be overcome by adding energy storage capacity such as pumped-storage hydroelectricity.[171] A proposed gigantic-scale multipurpose project to interlink Indian rivers envisages coastal reservoirs for harnessing river waters that would also create adequte pumped-storage hydropower capacity for energy storage on a daily/weekly basis by consuming the surplus solar power available during the day time.[172] [173] Existing and future hydropower stations can also be expanded with additional pumped-storage hydroelectricity units to cater for nighttime electricity consumption. Most of the groundwater pumping power required can be met directly by solar power during the daytime.[174]

Concentrated solar power plants with thermal storage are also emerging as cheaper (US 5¢/kWh) and cleaner Load following power plants than fossil fuel power plants.[175] They can respond to demand round the clock, and work as base load power plants when there is excess solar energy. A mix of solar thermal and solar photovoltaic plants offers the potential to match load fluctuations without requiring costly battery storage.

Wind power

See main article: Wind power in India. In 2021, the onshore wind power potential was assessed as 302 GW at 100 meters and 695.50 GW at 120 meters above ground level.[176] The estimated potential is found on the higher side as the present installed capacity is operating below 20% CUF on average against the minimum 30% CUF considered while assessing the wind potential.[177] Out of the 695 GW potential at 120 m agl, 132 GW potential is assessed to have more than 32% CUF.[178]

India has the fourth largest installed wind power capacity in the world. As of 31 August 2023, the installed capacity of wind power was 44.081 GW, spread across many states of India.[146] [179] In 2022–23, wind power accounted for nearly 10% of India's total installed power capacity, and 4.43% of the country's power output. The wind power tariff of around 2.5 INR/kWh is the cheapest of all power generation sources in India.[180] Wind turbine towers and blades can also be made of wood to make them even greener and can surpass the hub height above the local ground level that is economically feasible with steel towers.[181] [182]

The offshore wind power potential of India is nearly 112 GW up to 50 meters water depth and nearly 195 GW up to 1000 meters water depth.[183] India has announced tentative schedule for calling request for quotation (RfQ) to establish offshore wind power projects.[184] The levelised cost of electricity (LCOE) has fallen to US$50 per MWh for offshore wind power plants.[183]

Biomass power

Biomass is organic matter from living organisms. As a renewable energy source, biomass can either be used directly via combustion to produce heat, or indirectly after converting it to various forms of biofuel using a range of methods which are broadly classified into thermal, chemical, and biochemical methods.[185] Biomass, bagasse, forestry, domestic organic wastes, industrial organic wastes, organic residue from biogas plants, and agricultural residue and waste can all be used as fuel to produce electricity.[186] [187] Nearly 750 million tons of biomass that is not edible by cattle is available annually in India.[188] [189]

The total use of biomass to produce heat in India was nearly 177 Mtoe in 2013.[190] 20% of households in India use biomass and charcoal for cooking purposes. This traditional use of biomass is being replaced by liquefied petroleum gas in rural areas, resulting in increased burning of biomass in fields, This has become a major source of air pollution in nearby towns and cities.[191] [188]

Torrefied biomass

Large quantities of imported coal are being used in pulverised coal-fired power stations. Raw biomass cannot be used directly in the pulverised coal mills as it is difficult to grind into fine powder due to caking. However, torrefaction makes it possible for biomass to replace coal.[192] The hot flue gas of existing coal-fired power stations can be used as a heat source for torrefaction, so that biomass can be cofired with coal.[193] [194] Surplus agriculture/crop residue biomass is beginning to be used for this purpose.[195] [196] Instead of shutting down/ retirement of coal-fired power plants due to concerns over pollution, it has been argued that these units can be retrofitted economically to produce electricity from biomass.[197] [198] Biomass contains substantial oxygen and lesser ash to make retrofitting of old units less capital intensive. Biomass power plants can also sell Renewable Energy Certificates, increasing their profitability.[199] [200] Cofiring of biomass up to 10% with coal in existing pulverised coal-fired power stations is successfully implemented in India.[201] [202] Central Government has made cofiring (minimum 5%) of biomass mandatary from October 2022 in all coal fired plants.[203] [204]

Biogas

In 2011, India started a new initiative to demonstrate the utility of medium-size mixed feed biogas-fertilizer pilot plants. The government approved 21 projects with an aggregate capacity of 37,016 cubic meters per day, of which 2 projects were successfully commissioned by December 2011. India commissioned a further 158 projects under its Biogas-based Distributed/Grid Power Generation program, with a total installed capacity of about 2 MW. In 2018, India has set a target of producing 15 million tons of biogas/bio-CNG by installing 5,000 large-scale commercial-type biogas plants which can produce daily 12.5 tons of bio-CNG by each plant.[205] As of May 2022, nearly 35 such plants are in operation.[206] Rejected organic solids from biogas plants can be used in coal plants after torrefaction.

Biogas is primarily methane, and can also be used to generate protein-rich feed for cattle, poultry and fish by growing Methylococcus capsulatus, a bacterium that grows directly on methane. This can be done economically in villages with low requirements for land and water.[207] [208] [209] The carbon dioxide gas produced as a by-product from these units can be used in cheaper production of algae oil or spirulina from algae cultivation, which may eventually substitute for crude oil.[210] [211] Using biogas for protein-rich feed production is also eligible for carbon credits as this sequesters carbon from the atmosphere.[212] There is significant potential to extract useful biomass from breweries, textile mills, fertilizer plants, the paper, and pulp industry, solvent extraction units, rice mills, petrochemical plants and other industries.[213]

The government is exploring several ways to use agro waste or biomass in rural areas to improve the rural economy.[214] [215] For example, biomass gasifier technologies are being explored to produce power from surplus biomass resources such as rice husk, crop stalks, small wood chips and other agro-residues in rural areas. The largest biomass-based power plant in India at Sirohi, Rajasthan has a capacity of 20 MW. During 2011, India installed 25 rice husk based gasifier systems for distributed power generation in 70 remote villages of Bihar, including a total of 1.20 MW in Gujarat and 0.5 MW in Tamil Nadu. In addition, gasifier systems were installed at 60 rice mills in India.[216] The green hydrogen roadmap is constantly evolving in India by consolidating various capabilities at institutional and research centers.[217] [218]

Geothermal energy

India's geothermal energy installed capacity is experimental, and commercial use is insignificant. According to some estimates, India has 10,600 MW of geothermal energy available.[219] The resource map for India has been grouped into six geothermal provinces:[220]

India has about 340 hot springs spread over the country. Of these, 62 are distributed along the northwest Himalaya, in the states of Jammu and Kashmir, Himachal Pradesh and Uttarakhand. They are found concentrated in a 30-50-km wide thermal band mostly along the river valleys. The Naga-Lusai and West Coast Provinces also manifest a series of thermal springs. The Andaman and Nicobar arc is the only place in India where volcanic activity continues, potentially a good site for geothermal energy. The Cambay geothermal belt is 200 km long and 50 km wide, with Tertiary sediments. Thermal springs have been reported from the belt although they are not of very high temperature or flow levels. High subsurface temperature and thermal fluid have been reported in deep drill wells in depth ranges of 1.7 to 1.9  km during drilling in this area. Steam blowout has also been reported in drill holes in a depth range of 1.5 to 3.4  km. The thermal springs in India's peninsular region are more related to the faults, which allow water to circulate to considerable depths. The circulating water acquires heat from the normal thermal gradient in the area, and can emerge at a high temperature.[220]

In a December 2011 report, India identified six promising geothermal sites for the development of geothermal energy. In decreasing order of potential, these are:

Puga and Chumathang area in Ladakh are deemed as the most promising geothermal fields in India. These areas were discovered in the 1970s and initial exploratory efforts were made in the 1980s by Geological Survey of India (GSI). On 6 February 2021, the ONGC Energy Center (OEC) signed a Memorandum of Understanding (MoU) with Ladakh and the Ladakh Autonomous Hill Development Council, Leh in the presence of current Lieutenant governor Radha Krishna Mathur.[221]

Tidal power

In 2011, the Ministry of New & Renewable Energy, Government of India and the Renewable Energy Development Agency of West Bengal jointly approved and agreed to implement India's first 3.75 MW Durgaduani mini tidal power project.[222]

Another tidal wave technology harvests energy from surface waves or from pressure fluctuations below the sea surface. A report from the Ocean Engineering Centre, at the Indian Institute of Technology Madras estimated the annual wave energy potential along the Indian coast is 5 to 15 MW/metre, suggesting a theoretical maximum potential for electricity harvesting along India's 7500-kilometer coastline of about 40 GW. However, the realistic economical potential is likely to be considerably less than this.[223]

The third approach to harvesting tidal energy is ocean thermal energy technology. This approach harvests the solar energy trapped in ocean waters. Oceans have a thermal gradient, the surface being much warmer than the deeper levels of the ocean. This thermal gradient may be harvested using the modified Rankine cycle. India's National Institute of Ocean Technology (NIOT) has attempted this approach without success. In 2003, NIOT attempted to build and deploy a 1 MW demonstration plant with Saga University of Japan,[224] but mechanical problems prevented success.

Electricity transmission and distribution

See main article: National Grid (India).

See also: Availability based tariff. As of 2013, India has a single wide area synchronous grid that covers the entire country except distant islands.[225] As of 31 March 2024, the length of high voltage transmission lines (66 KV & above) is 817,972 circuit kilometers and the length of transmission & distribution lines (below 66 KV) is 14,077,053 circuit kilometers.[88]

Installed transmission lines and distribution capacity (MVA)as of 31 July 2018[226] [227] ! Capacity !! Substations
(MVA) !! Transmission lines
(circuit km) !!c.km / MVA ratio[228]
HVDC ± 220 kV & above 22,500 15,556 0.691
765 kV 197,50036,673 0.185
400 kV 292,292173,172 0.707
220 kV 335,696 170,748 0.592
220 kV & above 847,988 396,149 0.467
The total length of high voltage (HV) transmission lines (220kV and above) would be enough to form a square matrix of area 266 km2 (i.e. a square grid 16.3 km on a side, so that on average there is at least one HV line within a distance of 8.15 km) over the entire area of the country. This represents a total of almost 20% more HV transmission lines than that of the United States (322000km (200,000miles) of 230 kV and above). However the Indian grid transmits far less electricity.[229] The installed length of transmission lines of 66 kV and above is 649833km (403,788miles) (on average, there is at least one ≥66 kV transmission line within 4.95 km across the country).[5] The length of secondary transmission lines (400 V and above) is 10381226km (6,450,595miles) as of 31 March 2018.[5] The spread of total transmission lines (≥400 V) would be sufficient to form a square matrix of area 0.36 km2 (i.e. on average, at least one transmission line within 0.31 km distance) over the entire area of the country. In a future grid dominated by decentralized power generation like solar and wind power, unscientific expansion of the electrical grid would yield negative results due to Braess's paradox.[230]

The all-time maximum peak load met was 182,610 MW on 30 May 2019.[231] The maximum achieved demand factor of substations is nearly 60% at the 220 kV level. However, the operational performance of the system is not satisfactory in meeting peak electricity loads.[232] [233] This has led to the initiation of detailed forensic engineering studies, with a plan to make capital investments in a smart grid that maximizes the utility of the existing transmission infrastructure.[234] [235]

The introduction of an availability based tariff (ABT) originally helped to stabilize the Indian transmission grids. However, as the grid transitions to power surplus the ABT has become less useful. The July 2012 blackout, affecting the north of the country, was the largest power grid failure in history as measured by the number of people affected.

India's aggregate transmission and commercial (ATC) losses were nearly 21.35% in 2017–18.[236] [5] [237] This compares unfavorably to the total ATC loss in the electricity sector of the United States, which was only 6.6% out of 4,404 billion kWh electricity supplied during the year 2018.[238] The Indian government set a target of reducing losses to 17.1% by 2017 and to 14.1% by 2022. A high proportion of non-technical losses are caused by illegal tapping of lines, faulty electric meters and fictitious power generation that underestimates actual consumption and also contributes to reduced payment collection. A case study in Kerala estimated that replacing faulty meters could reduce distribution losses from 34% to 29%.[52]

Foreign electricity trade

India's National Grid is synchronously interconnected to Bhutan, and asynchronously linked with Bangladesh, Myanmar and Nepal.[239] An undersea interconnector to Sri Lanka (India–Sri Lanka HVDC Interconnection) have been proposed.[240] Singapore and UAE are interested to import electricity from India by establishing undersea cable link to reduce carbon emissions as imported electricity would not contribute to carbon emissions upon its use whether it is generated from renewable resources or not in the exporting country.[241]

India has been exporting electricity to Bangladesh, Myanmar and Nepal and importing excess electricity from Bhutan.[242] [243] Since 2016–17, India has been a net exporter of electricity with 9,232 Gwh exports and 7,597 Gwh imports, mainly from Bhutan, in 2021–22.[85] [244] [245] In 2018, Bangladesh proposed importing 10,000 MW power from India.[246]

Electricity (Million kWh) Trade by India.[247] ! Fiscal year !! Bhutan !! Nepal !!Bangladesh!! Myanmar !!Total
2023-24 +3,763 style="text-align:right;"-154style="text-align:right;"-8,413style="text-align:right;"-8style="text-align:right;"-4,812
Net exports (-) and Net imports (+). The above exports to Bangladesh are excluding the exports from the 1600 MW Godda Thermal Power Station which is located in India but not connected to Indian electric grid.

To encourage the carbon neutral solar power generation, plans are made to transform the Indian national grid into a transnational grid expanding up to Vietnam towards east and Saudi Arabia towards west spanning nearly 7,000 km wide.[248] [249] Being at the central location of the widened grid, India will be able to import the excess solar power available outside its territory at cheaper prices to meet the morning and evening peak load power demands without much costly energy storage.[250]

Regulation and administration

The Ministry of Power is India's top union government body regulating the electrical energy sector in India. The ministry was created on 2 July 1992. It is responsible for planning, policy formulation, processing of projects for investment decisions, monitoring project implementation, training and manpower development, and the administration and enactment of legislation in regard to power generation, transmission and distribution.[251] It is also responsible for the administration of India's Electricity Act (2003), the Energy Conservation Act (2001) and has the responsibility of undertaking amendments to these Acts when necessary to meet the union government's policy objectives.

Electricity is a concurrent list subject at Entry 38 in List III of the Seventh Schedule of the Constitution of India. In India's federal governance structure, this means that both the union government and India's state governments are involved in establishing policies and laws for the electricity sector. This requires the union government and individual state governments to enter into memoranda of understanding to help expedite projects in the individual states.[252] To disseminate information to the public on power purchases by the distribution companies (discoms), the government of India recently started posting data on its website on a daily basis.[253]

Trading

Bulk power purchasers can buy electricity on a daily basis for short, medium, and long-term durations from a reverse e-auction facility.[254] The electricity prices transacted by the reverse e-auction facility are far less than the prices agreed under bilateral agreements.[255] The commodity derivative exchange Multi Commodity Exchange has sought permission to offer electricity futures markets in India.[256] The union government of India is also planning reverse procurement process in which generators and discoms with surplus power can seek e-bids for power supply for up to a one-year period, to put an end to bilateral contracts and determine the market-based price for electricity.[257]

Energy saving certificates (PAT), various renewable purchase obligations (RPO), and renewable energy certificates (REC) are also traded on the power exchanges regularly.[258] [259]

Government-owned power companies

India's Ministry of Power administers central government-owned companies involved in the generation of electricity in India. These include the National Thermal Power Corporation, Neyveli Lignite Corporation, the SJVN, the Damodar Valley Corporation, the National Hydroelectric Power Corporation and the Nuclear Power Corporation of India. The Power Grid Corporation of India is also administered by the Ministry; it is responsible for the inter-state transmission of electricity and the development of the national grid.

The Ministry works with state governments on matters related to state government-owned corporations in India's electricity sector. Examples of state corporations include the Telangana Power Generation Corporation, the Andhra Pradesh Power Generation Corporation Limited, the Assam Power Generation Corporation Limited, the Tamil Nadu Electricity Board, the Maharashtra State Electricity Board, the Kerala State Electricity Board, the West Bengal State Electricity Distribution Company and Gujarat Urja Vikas Nigam Limited.

Funding of power infrastructure

India's Ministry of Power administers the Rural Electrification Corporation Limited and the Power Finance Corporation Limited. These central-government-owned public sector enterprises provide loans and guarantees for public and private electricity sector infrastructure projects in India. Excessive plant construction loans at 75% of overestimated costs on overrated plant capacities have led to stranded assets of US$40 to 60 billion.[260] [261] The central and state-owned power generators escaped this crisis as they had entered PPAs with state-owned monopolistic discoms on a cost-plus basis at higher than prevailing market power tariffs, without undergoing competitive bidding process. Many direct and indirect subsidies are given to various sectors.[262]

Budgetary support

After the enactment of Electricity Act 2003 budgetary support to the power sector is negligible.[263] Many State Electricity Boards were separated into their component parts after the act came into force, creating separate entities for generating, transmitting and distributing power.[264]

Human resource development

The rapid growth of the electricity sector in India has generated high demand for trained personnel. India is making efforts to expand energy education and to enable existing educational institutions to introduce courses related to energy capacity addition, production, operations and maintenance. This initiative includes conventional and renewable energy.

The Ministry of New and Renewable Energy announced that State Renewable Energy Agencies are being supported to organize short-term training programs for installation, operation and maintenance, and repair of renewable energy systems in locations where intensive renewable energy programs are being implemented. Renewable Energy Chairs have been established at the Indian Institute of Technology Roorkee and the Indian Institute of Technology Kharagpur.[216] The Central Training Institute Jabalpur is a training institute for power distribution engineering and management. The NTPC School of Business Noida has initiated an energy-centered two-year post-graduate diploma in the management program and a one-year post-graduate diploma in management (executive) program, to cater to the growing need for management professionals in this area. Education and availability of skilled workers are expected to be a key challenge in India's effort to expand its electricity sector.

Problems with India's power sector

India's electricity sector faces many issues, including:

  1. Inadequate last mile connectivity. The country already has adequate generation and transmission capacity to meet the full consumer demand, both temporally and spatially. However, due to the lack of last-mile link-up between all electricity consumers and a reliable power supply (to exceed 99%), many consumers depend on diesel generators. Nearly 80 billion kWh of electricity is generated annually in India by diesel generator sets that consume nearly 15 million tons of diesel oil. Over 10 million households use battery storage UPS as back-ups in case of load shedding.[265] India imports nearly US$2 billion worth of battery storage UPS every year.[266] As overhead lines cause distribution problems during rain and wind storms, there is a plan to lay buried cables from low voltage substations to supply cheaper emergency power in cities and towns and thus reduce diesel oil consumption by diesel generator sets and the installation of UPS systems.
  2. Demand build up measures. Electricity-intensive industries consume the cheaper electricity (average price Rs 2.5 per kWhr) available from the grid instead of running their own coal/gas/oil fired captive power plants.[267] [268] The captive power generation capacity by such plants is nearly 53,000 MW, and they are mainly established in steel, fertilizer, aluminium, cement, etc. industries.[269] These plants can draw cheaper electricity from the grid on short term open access (STOA) basis, avoiding their own higher cost of electricity generation and diverting power from other consumers.[270] [271] Some of these idling captive power plants can be used for ancillary services or grid reserve service and earn extra revenue.[272] [273]
  3. Unequal electricity distribution. Almost all households have access to electricity. However, most households find the electricity supply intermittent and unreliable.[274] At the same time, many power stations are idling for lack of electricity demand and the idling generation capacity is sufficient to supply the needs of households lacking electricity three times over.
  4. Erratic power pricing. In general, industrial and commercial consumers subsidize domestic and agricultural consumers.[275] [276] Government giveaways such as free electricity for farmers, created partly to curry political favor, have depleted the cash reserves of state-run electricity-distribution system and led to debts of .[277] This has financially crippled the distribution network, and its ability to pay to purchase power in the absence of subsidies from state governments.[278] This situation has been worsened by state government departments that do not pay their electricity bills.
  5. Over-rated capacity. Many coal-fired plants are overrated above the actual maximum continuous rating (MCR) capacity.[279] to allow the plant cost to be inflated.[280] These plants operate 15 to 10% below their declared capacity on a daily basis and rarely operate at declared capacity, undermining grid stability.
  6. Lack of timely information on load and demand. Intraday graphs at 15-minute or more frequent intervals are required to understand the shortcomings of the power grid with respect to grid frequency, including comprehensive data collected from SCADA for all grid-connected generating stations (≥ 100 KW) and load data from all substations.[281]
  7. Lack of adequate coal supply: Despite abundant reserves of coal, power plants are frequently under-supplied. India's monopoly coal producer, state-controlled Coal India, is constrained by primitive mining techniques and is rife with theft and corruption. Poor coal transport infrastructure has worsened these problems. Most of India's coal lies under protected forests or designated tribal lands and efforts to mine additional deposits have been resisted.
  8. Poor gas pipeline connectivity and infrastructure. India has abundant coal bed methane and natural gas potential. However a giant new offshore natural gas field has delivered far less gas than claimed, causing a shortage of natural gas.
  9. Transmission, distribution and consumer-level losses. Losses exceed 30%, including the auxiliary power consumption of thermal power stations and fictitious electricity generation by wind generators, solar power plants & independent power producers (IPPs), etc.
  10. Resistance to energy efficiency in the residential building sector. Continuous urbanization and the growth of population result in increased power consumption in buildings. The belief still predominates among stakeholders that energy-efficient buildings are more expensive than conventional buildings, adversely affecting the "greening" of the building sector.[282]
  11. Resistance to hydroelectric power projects. Hydroelectric power projects in India's mountainous north and northeast regions have been slowed down by ecological, environmental and rehabilitation controversies, coupled with public interest litigation.
  12. Resistance to nuclear power generation. Political activism since the Fukushima disaster has reduced progress in this sector. The track record of executing nuclear power plants is also very poor in India.[283] [141]
  13. Theft of power. The financial loss due to theft of electricity is estimated at $16 billion yearly.

Key implementation challenges for India's electricity sector include efficient performance of new project management and execution, ensuring availability and appropriate quality of fuel, developing the large coal and natural gas resources available in India, land acquisition, obtaining environmental clearances at state and central government level, and training skilled manpower.[284]

Electricity as a substitute for imported LPG and PNG

See also: Energy in India. India's net import of liquefied petroleum gas (LPG) is 16.607 million tons and the domestic consumption is 25.502 million tons which is 90% of total consumption in 2021–22.[285] The LPG import content is nearly 57% of total consumption in 2021–22.[286] The affordable electricity retail tariff (860 Kcal/kWh at 74% heating efficiency) to replace LPG (net calorific value 11,000 Kcal/Kg at 40% heating efficiency) in domestic cooking is up to 10.2 ₹/kWh when the retail price of LPG cylinder is ₹1000 (without subsidy) with 14.2 kg LPG content.[287] Replacing LPG consumption with electricity would reduce imports substantially.[288]

India's piped natural gas (PNG) for domestic cooking needs was 12,175 million standard cubic meters (mmscm) which is nearly 19% of total natural gas consumption in 2021–22.[285] Natural gas/ LNG import content is nearly 56% of total consumption in 2021–22.[285] The affordable electricity retail tariff (860 Kcal/kWh at 74% heating efficiency) to replace PNG (net calorific value 8,500 Kcal/scm at 40% heating efficiency) in domestic cooking is up to 9 ₹/kWh when the retail price of PNG is ₹47.59 per scm.[289] [290] Replacing PNG consumption with electricity would reduce costly LNG imports substantially.

The domestic consumption of kerosene is 1.291 million tons out of 1.493 million tons total consumption in 2021–22. The subsidized retail price of kerosene is 15 ₹/liter whereas the export/import price is 79 ₹/liter. The affordable electricity retail tariff (860 Kcal/kWh at 74% heating efficiency) to replace kerosene (net calorific value 8240 Kcal/liter at 40% heating efficiency) in domestic cooking is up to 15.22 ₹/kWh when the kerosene retail price is 79 ₹/liter.

In 2022–23, the plant load factor (PLF) of coal-fired thermal power stations (nearly 212 GW) was only 64.15%.[87] These stations can run above 85% PLF if there is adequate electricity demand. The possible additional net electricity generation at 85% PLF is nearly 450 billion kWh which is enough to replace all the LPG, PNG, and kerosene consumption in the domestic sector.[291] The incremental cost of generating additional electricity is only the coal fuel cost, less than 3 ₹/kWh. Enhancing the PLF of coal-fired stations and encouraging domestic electricity consumers to substitute electricity in place of LPG, PNG, and kerosene in household cooking would reduce government subsidies. It has been proposed that domestic consumers who are willing to surrender subsidized LPG/kerosene permits should be given a free electricity connection and a subsidized electricity tariff.[292] [293] To avoid the possibility of fatal electric shocks and improve the safety standard more than that of LPG cooking, power is supplied to the electric cook stove through a residual-current circuit breaker.

The power demand in India, peaks during the morning and evening hours mainly due to electricity consumption for water heating. To moderate the peak power demand, heat pump water heaters are available which consume 2 to 3 times less electricity for the same heat load.[294]

Substantial scope is also present in micro, small, and medium enterprises (MSME) to switch over to electricity from fossil fuels to reduce the cost of production provided uninterrupted power supply is ensured.[295] Since 2017, IPPs have been offering to sell solar and wind power below 3.00 ₹/kWh to feed into the high voltage grid. After considering distribution costs and losses, solar power appears to be a viable economic option for replacing the LPG, PNG, kerosene, etc. used in the domestic and MSME sectors. In August 2024, renewable power producers are offering firm and dispatchable renewable electricity at 4.98 ₹/kWh (0.06 $/kWh) which is economical to replace fossil fuels in above applications.[296] [297]

Electric vehicles

See also: Electric vehicle industry in India. The retail prices of petrol and diesel are high enough in India to make electricity driven vehicles relatively economical.[298] The retail price of diesel was 101.00 ₹/liter in 2021–22, and the retail price of petrol was 110.00 ₹/liter. The affordable retail electricity price to replace diesel would be up to 19 ₹/kWh (860 Kcal/kWh at 75% input electricity to shaft power efficiency versus diesel's net calorific value of 8572 Kcal/liter at 40% fuel energy to crankshaft power efficiency), and the comparable number to replace petrol would be up to 28 ₹/kWh (860 Kcal/kWh at 75% input electricity to shaft power efficiency versus petrol's net calorific value at 7693 Kcal/liter at 33% fuel energy to crankshaft power efficiency). In 2021–22, India consumed 30.849 million tons of petrol and 76.687 million tons of diesel, both mainly produced from imported crude oil.[285] To spread the use of electric vehicles rapidly and reduce the consumption of imported fossil fuels, electricity sale prices at fast charging centers could be subsidized to below 5 ₹/kWh. Thus owners of commercial passenger and goods vehicles can be attracted to switch to costly electric vehicles which do not contribute to surface air pollution.[299]

Electricity-driven vehicles are expected to become popular in India when energy storage/battery technology offers improved range, longer life, and lower maintenance.[300] [301] Conversion of old petrol and diesel vehicles to battery electric vehicles is also feasible as the battery pack prices become affordable. Vehicle to grid options are also attractive, potentially allowing electric vehicles to help to mitigate peak loads in the electricity grid.[302] Discarded batteries of electric vehicles are also used as energy storage systems economically.[303] The potential for continuous charging of electric vehicles through wireless electricity transmission technology is being explored by Indian companies and others.[304] [305] [306]

Energy reserves

India has abundant solar, wind, hydro (including pumped storage) and biomass power potential. In addition, as of January 2011 India had approximately 38 trillion cubic feet (Tcf) of proven natural gas reserves, the world's 26th largest reserve.[307] The United States Energy Information Administration estimates that India produced approximately 1.8 Tcf of natural gas in 2010 while consuming roughly 2.3 Tcf of natural gas. India already produces coalbed methane.

See also

External links

Notes and References

  1. Web site: Power Sector at a Glance ALL INDIA Government of India Ministry of Power . 2022-11-24 . powermin.gov.in . 4 November 2021 . https://web.archive.org/web/20211104073555/https://powermin.gov.in/en/content/power-sector-glance-all-india . live .
  2. Web site: IEA India. 21 September 2021. 20 September 2021. https://web.archive.org/web/20210920231754/https://www.iea.org/countries/india. live.
  3. Web site: India electricity prices, December 2020 . GlobalPetrolPrices.com . 21 September 2021 . en . 21 September 2021 . https://web.archive.org/web/20210921223754/https://www.globalpetrolprices.com/India/electricity_prices/ . live .
  4. Web site: BP Statistical Review of World Energy 2021 (page 63). 23 November 2021. 12 December 2021. https://web.archive.org/web/20211212103703/http://www.indiaenvironmentportal.org.in/files/file/bp%20statistical%20review%20of%20world%20energy%202021.pdf. dead.
  5. Web site: Growth of Electricity Sector in India from 1947–2020 . . October 2020 . 22 September 2021 . 27 October 2021 . https://web.archive.org/web/20211027125432/https://cea.nic.in/wp-content/uploads/pdm/2020/12/growth_2020.pdf . live .
  6. Web site: Tariff & duty of electricity supply in India . report . CEA, Govt. of India . March 2014 . 27 October 2015 . 26 August 2015 . https://web.archive.org/web/20150826192254/http://www.slideshare.net/ashishverma061/tariff-and-duty-of-electricity-supply-in-various-state-of-indiaa-review-by-cea . live .
  7. Web site: Executive Summary of Power Sector, March 2024 . 2 May 2024.
  8. Web site: Report - Global Electricity Report 2024 (page 131). EMBER. 9 May 2024.
  9. Web site: India - Countries & Regions . 2024-04-19 . IEA . en-GB.
  10. Web site: Koyala Darpan / Coal Dashboard . live . https://web.archive.org/web/20220216204644/https://coaldashboard.cmpdi.co.in/dashboard.php . 16 February 2022 . 17 February 2022.
  11. Web site: 28 March 2021 . Global electricity review-India . dead . https://web.archive.org/web/20210329033038/https://ember-climate.org/global-electricity-review-2021/g20-profiles/india/ . 29 March 2021 . 30 March 2021.
  12. News: National Electricity Plan, 2022-27 . September 2022 . 14 September 2022 . 14 September 2022 . https://web.archive.org/web/20220914182122/https://cea.nic.in/wp-content/uploads/irp/2022/09/DRAFT_NATIONAL_ELECTRICITY_PLAN_9_SEP_2022_2-1.pdf . live .
  13. Web site: Next green leader? India halts new coal plant construction. . Arasu . Sibi . The Christian Science Monitor . 1 June 2023 . 15 August 2023 . 15 August 2023 . https://web.archive.org/web/20230815025302/https://www.csmonitor.com/Environment/2023/0601/Next-green-leader-India-halts-new-coal-plant-construction . live .
  14. Web site: Optimal generation capacity mix . CEA, Govt. of India . January 2020 . 12 July 2020 . 2 July 2021 . https://web.archive.org/web/20210702224900/https://cea.nic.in/wp-content/uploads/irp/2020/12/Optimal_mix_report_2029-30_FINAL.pdf . live .
  15. News: 26 April 2009 . Let there be light . The Telegraph . 7 October 2022 . 7 October 2022 . https://web.archive.org/web/20221007141855/https://www.telegraphindia.com/culture/let-there-be-light/cid/334620 . live .
  16. Web site: Electricity arrives in Mumbai . 1 August 2012 . https://web.archive.org/web/20130202092127/http://www.bestundertaking.com/mumbai.asp . 2 February 2013 . dead .
  17. Web site: Archives Darjeeling Hydro Power System – IET history – The IET. 29 July 2015. 23 July 2015. https://web.archive.org/web/20150723065919/http://www.theiet.org/resources/library/archives/featured/darjeeling.cfm. live.
  18. Web site: NYOOOZ – Simply News Local News, India News, City News, Politics. 5 June 2015. 4 March 2016. https://web.archive.org/web/20160304031558/http://www.nyoooz.com/bangalore/118780/bengalurus-first-lamp-post-set-up-in-1905-stands-forgotten. live.
  19. Web site: Relic of India's first electric railway to be dismantled . Daily News & Analysis . 20 November 2011 . dna . 29 July 2015 . 26 January 2012 . https://web.archive.org/web/20120126050306/http://www.dnaindia.com/mumbai/report_relic-of-indias-first-electric-railway-to-be-dismantled_1614956 . live .
  20. Web site: हिंदी खबर, Latest News in Hindi, हिंदी समाचार, ताजा खबर. 10 August 2021. 21 May 2021. https://web.archive.org/web/20210521200053/https://www.patrika.com/jabalpur-news/jabalpur-engineering-collage-has-first-high-voltage-lab-of-country-1445162/. live.
  21. News: Cochin International Airport set to become worlds's first fully solar powered major airport. LiveMint. 18 August 2015. Kochi, India. 3 December 2016. 22 March 2023. https://web.archive.org/web/20230322074258/https://www.livemint.com/Politics/nYRV0SGkot3GIOvQrqhBXL/Worlds-first-solarrun-airport-in-Kochi.html. live.
  22. News: Menon . Supriya . How is the world's first solar powered airport faring? – BBC News . BBC News . 9 October 2015 . 1 December 2016 . 25 May 2023 . https://web.archive.org/web/20230525214353/https://www.bbc.com/news/world-asia-india-34421419 . live .
  23. Web site: One Nation-One Grid. Power Grid Corporation of India. 2 December 2016. 26 February 2017. https://web.archive.org/web/20170226175901/http://www.powergridindia.com/_layouts/PowerGrid/User/ContentPage.aspx?PId=78&LangID=English. dead.
  24. News: Indian power system becomes largest operating synchronous grid in the world. The Times of India. 2 December 2016. 13 June 2016. https://web.archive.org/web/20160613122522/http://timesofindia.indiatimes.com/india/All-India-Power-Engineers-Federation-Indian-power-system/articleshow/28294988.cms. live.
  25. Web site: Draft National Electricity Plan, 2016, CEA. 11 December 2016. 20 December 2016. https://web.archive.org/web/20161220133152/http://www.cea.nic.in/reports/committee/nep/nep_dec.pdf. dead.
  26. Web site: International oil market watch . 17 January 2016 . 15 October 2017 . https://web.archive.org/web/20171015210703/http://www.aip.com.au/pricing/marketwatch.htm . dead .
  27. Web site: Naphtha spot price . 17 January 2016 . 17 December 2016 . https://web.archive.org/web/20161217103024/http://www.quotenet.com/commodities/naphtha . dead .
  28. Web site: Bunker fuel spot price . 17 January 2016 . 23 October 2020 . https://web.archive.org/web/20201023151823/http://www.mabux.com/ . live .
  29. Web site: Global LNG prices lose ground on weak demand . 27 February 2016 . 6 March 2016 . https://web.archive.org/web/20160306124005/http://energy.economictimes.indiatimes.com/news/oil-and-gas/global-lng-prices-lose-ground-on-weak-demand/51163611 . dead .
  30. Web site: LNG looks poised to follow crude oil's plunge . 3 August 2023 . 19 January 2016 . 27 July 2018 . https://web.archive.org/web/20180727181343/https://in.reuters.com/article/column-russell-lng-asia-idINL3N15219G . dead .
  31. News: Peaking power generated from imported LNG at Rs 4.70 per unit . The Economic Times . 21 March 2016 . 21 March 2016 . 24 March 2016 . https://web.archive.org/web/20160324163333/http://economictimes.indiatimes.com/industry/energy/oil-gas/ratnagiri-gmr-gvk-lanco-others-successful-in-natural-gas-auction/articleshow/51487320.cms . live .
  32. Web site: Global coal price on downslide, no cheer for Indian power producers . 13 December 2015 . 22 December 2015 . https://web.archive.org/web/20151222130257/http://www.business-standard.com/article/economy-policy/global-coal-price-on-the-downslide-115082700011_1.html . live .
  33. News: Govt asks Coal India to liquidate pithead stock. Press Trust of India. 28 January 2016. Business Standard. 27 September 2019. 27 September 2019. https://web.archive.org/web/20190927234829/https://www.business-standard.com/article/pti-stories/govt-asks-coal-india-to-liquidate-pithead-stock-116012801064_1.html. live.
  34. Web site: Tim Buckley. Kashish Shah. India's Electricity Sector Transformation. Institute for Energy Economics and Financial Analysis. 5 May 2018. 2. 21 November 2017. 6 May 2018. https://web.archive.org/web/20180506103802/http://ieefa.org/wp-content/uploads/2017/11/India-Electricity-Sector-Transformation_Nov-2017-3.pdf. live.
  35. News: India can achieve 1,650 billion units of electricity next year, Piyush Goyal . The Economic Times . 7 July 2016 . 9 July 2016 . 7 July 2016 . https://web.archive.org/web/20160707181600/http://economictimes.indiatimes.com/industry/energy/power/india-can-achieve-1-65-billion-units-of-electricity-next-year-piyush-goyal/articleshow/53103685.cms . live .
  36. Web site: Mapped: The 1.2 Billion People Without Access to Electricity. 27 November 2019. 29 November 2019. 27 November 2019. https://web.archive.org/web/20191127205722/https://www.visualcapitalist.com/mapped-billion-people-without-access-to-electricity/. live.
  37. News: States resolve to provide 24x7 power to everyone by March 2019 . The Economic Times . 18 June 2016 . 18 June 2016 . https://web.archive.org/web/20160618104036/http://economictimes.indiatimes.com/industry/energy/power/states-resolve-to-provide-24x7-power-to-everyone-by-march-2019/articleshow/52802534.cms . live .
  38. News: Government decides to electrify 5.98 crore unelectrified households by December 2018 . The Economic Times . 20 June 2016 . Singh . Sarita . 19 June 2016 . https://web.archive.org/web/20160619222134/http://economictimes.indiatimes.com/industry/energy/power/government-decides-to-electrify-598-crore-un-electrified-households-by-december-2018/articleshow/52825361.cms . live .
  39. Web site: All India Installed power capacity . Central Electricity Authority . April 2020 . 3 May 2020 . 12 May 2020 . https://web.archive.org/web/20200512013135/http://www.cea.nic.in/reports/monthly/installedcapacity/2020/installed_capacity-03.pdf . dead .
  40. Web site: All India Installed power capacity . Central Electricity Authority . April 2021 . 30 April 2021 . 18 April 2021 . https://web.archive.org/web/20210418222511/https://cea.nic.in/wp-content/uploads/installed/2021/03/installed_capacity.pdf . live .
  41. Web site: Thermal power projects under construction as on 1 April 2021. Central Electricity Authority. April 2021. 30 April 2021. 30 April 2021. https://web.archive.org/web/20210430154024/https://cea.nic.in/wp-content/uploads/thermal_broad/2021/03/Broad%20Status%20Report%20-%20March,2021.pdf. live.
  42. Web site: List of major captive power plants . 3 October 2017 . 13 May 2018 . 4 February 2019 . https://web.archive.org/web/20190204065738/https://powerline.net.in/2017/10/03/captive-power-market/ . live .
  43. Web site: Gensets add up to under half of installed power capacity; August, 2014 . 18 August 2014 . 13 May 2015 . 18 May 2015 . https://web.archive.org/web/20150518141623/http://indianexpress.com/article/india/india-others/gensets-add-up-to-under-half-of-installed-power-capacity/ . live .
  44. Web site: The True Cost of Providing Energy to Telecom Towers in India . 29 August 2015.
  45. Web site: State Wise Captive Power in India, NITI Aayog . 11 April 2024.
  46. Web site: Draft National Electricity Plan 2022. 1 June 2023. 19 May 2023. https://web.archive.org/web/20230519051329/https://cea.nic.in/wp-content/uploads/irp/2022/09/DRAFT_NATIONAL_ELECTRICITY_PLAN_9_SEP_2022_2-1.pdf. live.
  47. Web site: Average spot power price to be less than Rs 3.5 per unit in May. 12 May 2019. 12 May 2019. https://web.archive.org/web/20190512095921/https://energy.economictimes.indiatimes.com/news/power/average-spot-power-price-to-be-less-than-rs-3-5-per-unit-in-may/69292245. live.
  48. Web site: Will try to keep power prices lower, says Piyush Goyal. 13 January 2016. 8 August 2016. https://web.archive.org/web/20160808024138/http://energy.economictimes.indiatimes.com/news/power/will-try-to-keep-power-prices-lower-says-piyush-goyal/50525720. live.
  49. Web site: Dark future ahead? 11,000 mw thermal power capacity lying idle, largest outage is in the north. 13 January 2016. 16 January 2016. https://web.archive.org/web/20160116204120/http://energy.economictimes.indiatimes.com/news/power/dark-future-ahead-11000-mw-thermal-power-capacity-lying-idle-largest-outage-is-in-the-north/50556138. live.
  50. Web site: Is a distress sale on by private power producers? . 20 July 2015 . 21 July 2015 . 10 January 2016 . https://web.archive.org/web/20160110012632/http://www.thehindubusinessline.com/companies/is-a-distress-sale-on-by-private-power-producers/article7444321.ece . live .
  51. Web site: Indian power plants find Rs1.2 trillion of capacity has no takers . 29 June 2015 . 29 June 2015 . 30 June 2015 . https://web.archive.org/web/20150630212854/http://www.livemint.com/Industry/xBRsCnMXJOeGWTUVQb0ivN/Indian-power-plants-find-19-billion-of-capacity-has-no-take.html . live .
  52. Web site: Technology development prospects for the Indian power sector . Uwe Remme . International Energy Agency France; OECD . February 2011 . etal . 22 April 2015 . 14 November 2019 . https://web.archive.org/web/20191114155449/https://www.iea.org/publications/freepublications/publication/technology_development_india.pdf . live .
  53. Web site: Analysis of the energy trends in the European Union & Asia to 2030. Centre for Energy-Environment Resources Development, Thailand. January 2009. 30 December 2011. 3 March 2012. https://web.archive.org/web/20120303080451/http://eeas.europa.eu/energy/events/asem_energy_2009/eu_asia_energy_trends_en.pdf. live.
  54. Web site: Making the world hotter: India's expected air-conditioning explosion . 5 December 2018 . 5 December 2018 . https://web.archive.org/web/20181205193247/https://energy.economictimes.indiatimes.com/news/coal/making-the-world-hotter-indias-expected-air-conditioning-explosion/66933622 . dead .
  55. Web site: Climate Investment Opportunities in India's Cooling Sector. 30 November 2022. World Bank. 2022. 29 November 2022. https://web.archive.org/web/20221129190821/http://www.indiaenvironmentportal.org.in/files/file/climate%20investment%20opportunities%20in%20India.pdf. live.
  56. Web site: LPG cylinder now used by 89% households . 5 December 2018 . 29 May 2023 . https://web.archive.org/web/20230529102836/https://energy.economictimes.indiatimes.com/news/oil-and-gas/lpg-cylinder-now-used-by-89-households/66930301 . live .
  57. http://www.pciaonline.org/sierra-club The Partnership for Clean Indoor Air – Sierra Club
  58. Web site: INDOOR AIR POLLUTION IN INDIA – A MAJOR ENVIRONMENTAL AND PUBLIC HEALTH CONCERN. Ganguly. 2001. Indian Council of Medical Research, New Delhi. etal. 31 December 2011. 23 January 2013. https://web.archive.org/web/20130123100726/http://www.icmr.nic.in/bumay01.pdf. dead.
  59. Web site: The Asian Brown Cloud: Climate and Other Environmental Impacts. United Nations Environmental Programme. 2002. dead. https://web.archive.org/web/20120526093020/http://www.rrcap.unep.org/issues/air/impactstudy/Executive%20Summary.pdf. 26 May 2012.
  60. Web site: Indoor air pollution and household energy. WHO and UNEP. 2011. 4 October 2020. 30 January 2014. https://web.archive.org/web/20140130090511/http://www.who.int/heli/risks/indoorair/indoorair/en/index.html. live.
  61. Web site: Green stoves to replace chullahs. 3 December 2009 . https://web.archive.org/web/20130517215338/http://articles.timesofindia.indiatimes.com/2009-12-03/india/28096828_1_biomass-climate-renewable-energy-sources. dead. The Times of India. 17 May 2013.
  62. Web site: Status of Sewage Treatment in India. 2005. Central Pollution Control Board, Ministry of Environment & Forests, Govt of India. 31 December 2011. 30 October 2017. https://web.archive.org/web/20171030180006/http://cpcb.nic.in/newitems/12.pdf. live.
  63. Web site: Evaluation of Operation And Maintenance Of Sewage Treatment Plants in India-2007 . Central Pollution Control Board, Ministry of Environment & Forests . 2008 . 31 December 2011 . 25 October 2011 . https://web.archive.org/web/20111025175456/http://cpcb.nic.in/upload/NewItems/NewItem_99_NewItem_99_5.pdf . live .
  64. Web site: October 2011 . World Energy Outlook 2011: Energy for All . live . https://web.archive.org/web/20180106202628/http://www.iea.org/papers/2011/weo2011_energy_for_all.pdf . 6 January 2018 . 30 December 2011 . International Energy Agency.
  65. Web site: October 7, 2021. Samrat. Sharma. As power woes loom, India's nuclear reactors fail to provide solar-like success. 13 October 2021. India Today. en. 8 October 2021. https://web.archive.org/web/20211008070956/https://www.indiatoday.in/diu/story/as-power-woes-loom-india-s-nuclear-reactors-fail-to-provide-solar-like-success-1862113-2021-10-07. live.
  66. Web site: India Population (Live). 5 December 2020. 9 October 2019. https://web.archive.org/web/20191009150752/https://www.worldometers.info/world-population/india-population/. live.
  67. Web site: Prime Minister to Launch Deendayal Upadhyaya Gram Jyoti Yojana in Patna . Pib.nic.in . 2015-07-25 . 2022-03-31 . 30 January 2016 . https://web.archive.org/web/20160130193824/http://pib.nic.in/newsite/PrintRelease.aspx?relid=123595 . live .
  68. Web site: India says electrified all villages ahead of prime minister's deadline. 29 April 2018. 30 April 2018. https://web.archive.org/web/20180430051155/https://energy.economictimes.indiatimes.com/news/power/india-says-electrified-all-villages-ahead-of-prime-ministers-deadline/63962206. dead.
  69. Web site: Households electrification in India. 21 August 2018. 18 August 2018. https://web.archive.org/web/20180818035625/http://www.saubhagya.gov.in/. live.
  70. Web site: General Review : All India Electricity Statistics (2023). CEA, Govt. of India. 17 May 2024.
  71. Web site: Power sector Dashboard at Glance. Ministry of Power, Govt. of India. 2 December 2020. 18 April 2021. https://web.archive.org/web/20210418003107/https://cea.nic.in/dashboard/?lang=en. live.
  72. Web site: State Overview. NITI Aayog, Govt. of India. 17 February 2022. 16 February 2022. https://web.archive.org/web/20220216221606/https://www.niti.gov.in/edm/#stateOverview. live.
  73. Web site: Consumer wise real Time AP Power Supply Position. 4 July 2016. https://web.archive.org/web/20160619080940/http://www.apvidyutpravah.in/. 19 June 2016. dead.
  74. Web site: BP Statistical Review of world energy, 2016. 15 February 2017. 10 September 2016. https://web.archive.org/web/20160910023428/http://www.bp.com/content/dam/bp/pdf/energy-economics/statistical-review-2016/bp-statistical-review-of-world-energy-2016-electricity.pdf. live.
  75. Refer to Table below
  76. Web site: Monthly operational performance report (page 35), March 2021 . 26 April 2021 . 26 April 2021 . https://web.archive.org/web/20210426091659/https://posoco.in/download/monthly_report_march_2021/?wpdmdl=36647 . live .
  77. Web site: Overview of renewable power generation, CEA . 23 April 2021 . 21 April 2021 . https://web.archive.org/web/20210421153814/https://renewablesindia.in/ . dead .
  78. Web site: Growth of Electricity Sector in India from 1947–2016 . CEA . 17 February 2017 . 17 February 2017 . https://web.archive.org/web/20170217223547/http://www.cea.nic.in/reports/others/planning/pdm/growth_2016.pdf . dead .
  79. Web site: Growth of Electricity Sector in India from 1947–2017 . CEA . 17 February 2018 . 5 August 2017 . https://web.archive.org/web/20170805055701/http://www.cea.nic.in/reports/others/planning/pdm/growth_2017.pdf . dead .
  80. Web site: Growth of Electricity Sector in India from 1947–2018 . CEA . 20 August 2018 . 20 August 2018 . https://web.archive.org/web/20180820140925/http://www.cea.nic.in/reports/others/planning/pdm/growth_2018.pdf . dead .
  81. Web site: Growth of Electricity Sector in India from 1947–2020 . CEA . 15 April 2020 . 16 July 2021 . https://web.archive.org/web/20210716162903/https://cea.nic.in/wp-content/uploads/pdm/2020/12/growth_2020.pdf . live .
  82. Web site: Renewable energy generation data, March 2020 . CEA . 30 December 2020 .
  83. Web site: Energy statistics 2022 . CSO, GoI . 26 January 2022 . 2 February 2022 . https://web.archive.org/web/20220202115000/http://www.indiaenvironmentportal.org.in/files/file/Energy%20Statistics%202022.pdf . live .
  84. Web site: Monthly renewable energy generation report, March 2021 . CEA . 30 April 2021 . 6 May 2021 . https://web.archive.org/web/20210506104245/https://cea.nic.in/wp-content/uploads/resd/2021/03/Monthly%20RE%20generaton%2021.pdf . live .
  85. Web site: Energy statistics India 2023 . CSO, GoI . 14 March 2023 . 14 March 2023 . https://web.archive.org/web/20230314070146/http://www.indiaenvironmentportal.org.in/files/file/EnergyStatisticsIndia2023.pdf . live .
  86. Web site: Monthly Renewable Energy Generation Report, March 2022 . CEA . 1 June 2022 . 17 June 2022 . https://web.archive.org/web/20220617041537/https://cea.nic.in/wp-content/uploads/resd/2022/04/Broad_overview_March_2022.pdf . live .
  87. Web site: Growth of Electricity Sector in India from 1947–2023 . 21 August 2023 . 21 August 2023 . https://web.archive.org/web/20230821232841/http://www.indiaenvironmentportal.org.in/files/file/Growth%20of%20Electricity%20Sector%20in%20India.pdf . live .
  88. Web site: Growth of electricity sector in India, 1947-2024 . 16 August 2024.
  89. Web site: Monthly Report of Renewable Generation, March 2024 . 2 May 2024.
  90. News: 2024-04-09 . Flagging Hydropower Raises India’s Coal Use as Summer Approaches . 2024-04-09 . Bloomberg.com . en.
  91. Web site: Monthly Coal Report, March 2020. 26 April 2020.
  92. Web site: Economics of Coal and Gas Based Energy. Third Wave Solutions. 2012. 7 December 2012. 28 July 2013. https://web.archive.org/web/20130728033551/http://www.thirdwavesolutions.in/index.php/reports-and-opinions/2-uncategorised/14-coal-gas-indian-perspective. live.
  93. Web site: BP Statistical Review of World Energy June 2019. 5 August 2019. 26 December 2019. https://web.archive.org/web/20191226123745/https://www.bp.com/content/dam/bp/business-sites/en/global/corporate/pdfs/energy-economics/statistical-review/bp-stats-review-2019-full-report.pdf. live.
  94. Web site: India's coal import rises 12% to 79 million tonnes in April–July. 3 September 2018. 3 September 2018. https://web.archive.org/web/20180903151034/https://energy.economictimes.indiatimes.com/news/coal/indias-coal-import-rises-12-to-79-million-tonnes-in-april-july/65651369. live.
  95. Web site: Thermal power. Bhati. Priyavrat. 21 March 2016. Down To Earth. 13 March 2016.
  96. Web site: India's energy transition: the cost of meeting air pollution standards in the coal-fired electricity sector. 13 August 2019. 13 August 2019. https://web.archive.org/web/20190813124628/http://www.indiaenvironmentportal.org.in/content/465330/indias-energy-transition-the-cost-of-meeting-air-pollution-standards-in-the-coal-fired-electricity-sector/. live.
  97. Web site: Technical EIA guidance manual for thermal power plants. Ministry of Environment and Forests, Government of India. 2009. 31 December 2011. https://web.archive.org/web/20111125065241/http://moef.nic.in/Manuals/Thermal%20Power.pdf. 25 November 2011. dead.
  98. Web site: Emission norms: How money is the fuel thermal plants lack . 26 March 2018 . 26 March 2018 . 26 March 2018 . https://web.archive.org/web/20180326021608/http://www.financialexpress.com/industry/emission-norms-how-money-is-the-fuel-thermal-plants-lack/1110704/ . live .
  99. News: power tariffs may rise 70 paise per unit as to comply with new set of pollution control norms . The Economic Times . 22 February 2016 . 22 February 2016 . Sengupta . Debjoy . 27 February 2016 . https://web.archive.org/web/20160227002455/http://economictimes.indiatimes.com/industry/energy/power/power-tariffs-may-rise-70-paise-per-unit-as-to-comply-with-new-set-of-pollution-control-norms/articleshow/51087293.cms . live .
  100. Web site: Revised standards for Coal-based Thermal Power Plants. 22 February 2016. 23 March 2016. https://web.archive.org/web/20160323185100/http://www.indiaenvironmentportal.org.in/content/423111/revised-standards-for-coal-based-thermal-power-plants/. live.
  101. Web site: India to set up FGD plants to cut down emissions from 12 gigawatt coal-fired power projects. 26 May 2017. 27 March 2018. https://web.archive.org/web/20180327084646/https://energy.economictimes.indiatimes.com/news/power/india-to-set-up-plants-to-cut-down-emissions-from-122-gigawatt-coal-fired-power-projects/58857751. live.
  102. Web site: Quarterly Review Report – Renovation & Modernisation of Thermal Power Stations, September 2020. 22 December 2020. 6 February 2021. https://web.archive.org/web/20210206044458/https://cea.nic.in/wp-content/uploads/notification/2020/12/TRM_Sep_09_2020.pdf. live.
  103. Web site: Over 42,000 MW thermal power plants have outlived their lives. 22 April 2020. 21 April 2020. https://web.archive.org/web/20200421071401/https://energy.economictimes.indiatimes.com/news/power/over-42000-mw-thermal-power-plants-have-outlived-their-lives/75152875. live.
  104. Web site: India bans petcoke import for use as fuel. 17 August 2018. 17 August 2018. https://web.archive.org/web/20180817225520/https://energy.economictimes.indiatimes.com/news/oil-and-gas/india-bans-petroleum-coke-import-for-use-as-fuel/65439431. live.
  105. Web site: Boom and Bust 2019: Tracking the Global Coal Plant Pipeline. 30 March 2019. 30 March 2019. https://web.archive.org/web/20190330123206/https://energy.economictimes.indiatimes.com/etanalytics/reports/coal/boom-and-bust-2019/637. live.
  106. Web site: Environmental Data of Power sector. CEA, India. 30 August 2023. 18 July 2023. https://web.archive.org/web/20230718013155/https://cea.nic.in/environmental-data-of-power-sector/?lang=en. live.
  107. News: Cabinet nod for flexible domestic coal use to cut costs. The Economic Times. 4 May 2016. 5 May 2016. 5 May 2016. https://web.archive.org/web/20160505200833/http://economictimes.indiatimes.com/industry/energy/power/cabinet-allows-flexible-use-of-domestic-coal-by-power-plants/articleshow/52114519.cms. live.
  108. Web site: India's surging coal imports driven by captive power users. 20 August 2018. 20 August 2018. https://web.archive.org/web/20180820085234/https://energy.economictimes.indiatimes.com/news/coal/opinion-indias-surging-coal-imports-driven-by-captive-power-users/65469527. live.
  109. Web site: India boosts purchases of Indonesian coal as prices drop. 6 September 2018. 7 September 2018. https://web.archive.org/web/20180907032437/https://energy.economictimes.indiatimes.com/news/coal/opinion-india-boosts-purchases-of-indonesian-coal-as-prices-drop/65707411. live.
  110. Web site: India proposes single spot coal auction for all consumers; CIL to export. 22 February 2021. 22 February 2021. https://web.archive.org/web/20210222093244/https://energy.economictimes.indiatimes.com/news/coal/india-proposes-single-spot-coal-auction-for-all-consumers-cil-to-export/81149155. live.
  111. Web site: CO2 EMISSIONS FROM FUEL COMBUSTION HIGHLIGHTS, 2011 Edition. 2011. International Energy Agency, France. 19 January 2012. 2 February 2012. https://web.archive.org/web/20120202035728/http://www.iea.org/co2highlights/co2highlights.pdf. live.
  112. Web site: Details of Retirement of more than 25 years old Coal based Thermal Power Plants (as on 31.03.2018). 6 May 2016. 26 August 2018. https://web.archive.org/web/20180826113646/http://www.cea.nic.in/reports/others/thermal/tppd/repl_thermal_units.pdf. dead.
  113. Web site: The 3Rs of Discom Recovery: Retirement, Renewables and Rationalisation. 4 August 2020. Carbon Tracker Initiative. en-US. 13 September 2020. https://web.archive.org/web/20200913081603/https://climateriskhorizons.com/CRH_3Rs-of-discom-recovery_Final.pdf. dead.
  114. Web site: Retirement of Brahmapuram and Kozhikode diesel power plants. The Economic Times. 6 May 2016. https://web.archive.org/web/20160610011557/http://www.cea.nic.in/reports/news/bdpp_kdpp_retirement.pdf. 10 June 2016. dead.
  115. Web site: India Renewable Integration Study Report. 20 January 2020. 13 May 2020. https://web.archive.org/web/20200513103711/https://posoco.in/reports/india-renewable-integration-study-report/. live.
  116. Web site: Analysis of Ramping Capability of Coal-Fired Generation in India. 20 January 2020. 20 January 2022. https://web.archive.org/web/20220120153853/https://posoco.in/download/analysis-of-ramping-capability-of-coal-fired-generation-in-india/?wpdmdl=23042. live.
  117. Web site: Flexibility Analysis of Thermal Generation for RE Integration in India. 20 January 2020. 1 October 2020. https://web.archive.org/web/20201001223921/https://posoco.in/wp-content/uploads/2020/05/Flexibility-Analysis-of-Thermal-Generation-for-RE-Integration-in-India-1.pdf. live.
  118. Web site: Pages 11 & 13, Operational Feedback on Transmission Constraints (Jul – Sep 2020). 20 January 2020. 31 January 2021. https://web.archive.org/web/20210131071952/https://posoco.in/download/nldc-operational-feedback_oct_2020_final/?wpdmdl=32657. live.
  119. Web site: Night Mode operation (Trial) of PV Inverters. 29 January 2022. 27 January 2022. https://web.archive.org/web/20220127123118/https://srldc.in/UploadFiles/NewsAndUpdate/SRLDC%20Report%20on%20Night%20Mode%20Operation%20(Trial)%20of%20PV%20Inverters%20%20at%20Pavagada%20Ultra%20Mega%20Solar%20Park.pdf. dead.
  120. Web site: Inertia and the Power Grid: A Guide Without the Spin. NREL. 25 March 2023. 10 May 2023. https://web.archive.org/web/20230510193415/https://www.nrel.gov/docs/fy20osti/73856.pdf. live.
  121. Web site: How grid-forming inverters will enable continuing growth of solar and grid reliability. 5 March 2024. 12 February 2024. https://web.archive.org/web/20240212194326/https://www.solarpowerworldonline.com/2024/02/how-grid-forming-inverters-will-enable-continuing-growth-of-solar-and-grid-reliability/. live.
  122. Web site: SBI chairman says no future for gas-based power plants in the country. 4 January 2019. 4 January 2019. https://web.archive.org/web/20190104231211/https://energy.economictimes.indiatimes.com/news/oil-and-gas/sbi-chairman-says-no-future-for-gas-based-power-plants-in-the-country/67384877. live.
  123. Web site: HC stays ONGC tender, e-auction of natural gas from KG-basin till June 4 . 22 May 2021 . 21 May 2021 . https://web.archive.org/web/20210521235156/https://energy.economictimes.indiatimes.com/news/oil-and-gas/hc-stays-ongc-tender-e-auction-of-natural-gas-from-kg-basin-till-june-4/82831152 . live .
  124. Web site: Growing India Becomes Major LNG Player. 17 June 2015. 22 June 2015. https://web.archive.org/web/20150622210144/http://oilprice.com/Energy/Natural-Gas/Growing-India-Becomes-Major-LNG-Player.html. live.
  125. Web site: Page 71 of World LNG Report – 2015 Edition. 17 June 2015. 21 June 2015. https://web.archive.org/web/20150621164659/http://igu.org/sites/default/files/node-page-field_file/IGU-World%20LNG%20Report-2015%20Edition.pdf. dead.
  126. Web site: Stranded power units may get imported gas at subsidised rates. 3 January 2019. 3 January 2019. https://web.archive.org/web/20190103210300/https://energy.economictimes.indiatimes.com/news/power/stranded-power-units-may-get-imported-gas-at-subsidised-rates/67360804. live.
  127. Web site: Imported LNG scheme ineffective for gas-based plants: India Ratings. The Times of India. 17 June 2015. 10 January 2016. https://web.archive.org/web/20160110012632/http://timesofindia.indiatimes.com/business/india-business/Imported-LNG-scheme-ineffective-for-gas-based-plants-India-Ratings/articleshow/47603054.cms. live.
  128. News: Coal gas can help lower import bill by $10 billion in 5 years: Coal Secy. Business Standard India. 5 March 2017. 5 March 2017. Press Trust of India. 5 March 2017. https://web.archive.org/web/20170305153139/http://www.business-standard.com/article/economy-policy/coal-gas-can-help-lower-import-bill-by-10-billion-in-5-years-coal-secy-117030500463_1.html. live.
  129. Web site: Chinese firm plans Thar coal mining in Pakistan. 25 August 2014. 27 August 2014. https://web.archive.org/web/20140827081425/http://www.steelguru.com/raw_material_news/Chinese_firm_plans_Thar_coal_mining_in_October/273972.html. live.
  130. Web site: Reliance Jamnagar coal gasification project. 15 January 2017. 18 January 2017. https://web.archive.org/web/20170118053312/http://gasification2016.missionenergy.org/presentation/ril.pdf. live.
  131. Web site: GAIL, Coal India in pact to expand Dankuni gas project. 25 August 2014. 26 August 2014. https://web.archive.org/web/20140826115153/http://www.thehindubusinessline.in/2004/02/15/stories/2004021501330200.htm. live.
  132. Web site: China's synthetic natural gas revolution . 5 March 2017 . 12 March 2017 . https://web.archive.org/web/20170312032338/http://www.edwardtdodge.com/wp-content/uploads/2013/10/Jackson_Duke_China_SNG_opinion_2013.pdf . live .
  133. Web site: Conversion of Coal to Substitute Natural Gas (SNG) . 6 August 2014 . 24 July 2015 . https://web.archive.org/web/20150724110458/http://www.hceco.com/HCEI105001.pdf . live .
  134. Web site: Step Off the Gas (page 49) . 10 June 2021 . 9 June 2021 . https://web.archive.org/web/20210609190600/http://www.indiaenvironmentportal.org.in/files/file/step%20off%20the%20gas.pdf . dead .
  135. Web site: Overview of power generation, March 2022, CEA. 14 May 2022. 28 August 2022. https://web.archive.org/web/20220828075249/https://npp.gov.in/public-reports/cea/monthly/generation/18%20col%20ten/2022/MAR//18%20col%20ten-1_2022-MAR.pdf. live.
  136. Web site: NPCIL Annual Report, 2009–2010 . 2010 . Nuclear Power Corporation of India Limited . 1 January 2012 . 4 January 2012 . https://web.archive.org/web/20120104184822/http://npcil.nic.in/main/CompanyProfile.aspx . live .
  137. Web site: NPCIL Annual Report, 2010–2011 . 2011 . Nuclear Power Corporation of India Limited . 6 April 2016 . 18 June 2016 . https://web.archive.org/web/20160618235544/http://npcil.nic.in/pdf/Corporate_Profile_English_Hindi.pdf . live .
  138. News: Kudankulam units 3, 4 cost more than doubles over liability issues. 3 December 2014. The Hindu. 29 September 2019. PTI. en-IN. 0971-751X. 20 April 2021. https://web.archive.org/web/20210420203310/https://www.thehindu.com/news/national/Kudankulam-units-3-4-cost-more-than-doubles-over-liability-issues/article10928559.ece. live.
  139. News: Panel sought to look into snags at Kudankulam plant. 25 April 2019. The Hindu. 29 September 2019. en-IN. 0971-751X. 7 November 2020. https://web.archive.org/web/20201107232417/https://www.thehindu.com/news/national/tamil-nadu/panel-sought-to-look-into-snags-at-kudankulam-plant/article26937239.ece. live.
  140. Web site: World Nuclear Industry Status Report (page 296). 2020. 28 September 2020. 27 September 2020. https://web.archive.org/web/20200927133711/https://www.worldnuclearreport.org/IMG/pdf/wnisr2020_lr.pdf. live.
  141. Web site: Kakrapar 3 to begin commercial operation this year, minister says. 28 August 2022. 28 August 2022. https://web.archive.org/web/20220828075247/https://www.world-nuclear-news.org/Articles/Kakrapar-3-to-begin-commercial-operation-this-year. live.
  142. Web site: India Steps Up Uranium Exploration After Record Discovery . The Wall Street Journal . 21 July 2011 . 3 August 2017 . 18 December 2017 . https://web.archive.org/web/20171218124806/https://www.wsj.com/articles/SB10001424053111903461104576459323026021378 . live .
  143. Web site: Which state is the largest producer of uranium in India?. 20 August 2018. Answers. en-US. 29 September 2019. 29 September 2019. https://web.archive.org/web/20190929225523/https://www.mapsofindia.com/answers/india/state-largest-producer-uranium-india/. live.
  144. News: Way forward agreed for Jaitapur reactors . . 12 March 2018 . 6 February 2019 . 9 June 2019 . https://web.archive.org/web/20190609130428/http://www.world-nuclear-news.org/NN-Way-forward-agreed-for-Jaitapur-reactors-1203187.html . live .
  145. Web site: Nuclear Power in India . 29 July 2015 . 28 January 2016 . https://web.archive.org/web/20160128093725/http://www.world-nuclear.org/info/Country-Profiles/Countries-G-N/India/ . dead .
  146. Web site: Physical Progress (Achievements). Ministry of New and Renewable Energy, Govt. of India. 13 June 2021. 12 April 2020. https://web.archive.org/web/20200412175123/https://mnre.gov.in/the-ministry/physical-progress. live.
  147. Web site: World Energy Resources Hydro Power, 2016 . World Energy Council . 30 November 2017 . 6 August 2018 . https://web.archive.org/web/20180806115611/https://www.worldenergy.org/wp-content/uploads/2017/03/WEResources_Hydropower_2016.pdf . dead .
  148. Web site: Interactive map showing the feasible locations of PSS projects in India . 19 November 2019 . 3 June 2020 . https://web.archive.org/web/20200603022914/https://nationalmap.gov.au/renewables/#share=s-oDPMo1jDBBtwBNhD . live .
  149. Web site: Prime Minister Modi stated that J&K state could alone provide power to the whole of India . 22 June 2019 . 24 June 2019 . https://web.archive.org/web/20190624060017/https://kashmirobserver.net/2019/feature/water-wars-and-hydro-diplomacy-44157 . dead .
  150. Web site: Energy Storage: Connecting India to Clean Power on Demand . 28 December 2023 . 29 December 2023 . https://web.archive.org/web/20231229035654/https://ieefa.org/sites/default/files/2023-12/Energy%20Storage_Dec23.pdf . live .
  151. Web site: Solar storage tariff spells trouble for coal . 10 February 2020 . 13 February 2020 . https://web.archive.org/web/20200213152934/https://energy.economictimes.indiatimes.com/news/renewable/solar-storage-tariff-spells-trouble-for-coal/74054463 . live .
  152. Hydropower Development in India: A Sector Assessment
  153. Web site: India's renewables revolution needs what other countries are fast adopting: water battery . 11 October 2019 . 11 November 2019 . https://web.archive.org/web/20191111153020/https://theprint.in/opinion/indias-renewables-revolution-needs-what-other-countries-are-fast-adopting-water-battery/317267/ . live .
  154. Web site: DOE Global Energy Storage Database . 23 May 2017 . 15 November 2014 . https://web.archive.org/web/20141115123502/http://www.energystorageexchange.org/projects . dead .
  155. Web site: Pump Storage Development in India, CEA . 23 June 2017 . 3 September 2017 . https://web.archive.org/web/20170903182633/http://www.cea.nic.in/monthlyhepr.html . dead .
  156. Web site: Pumped storage hydropower plant . 27 August 2014 . dead . https://web.archive.org/web/20140707211619/http://npti.in/Download/Hydro/Pumped%20Storage%20Hydro%20Power%20Plant%2C%20Electrical%20India%2C%20Nov%2C%202013.pdf . 7 July 2014 .
  157. Web site: The changing role of hydropower: Challenges and opportunities . 3 March 2023 . 2 March 2023 . https://web.archive.org/web/20230302221922/http://www.indiaenvironmentportal.org.in/files/file/changing%20role%20of%20hydropower.pdf . live .
  158. Web site: Solar . Ministry of New and Renewable Energy, Govt. of India . 21 February 2014 . https://web.archive.org/web/20140225160014/http://www.mnre.gov.in/schemes/grid-connected/solar/ . 25 February 2014 . dead .
  159. Web site: 5 MW Solar Power Energy Plant in India: Profit, Cost & Land Requirement . 30 July 2023 . 21 August 2023 . https://web.archive.org/web/20230821205007/https://www.waaree.com/blog/5-mw-solar-power-plant-in-india . live .
  160. Web site: Wastelands Atlas of India, 2011 . 30 May 2014 . 5 June 2016 . https://web.archive.org/web/20160605175835/http://dolr.nic.in/dolr/wasteland_atlas.asp . dead .
  161. Web site: This Gujarat village is harvesting a sunny crop . 3 August 2016 . 9 August 2016 . https://web.archive.org/web/20160809022419/http://energy.economictimes.indiatimes.com/news/renewable/this-gujarat-village-is-harvesting-a-sunny-crop/53473954? . live .
  162. Web site: How the world's largest solar park is shaping up in Karnataka . 5 March 2017 . 7 March 2017 . https://web.archive.org/web/20170307050202/http://www.livemint.com/Industry/UEJYwZQT5m3wNvGupBShZJ/How-the-worlds-largest-solar-park-is-shaping-up-in-Karnatak.html . live .
  163. Web site: Population Pyramid of India. PopulationPyramid.net. 29 July 2015. 12 August 2015. https://web.archive.org/web/20150812102522/http://populationpyramid.net/india/. live.
  164. Web site: Why India's Solar Power Tariffs Reached a Historic Low . 1 December 2020 . 10 March 2022 . https://web.archive.org/web/20220310145420/http://www.indiaenvironmentportal.org.in/files/file/Why%20Solar%20Power%20Tariffs%20in%20India%20Reached%20an%20Historic%20Low.pdf . dead .
  165. News: How Low Did It Go: 5 Lowest Solar Tariffs Quoted in 2018 . 9 January 2018 . 10 January 2019 . https://web.archive.org/web/20190110073924/https://mercomindia.com/lowest-solar-tariffs-quoted-2018/ . live .
  166. Web site: ACWA Power And Masdar Submit Bids For Mohammed bin Rashid Al Maktoum Solar Park Phase 6. 9 June 2023. 8 June 2023. https://web.archive.org/web/20230608201040/https://solarquarter.com/2023/06/08/acwa-power-and-masdar-submit-bids-for-mohammed-bin-rashid-al-maktoum-solar-park-phase-6/. live.
  167. Web site: India Unable to Compete With Record Low Solar Tariffs in Gulf Region. 28 August 2020. 28 June 2021. https://web.archive.org/web/20210628044346/https://ieefa.org/wp-content/uploads/2020/08/India-Unable-to-Compete-with-Record-Low-Solar-Tariffs_August-2020.pdf. live.
  168. Web site: Solar canals prove to be good for the environment but not for business. Mongabay. 6 July 2023. 5 July 2023. https://web.archive.org/web/20230705140735/https://india.mongabay.com/2023/07/solar-canals-prove-to-be-good-for-the-environment-but-not-for-business/. live.
  169. Web site: The 'solar canals' making smart use of India's space. BBC. 3 August 2020. 4 August 2020. https://web.archive.org/web/20200804033601/https://www.bbc.com/future/article/20200803-the-solar-canals-revolutionising-indias-renewable-energy. live.
  170. Web site: India's Building A Huge Floating Solar Farm – INDIAN POWER SECTOR. 29 July 2015. 10 January 2016. https://web.archive.org/web/20160110012632/http://indianpowersector.com/home/2014/07/indias-building-a-huge-floating-solar-farm/. dead.
  171. Web site: Central Water Commission. 29 July 2015. 10 June 2016. https://web.archive.org/web/20160610083346/http://www.cwc.nic.in/main/webpages/statistics.html#2. dead.
  172. Web site: Multipurpose Freshwater Coastal Reservoirs and Their Role in Mitigating Climate Change. 23 May 2023. 11 June 2023. https://web.archive.org/web/20230611114313/https://www.ijee.latticescipub.com/wp-content/uploads/papers/v3i1/A1842053123.pdf. live.
  173. Web site: Composite water management index (page 187). 14 July 2020. 25 February 2020. https://web.archive.org/web/20200225104821/http://niti.gov.in/sites/default/files/2019-08/CWMI-2.0-latest.pdf. live.
  174. News: Brown . Lester R. . 19 November 2013 . India's dangerous 'food bubble' . Los Angeles Times . https://web.archive.org/web/20131218120818/http://articles.latimes.com/2013/nov/29/opinion/la-oe-brown-india-food-bubble-famine-20131129 . 18 December 2013 . live . 13 July 2014 . Alt URL
  175. Web site: Blue Book of China’s Concentrating Solar Power Industry 2023. 6 March 2024. 8 March 2024. https://web.archive.org/web/20240308125000/https://www.solarpaces.org/wp-content/uploads/2024/02/Blue-Book-of-Chinas-Concentrating-Solar-Power-Industry-2023.pdf. live.
  176. Web site: Wind power potential. Ministry of New and Renewable Energy. 7 November 2021. 7 November 2021. https://web.archive.org/web/20211107040735/https://mnre.gov.in/wind/current-status/. live.
  177. Web site: 'Evaluation of Wind Energy in India. Parliament of India. 27 June 2022. 5 August 2022. https://web.archive.org/web/20220805001440/http://www.indiaenvironmentportal.org.in/files/file/evaluation%20of%20wind%20energy%20in%20india.pdf. live.
  178. Web site: India’s Wind Potential Atlas at 120m agl. National Institute Of Wind Energy. 16 May 2024.
  179. Web site: Installed capacity of wind power projects in India. 7 April 2018. 19 May 2019. https://web.archive.org/web/20190519125420/http://www.indianwindpower.com/news_views.php#tab1. live.
  180. Web site: Wind power tariff firms at Rs 2.5 per unit in SECI auction . 6 April 2018 . 6 April 2018 . https://web.archive.org/web/20180406222508/https://energy.economictimes.indiatimes.com/news/renewable/wind-power-tariff-firms-at-rs-2-5-per-unit-in-seci-auction/63645317 . live .
  181. Web site: Startup bets wood can make wind turbines even greener. Bloomberg. 25 March 2023. 7 November 2023. https://web.archive.org/web/20231107072815/https://energy.economictimes.indiatimes.com/news/renewable/startup-bets-wood-can-make-wind-turbines-even-greener/104124979#:~:text=Rather%2C%20startup%20Modvion%20AB%20is%20building%20the%20tower,supplying%20clean%20energy%20to%20local%20homes%20and%20factories.. live.
  182. Web site: We build wind turbine towers In wood. 31 March 2023. 30 March 2023. https://web.archive.org/web/20230330121444/https://modvion.com/. live.
  183. Web site: Going global: Expanding Offshore Wind to Emerging Markets. October 2019. 8 September 2022. 11 February 2023. https://web.archive.org/web/20230211043240/https://openknowledge.worldbank.org/bitstream/handle/10986/32801/Going-Global-Expanding-Offshore-Wind-To-Emerging-Markets.pdf?sequence=5&isAllowed=y. live.
  184. Web site: Strategy for Establishment of Offshore Wind Energy Projects . 29 September 2023 . 4 October 2023 . https://web.archive.org/web/20231004214333/http://www.indiaenvironmentportal.org.in/files/file/Strategy%20for%20Establishment%20of%20Offshore%20Wind%20Energy%20Projects.pdf . live .
  185. Web site: Carbon Neutral Fuels and Chemicals from Standalone Biomass Refineries. 3 December 2023. 3 December 2023. https://web.archive.org/web/20231203012005/https://www.ijee.latticescipub.com/wp-content/uploads/papers/v3i2/B1845113223.pdf. live.
  186. Web site: NTPC's Dadri plant generates power from agricultural waste. 20 January 2019. 20 January 2019. https://web.archive.org/web/20190120194553/https://energy.economictimes.indiatimes.com/news/power/ntpcs-dadri-plant-generates-power-from-agricultural-waste/67608613. live.
  187. Web site: Biomass for power generation and CHP. International Energy Agency. 2007. 1 January 2012. https://web.archive.org/web/20111103173849/http://iea.org/techno/essentials3.pdf. 3 November 2011. dead.
  188. Web site: Maharashtra, Punjab top producers of green energy from farm waste . https://web.archive.org/web/20150831190140/http://www.hindustantimes.com/india-news/maharashtra-punjab-top-producers-of-green-energy-from-farm-waste/article1-1385893.aspx. dead. 31 August 2015. 31 August 2015.
  189. Web site: Biomass potential in India. 31 August 2018. 27 September 2018. https://web.archive.org/web/20180927050528/https://biomasspower.gov.in/biomass-info-asa-fuel-resources.php. dead.
  190. Web site: India was the third-largest energy consumer in 2013. 29 July 2016. 18 January 2017. https://web.archive.org/web/20170118101355/http://www.eia.gov/beta/international/analysis.cfm?iso=IND&src=home-b6. live.
  191. Web site: Delhi's Air Quality Could Improve 90% If Stubble-Burn In Fields Is Stopped. 17 October 2017. 20 October 2017. 20 October 2017. https://web.archive.org/web/20171020072844/http://www.indiaspend.com/special-reports/delhis-air-quality-could-improve-90-if-stubble-burn-in-fields-is-stopped-77532. dead.
  192. Web site: Torrefied Biomass: Available, Efficient, CO2 Neutral and Economic – likely the best solid biomass on the market. 20 October 2016. 6 April 2017. 7 April 2017. https://web.archive.org/web/20170407054806/http://www.biofuelsdigest.com/bdigest/2016/10/20/torrefied-biomass-available-efficient-co2-neutral-and-economic-likely-the-best-solid-biomass-on-the-market/. live.
  193. Web site: Cofiring of biomass in coal-fired power plants – European experience. 18 September 2014. https://web.archive.org/web/20161012153412/http://www.iea-coal.org.uk/documents/83524/9188/Henderson---Cofiring-of-biomass-in-coal-fired-power-plants-%E2%80%93-European-experience. 12 October 2016. dead.
  194. News: CEA has written to all States to use 5–10% of biomass pellets with coal for power generation in thermal power plants. Business Standard India. 8 February 2018. 22 February 2018. 6 April 2023. https://web.archive.org/web/20230406222951/https://www.business-standard.com/article/government-press-release/cea-has-written-to-all-states-to-use-5-10-of-118020801216_1.html. live.
  195. Web site: India, Sweden discuss tech solutions to reduce industrial emissions . 3 December 2019 . 4 December 2019 . https://web.archive.org/web/20191204134137/https://www.gadgetsnow.com/tech-news/india-sweden-discuss-tech-solutions-to-reduce-industrial-emissions/articleshow/72353272.cms . live .
  196. Web site: NTPC invites bids for procurement of agro Residue for its Dadri power plant . 8 February 2018 . 8 February 2018 . https://web.archive.org/web/20180208084307/https://energy.economictimes.indiatimes.com/news/power/ntpc-invites-bids-for-procurement-of-agro-residue-for-its-dadri-power-plant/62832238 . live .
  197. Web site: CEA releases policy to promote power generation from paddy straw. 24 November 2017. 25 November 2017. 28 November 2017. https://web.archive.org/web/20171128185334/http://www.dnaindia.com/india/report-cea-releases-policy-to-promote-power-generation-from-paddy-straw-2562162. live.
  198. Web site: Air Pollution: Delhi sees hope as NTPC steps in to buy crop residue from farmers. 21 September 2017. 25 September 2017. 28 May 2023. https://web.archive.org/web/20230528033818/https://www.hindustantimes.com/delhi-news/pollution-delhi-gets-whiff-of-hope-as-ntpc-steps-in-to-buy-crop-residue-from-farmers/story-nmfwHl5bDCgdi5ImQPtNQM.html. live.
  199. Web site: Domestic REC Market. 6 April 2018. 28 March 2018. https://web.archive.org/web/20180328082434/http://biomasspower.gov.in/biomass-domestic-REC-market.php. dead.
  200. Web site: Renewable purchase obligations enforcement is not our remit: Power regulator. 18 February 2013 . 6 April 2017.
  201. News: NTPC adopts sustainable measures to curb pollution. The Economic Times. 6 January 2020. Sengupta. Debjoy. 25 May 2020. https://web.archive.org/web/20200525182552/https://economictimes.indiatimes.com/industry/energy/power/ntpc-adopts-sustainable-measures-to-curb-pollution/articleshow/73086545.cms. live.
  202. Web site: Overview of Wood Pellet Co-firing. 26 February 2017. 27 February 2017. https://web.archive.org/web/20170227062520/http://www.biomasscofiring.ca/images/stories/PDFs/WoodPelletCo-firingOverviewFutureMetrics.pdf. dead.
  203. Web site: Can biomass co-firing offer a viable solution to coal shortage and stubble burning? . 9 March 2022 . 8 March 2022 . https://web.archive.org/web/20220308205007/https://www.downtoearth.org.in/blog/energy/can-biomass-co-firing-offer-a-viable-solution-to-coal-shortage-and-stubble-burning--79792 . live .
  204. Web site: Revised Biomass Policy dtd 8 October 2022 . 9 March 2022 . 8 March 2022 . https://web.archive.org/web/20220308211006/https://powermin.gov.in/sites/default/files/Revised_Biomass_Policy_dtd_08102021.pdf . dead .
  205. Web site: Compressed biogas to beat petrol and diesel with 30% higher mileage . 18 November 2018 . 18 November 2018 . https://web.archive.org/web/20181118122934/https://energy.economictimes.indiatimes.com/news/oil-and-gas/compressed-biogas-to-beat-petrol-and-diesel-with-30-higher-mileage/66675432 . live .
  206. Web site: Review of Implementation of CBG (SATAT) . 8 January 2022 . 9 January 2023 . https://web.archive.org/web/20230109120159/http://www.indiaenvironmentportal.org.in/files/file/Review%20of%20Implementation%20of%20CBG.pdf . live .
  207. Web site: BioProtein Production . 31 January 2018 . https://web.archive.org/web/20170510151825/http://www.ntva.no/wp-content/uploads/2014/01/04-huslid.pdf . 10 May 2017 . dead .
  208. Web site: Food made from natural gas will soon feed farm animals – and us. Le Page. Michael. 10 November 2016. New Scientist. 31 January 2018. 12 December 2019. https://web.archive.org/web/20191212070800/https://www.newscientist.com/article/2112298-food-made-from-natural-gas-will-soon-feed-farm-animals-and-us/. live.
  209. Web site: New venture selects Cargill's Tennessee site to produce Calysta FeedKind® Protein . 31 January 2018 . 30 December 2019 . https://web.archive.org/web/20191230182858/https://www.cargill.com/2016/new-venture-selects-cargill-tennessee-to-produce-feedkind . live .
  210. Web site: Algenol and Reliance launch algae fuels demonstration project in India . 29 May 2017 . 1 July 2017 . https://web.archive.org/web/20170701001900/http://www.greencarcongress.com/2015/01/20150121-algenol.html#more . live .
  211. Web site: ExxonMobil Announces Breakthrough In Renewable Energy . 20 June 2017 . 20 June 2017 . https://web.archive.org/web/20170620095750/http://oilprice.com/Latest-Energy-News/World-News/ExxonMobil-Announces-Breakthrough-In-Renewable-Energy.html . live .
  212. Web site: Assessment of environmental impact of FeedKind protein . 20 June 2017 . 2 August 2019 . https://web.archive.org/web/20190802163726/https://www.carbontrust.com/media/672719/calysta-feedkind.pdf . dead .
  213. Web site: India, Biofuels Annual 2011. July 2011. United States Department of Agriculture: Global Agricultural Information Network. 1 January 2012. 15 February 2017. https://web.archive.org/web/20170215022227/https://gain.fas.usda.gov/Recent%20GAIN%20Publications/Biofuels%20Annual_New%20Delhi_India_7-1-2011.pdf. dead.
  214. Web site: Indrapratha Gas, Mahindra & Mahindra join hands to stop stubble burning. 20 February 2018. 29 May 2023. https://web.archive.org/web/20230529094543/https://energy.economictimes.indiatimes.com/news/oil-and-gas/indrapratha-gas-mahindra-mahindra-join-hands-to-stop-stubble-burning/62986917. live.
  215. Web site: Modi govt plans Gobar-Dhan scheme to convert cattle dung into energy. 22 February 2018. 5 April 2023. https://web.archive.org/web/20230405133927/https://energy.economictimes.indiatimes.com/news/oil-and-gas/modi-govt-plans-gobar-dhan-scheme-to-convert-cattle-dung-into-energy/63028408. live.
  216. Web site: Year End Review – 2011. Press Information Bureau, Government of India. December 2011. 1 January 2012. 10 January 2016. https://web.archive.org/web/20160110012632/http://pib.nic.in/newsite/pmreleases.aspx?mincode=28. live.
  217. Web site: Greenko, Acme, Reliance among winners of SECI's green hydrogen manufacturing auction. 2 January 2024. 6 January 2024. 6 January 2024. https://web.archive.org/web/20240106112151/https://www.mercomindia.com/greenko-acme-reliance-winners-secis-green-hydrogen-auction. live.
  218. Web site: R&D roadmap for hydrogen ecosystem in India. Ministry of New and renewable energy, India. July 2023. 6 July 2023. 7 July 2023. https://web.archive.org/web/20230707162242/http://www.indiaenvironmentportal.org.in/files/file/green%20hydrogen%20ecosystems%20in%20india.pdf. live.
  219. https://web.archive.org/web/20131123021902/http://greencleanguide.com/2013/07/20/geothermal-energy-and-its-potential-in-india Geothermal Energy and its Potential in India | For the Changing Planet
  220. Web site: Geothermal fields of India. 2001. Geological Survey of India. 1 January 2012. 27 July 2017. https://web.archive.org/web/20170727031227/http://www.portal.gsi.gov.in/portal/page?_pageid=127,699645&_dad=portal&_schema=PORTAL. dead.
  221. Web site: Rishav. Shubham. Ladakh to get India's first Geothermal Project. Renewable Energy 2050. 4 March 2021. 24 July 2021. https://web.archive.org/web/20210724053748/https://renewableenergy2050.com/news/ladakh-to-get-indias-first-geothermal-project/. dead.
  222. Web site: Development of 3.75 MW Durgaduani Mini Tidal Power Project, Sunderbans, West Bengal. December 2011. NHPC Limited – A Government of India Enterprise. 2 January 2012. https://web.archive.org/web/20120407095242/http://www.nhpc.gov.in/english/Scripts/RDgeothermal.aspx. 7 April 2012. dead.
  223. Web site: Tidal Energy in India. 2008. Energy Alternatives India. 2 January 2012. 1 January 2012. https://web.archive.org/web/20120101080534/http://www.eai.in/ref/ae/oce/oce.html. live.
  224. Web site: Survey of Energy Resources. 2007. World Energy Council. 575–576. 2 January 2012. https://web.archive.org/web/20111125063241/http://worldenergy.org/documents/otec_country_notes.pdf. 25 November 2011. dead.
  225. Web site: National Electricity Plan – Transmission (page 239). Central Electricity Authority. 3 March 2019. 7 March 2019. https://web.archive.org/web/20190307173921/http://www.cea.nic.in/reports/others/ps/pspa2/nep_transmission.pdf. dead.
  226. Web site: Progress of Substations in the Country up to Jan-21. Central Electricity Authority. 14 March 2021. 11 March 2022. https://web.archive.org/web/20220311035620/https://cea.nic.in/wp-content/uploads/transmission/2021/01/Growth_summary_ss.pdf. live.
  227. Web site: Progress of Transmission Sector in the Country up to Jan-21. Central Electricity Authority. 14 March 2021. 11 March 2022. https://web.archive.org/web/20220311035622/https://cea.nic.in/wp-content/uploads/transmission/2021/01/Growth_summary_tx.pdf. live.
  228. the ratio to be multiplied with transmission line capacity (MVA) to give average installed length of transmission line per one MVA of installed substation capacity at each voltage level.
  229. Web site: Electricity Transmission, USA . Institute for Energy Research . 2 September 2014 . 31 May 2015 . 11 June 2015 . https://web.archive.org/web/20150611001622/http://instituteforenergyresearch.org/electricity-transmission/ . live .
  230. Understanding electrical traffic jams in the power grid. 2022 . 10.1038/s44172-022-00028-1 . l. Vinay . Miranda . Communications Engineering . 1 . 1 . 31 . 2022CmEng...1...31V . 253259828 . free . 10956019 .
  231. Web site: May 2019 Monthly report (page 17), National load dispatch center, Ministry of Power, Government of India . 8 July 2019 . 5 August 2021 . https://web.archive.org/web/20210805051907/https://posoco.in/download/monthly_report_may_2019/?wpdmdl=23659 . live .
  232. News: Enough transmission capacity till 2022, CEA . The Economic Times . 3 January 2017 . 3 January 2017 . Singh . Sarita . 3 January 2017 . https://web.archive.org/web/20170103072157/http://economictimes.indiatimes.com/industry/energy/power/enough-transmission-capacity-till-2022-cea/articleshow/56302012.cms . live .
  233. Web site: Power Transmission Maps of India, CEA, Government of India. 7 October 2015. 17 October 2015. https://web.archive.org/web/20151017100527/http://www.cea.nic.in/powermaps.html. dead.
  234. Web site: Govt accepts expert panel report on smart electricity transmission system in India . 11 March 2023 . 11 March 2023 . https://web.archive.org/web/20230311014227/https://energy.economictimes.indiatimes.com/news/power/govt-accepts-expert-panel-report-on-smart-electricity-transmission-system-in-india/98476487 . live .
  235. Web site: Modification to existing transmission lines to double the capacity. 9 June 2015. 10 June 2015. https://web.archive.org/web/20150610054746/http://economictimes.indiatimes.com/industry/energy/power/no-central-help-to-debt-ridden-state-run-power-discoms-piyush-goyal/articleshow/47579813.cms. live.
  236. Web site: Financial indicators, UDAY dash board . 25 April 2018 . 25 April 2018 . https://web.archive.org/web/20180425183454/https://www.uday.gov.in/home.php . live .
  237. Web site: AT& C Losses in Power Distribution . 9 June 2015 . https://web.archive.org/web/20150528233852/http://www.sari-energy.org/PageFiles/What_We_Do/activities/Afghan_Capacity_Building_Program_Aug_09/Engnieer's_Training_of_Trainers/Presentations/English/Week_1-23rd_to_27th_Nov/Naveen_Kapoor_-_26th_Nov_1.pdf . 28 May 2015 . dead .
  238. Web site: U.S. electricity flow, 2018 . 25 April 2019 . 10 May 2019 . https://web.archive.org/web/20190510180223/https://www.eia.gov/totalenergy/data/monthly/pdf/flow/electricity.pdf . live .
  239. Web site: Grid Security – Need For Tightening of Frequency Band & Other Measures. Central Electricity Regulatory Commission. 2 December 2016. 21 September 2018. https://web.archive.org/web/20180921103332/http://www.cercind.gov.in/2011/Whats-New/AGENDA_NOTE_FOR_15TH_CAC_MEETINGHI.pdf. live.
  240. Web site: Bhaskar. Utpal. India is now one nation, one grid. Livemint. 2 December 2016. 1 January 2014. 2 December 2016. https://web.archive.org/web/20161202234639/http://www.livemint.com/Politics/jIOljqqvinQqqngk7BYLZP/Southern-transmission-line-connected-to-National-Grid.html. live.
  241. News: Talks on to set up grid interconnection with Singapore and UAE: Minister R K Singh . The Economic Times . 16 August 2023 . 19 August 2023 . 19 August 2023 . https://web.archive.org/web/20230819030516/https://economictimes.indiatimes.com/industry/energy/power/talks-on-to-set-up-grid-interconnection-with-singapore-and-uae-minister-r-k-singh/articleshow/102777993.cms . live .
  242. Web site: Page 37, Monthly operation report, July 2022 . POSOCO, Govt. of India . July 2022 . 1 September 2022 . 1 September 2022 . https://web.archive.org/web/20220901072201/https://posoco.in/download/monthly_report_jul_2022/?wpdmdl=46989 . live .
  243. Web site: India To Export Another 500 MW Power To Bangladesh In Next 12 Months: NLDC. 15 July 2015. 22 July 2015. https://web.archive.org/web/20150722014252/http://www.business-standard.com/article/news-cm/india-to-export-another-500-mw-power-to-bangladesh-in-next-12-months-nldc-115071400538_1.html. live.
  244. Web site: Archived copy . 2 December 2016 . 2 December 2016 . https://web.archive.org/web/20161202234856/https://brage.bibsys.no/xmlui/bitstream/id/419902/14083_FULLTEXT.pdf . dead .
  245. Web site: Prospect of a SAARC Power Grid – South Asia Journal . 2 December 2016 . 18 September 2016 . https://web.archive.org/web/20160918202944/http://southasiajournal.net/prospect-of-a-saarc-power-grid/ . dead .
  246. Web site: Bangladesh looks to increase power import from India . 17 August 2018 . 17 August 2018 . https://web.archive.org/web/20180817195255/https://energy.economictimes.indiatimes.com/news/power/bangladesh-looks-to-increase-power-import-from-india/65441365 . dead .
  247. Web site: Operational Performance Report for the month of March, 2024. POSOCO, India. 25 April 2024.
  248. Web site: Explainer: All about the One Sun One World One Grid initiative. 14 November 2021. 24 December 2022. 24 December 2022. https://web.archive.org/web/20221224034031/https://www.thehindubusinessline.com/blexplainer/bl-explainer-all-about-the-one-sun-one-world-one-grid-initiative/article37486937.ece. live.
  249. Web site: Saudi Arabia, India to lay 1,600 km long underwater cable. 23 March 2023. 22 March 2023. https://web.archive.org/web/20230322224304/https://www.oilandgasmiddleeast.com/partnership-0/saudi-arabia-india-to-lay-1600-km-long-underwater-cable. live.
  250. Web site: US backs India-UK led solar Green Grids Initiative launched by PM at COP26. 24 December 2022. May 2020. 17 December 2022. https://web.archive.org/web/20221217112215/https://www.business-standard.com/article/current-affairs/us-backs-india-uk-led-solar-green-grids-initiative-launched-by-pm-at-cop26-121110700470_1.html. live.
  251. Web site: India loses $86 billion annually to power sector distortions: World Bank. 17 December 2018. 17 December 2018. https://web.archive.org/web/20181217202244/https://energy.economictimes.indiatimes.com/news/power/india-loses-4-1-of-gdp-annually-to-power-sector-distortions-world-bank/67127352. live.
  252. Web site: Indian coal-based power plants fifth most profitable globally. 30 November 2018. 30 November 2018. https://web.archive.org/web/20181130202313/https://energy.economictimes.indiatimes.com/news/coal/indias-coal-based-power-plants-fifth-most-profitable-globally/66882947. live.
  253. Web site: Merit Order Despatch of Electricity. 17 July 2017. 15 June 2021. https://web.archive.org/web/20210615010502/http://meritindia.in/. dead.
  254. News: Government asks states to purchase short term power through reverse e-auction. The Economic Times. 4 April 2016. 5 April 2016. Singh. Sarita. 9 April 2016. https://web.archive.org/web/20160409082036/http://economictimes.indiatimes.com/industry/energy/power/government-asks-states-to-purchase-short-term-power-through-reverse-e-auction/articleshow/51684372.cms. live.
  255. News: Reverse e-auction lowering power prices. Ind-Ra. The Economic Times. 25 May 2016. 26 May 2016. Sengupta. Debjoy. 29 May 2016. https://web.archive.org/web/20160529182756/http://economictimes.indiatimes.com/industry/energy/power/reverse-e-auction-lowering-power-prices-ind-ra/articleshow/52433857.cms. live.
  256. Web site: MCX move to launch electricity future faces legal hurdle. 24 December 2008. Financial Express. The Financial Express. 24 January 2009. 13 February 2009. https://web.archive.org/web/20090213164403/http://www.financialexpress.com/news/mcx-move-to-launch-electricity-future-faces-legal-hurdle/401592/. live.
  257. Web site: Generating companies may get to invite bids from discoms to sell power . 23 March 2019 . 23 March 2019 . https://web.archive.org/web/20190323091916/https://energy.economictimes.indiatimes.com/news/power/generating-companies-may-get-to-invite-bids-from-discoms-to-sell-power/68531619 . live .
  258. Web site: Renewable energy: The undoing of RECs and ESCerts. 17 June 2022. 2 October 2022. 2 October 2022. https://web.archive.org/web/20221002181217/https://www.financialexpress.com/opinion/renewable-energy-the-undoing-of-recs-and-escerts/2563406/. live.
  259. Web site: To price or not to price? making a case for a carbon pricing mechanism for India. 2 October 2022. 2 October 2022. https://web.archive.org/web/20221002181218/http://www.indiaenvironmentportal.org.in/files/file/carnon%20pricing.pdf. live.
  260. Web site: Seriously Stressed and Stranded . 23 December 2019 . 18 July 2021 . https://web.archive.org/web/20210718052122/http://www.indiaenvironmentportal.org.in/files/file/Seriously%20Stressed%20and%20Stranded.pdf . dead .
  261. Web site: Financial distress in India's thermal power sector from $40–60 bn stranded assets . 18 August 2018 . 18 August 2018 . https://web.archive.org/web/20180818182150/https://energy.economictimes.indiatimes.com/news/power/financial-distress-in-indias-thermal-power-sector-from-40-60-bn-stranded-assets/65450032 . dead .
  262. Web site: Subsidies for Fossil Fuels and Renewable Energy, 2018 Update . 7 January 2019 . 18 July 2021 . https://web.archive.org/web/20210718051348/https://docs.google.com/viewerng/viewer?url=https://img.etb2bimg.com/files/retail_files/reports/data_file-indi-1545636483.pdf . live .
  263. News: 'No proposal to bring down power price'. Ignatius Pereira. The Hindu. 12 July 2014. 29 July 2015. 10 January 2016. https://web.archive.org/web/20160110012632/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/no-proposal-to-bring-down-power-price/article6205519.ece. live.
  264. Web site: Achilles heel of the power sector. Mehta. Pradeep S.. @businessline. 15 October 2015. en. 30 September 2019. 30 September 2019. https://web.archive.org/web/20190930024347/https://www.thehindubusinessline.com/opinion/columns/achilles-heel-of-the-power-sector/article7766479.ece. live.
  265. Web site: Global Solar Storage Market: A Review Of 2015. 6 April 2016. 6 April 2016. 16 April 2016. https://web.archive.org/web/20160416153918/http://solarquarter.com/index.php/technology/504-global-solar-storage-market-a-review-of-2015. dead.
  266. Web site: Analysis of Imports of battery. 14 April 2016. 27 January 2022. https://web.archive.org/web/20220127063352/https://www.zauba.com/importanalysis-battery-report.html. live.
  267. Web site: Day ahead market (DAM) area prices. 14 August 2016. 21 June 2021. https://web.archive.org/web/20210621030334/https://www.iexindia.com/marketdata/areaprice.aspx. live.
  268. Web site: Monthly report on Short-term Transactions of Electricity in India, May 2015 (Refer Table-5) . 14 August 2015 . 23 September 2015 . https://web.archive.org/web/20150923201929/http://www.cercind.gov.in/2015/market_monitoring/MMC_Report_May.pdf . live .
  269. Web site: India's steel industry, like America's, is dominated by electric-based processes . 4 January 2018 . 5 January 2018 . https://web.archive.org/web/20180105123150/https://www.eia.gov/todayinenergy/detail.php?id=34052 . live .
  270. Web site: IEX, Landed Cost Calculator in open access . 15 July 2016 . 20 June 2016 . https://web.archive.org/web/20160620072543/http://www.iexindia.com/landedcostcalculator.aspx?id=26&mid=2 . dead .
  271. Web site: Open Access in Indian power sector . 15 May 2013 . 11 September 2014 . https://web.archive.org/web/20140911014601/http://indianpowersector.com/home/wp-content/uploads/2014/07/Report-OPEN-ACCESS-IN-INDIA.pdf . dead .
  272. Web site: Report on Indian electricity grid management requirements. 17 December 2017. 22 December 2017. https://web.archive.org/web/20171222051945/http://www.cea.nic.in/resd_com_reports.html. dead.
  273. Web site: Draft CERC (Ancillary Services Operations) Regulations, 2015 . 2015 . Central Electricity Regulatory Commission, Govt. of India . 15 May 2015 . 1 July 2015 . https://web.archive.org/web/20150701024828/http://www.cercind.gov.in/2015/draft_reg/draft_notice.pdf . live .
  274. Web site: Access to Clean Cooking Energy and Electricity – Survey of States . 2015 . Council on Energy, Environment and Water report . 15 December 2015 . 14 April 2016 . https://web.archive.org/web/20160414095500/http://shaktifoundation.in/wp-content/uploads/2014/02/Access-to-Clean-Cooking-Energy-and-Electricity-Survey-of-States-Final-Report.pdf . dead .
  275. Samir K Srivastava, Consumers need quality power, The Economic Times, 10 May 2007, pp. 12 (Available at: https://economictimes.indiatimes.com/PDAET/articleshow/msid-2024426,curpg-1.cms https://economictimes.indiatimes.com/PDAET/articleshow/msid-2024426,curpg-1.cms).
  276. Web site: Progress report of Pumpset Energisation as on 30-09-2015 . 14 October 2015 . 10 January 2016 . https://web.archive.org/web/20160110012632/http://www.cea.nic.in/reports/monthly/electrification/2015/pumpset_energization-09.pdf . dead .
  277. Web site: Top fossil fuel players back PM Narendra Modi's goal to shore up India's clean energy sector . 22 July 2016 . 22 July 2016 . news . Economic Times . Anindya Upadhyay . Debjit Chakraborty . 25 July 2016 . https://web.archive.org/web/20160725221712/http://economictimes.indiatimes.com/industry/energy/power/top-fossil-fuel-players-back-pm-narendra-modis-goal-to-shore-up-indias-clean-energy-sector/articleshow/53336021.cms . live .
  278. Web site: Outstanding dues of power utilities to CPSUs up to July 2014 . 2014 . Central Electricity Authority, Govt. of India . 23 August 2014 . https://web.archive.org/web/20140718144437/http://cea.nic.in/reports/articles/eandc/outstandingdues_cpsu.pdf . 18 July 2014 . dead .
  279. Web site: The power paradox . 6 May 2016 . 6 May 2016 . 10 June 2016 . https://web.archive.org/web/20160610215917/http://www.powertoday.in/beststories/News/The-Power-Paradox/98113 . dead .
  280. Web site: Power Tariff Scam Gets Bigger at Rs. 50,000 Crore as Allegations of Equipment Over-Invoicing Emerge . 20 May 2016 . https://web.archive.org/web/20160519111541/http://thewire.in/2016/05/18/power-tariff-scam-gets-bigger-at-rs-50000-crore-36912/ . 19 May 2016 . dead .
  281. Web site: U.K. National Grid Status . 14 October 2015 . 21 May 2019 . https://web.archive.org/web/20190521115148/http://www.gridwatch.templar.co.uk/ . live .
  282. Web site: Energy-efficient buildings – a business case for India? An analysis of incremental costs for four building projects of the Energy-Efficient Homes Programme . 14 March 2015 . 2 April 2015 . https://web.archive.org/web/20150402100407/http://www.adelphi.de/en/publications/dok/43509.php?pid=1971 . live .
  283. Web site: Cheaper renewable energy outpaces nuclear power . 21 March 2016 . 26 March 2016 . https://web.archive.org/web/20160326093527/http://www.thehansindia.com/posts/index/Business/2016-03-20/Cheaper-renewable-energy-outpaces-nuclear-power/214919 . live .
  284. Web site: Power Sector in India: White paper on Implementation Challenges and Opportunities . KPMG . January 2010 . 7 August 2011 . 4 March 2016 . https://web.archive.org/web/20160304053031/http://www.kpmg.de/docs/PowerSector_2010.pdf . dead .
  285. Web site: Indian Petroleum & Natural Gas statistics . 25 April 2022 . 18 June 2022 . https://web.archive.org/web/20220618202202/https://mopng.gov.in/en/petroleum-statistics/indian-png-statistics . live .
  286. Web site: India challenges China as world's biggest LPG importer. 27 December 2017. 27 December 2017. https://web.archive.org/web/20171227180358/https://energy.economictimes.indiatimes.com/news/oil-and-gas/india-challenges-china-as-worlds-biggest-lpg-importer/62263809. dead.
  287. Web site: Which is the More Energy Efficient Stovetop – Gas, Electric, or Induction?. 29 September 2022. 3 October 2022. https://web.archive.org/web/20221003093143/https://www.leafscore.com/eco-friendly-kitchen-products/which-is-more-energy-efficient-gas-electric-or-induction/. live.
  288. Web site: EESL to deploy 20,000 induction cookstoves in India with MECS. 29 September 2022. 28 September 2022. https://web.archive.org/web/20220928141034/https://energy.economictimes.indiatimes.com/news/power/eesl-to-deploy-20000-induction-cook-stoves-in-india-with-mecs/94504452. live.
  289. News: Govt revises pricing formula, CNG, PNG to cost 10% less from tomorrow. 6 April 2023. 6 April 2023. https://web.archive.org/web/20230406233810/https://indianexpress.com/article/india/govt-revises-gas-pricing-formula-cng-piped-cooking-gas-to-cost-10-less-8543113/. live.
  290. News: New gas pricing norms can reduce CNG, PNG prices by 9-11 percent. 6 April 2023. 7 April 2023. https://web.archive.org/web/20230407132029/https://energy.economictimes.indiatimes.com/news/oil-and-gas/new-gas-pricing-norms-can-reduce-cng-png-prices-by-9-11-per-cent/99317425. live.
  291. Web site: Niti Aayog pitches for electricity as a clean cooking option to LPG. 13 April 2016. 16 April 2016. https://web.archive.org/web/20160416154314/http://economictimes.indiatimes.com/news/economy/policy/arvind-panagariya-pitches-for-electricity-as-clean-cooking-option-to-lpg/articleshow/51786931.cms. live.
  292. Web site: How rural India can be made to switch to eco-friendly electric stoves. 22 May 2019. 21 May 2019. https://web.archive.org/web/20190521071658/https://www.business-standard.com/article/pti-stories/how-to-make-rural-india-switch-to-cleaner-cookstoves-119052100422_1.html. live.
  293. Web site: Power ministry to bring aggregation model to make e-cooking affordable. 6 June 2023. 6 June 2023. https://web.archive.org/web/20230606083024/https://energy.economictimes.indiatimes.com/news/power/power-ministry-to-bring-aggregation-model-to-make-e-cooking-affordable/100779396. live.
  294. Web site: Heat Pump Water Heaters. 10 March 2024. 17 May 2021. https://web.archive.org/web/20210517180105/https://www.energy.gov/energysaver/heat-pump-water-heaters. live.
  295. News: Exploring new options to electrify process heating in MSMEs. 25 April 2022. 5 July 2022. https://web.archive.org/web/20220705160746/https://energy.economictimes.indiatimes.com/news/power/opinion-exploring-new-options-to-electrify-process-heating-in-msmes/91075201. live.
  296. Web site: Deep Dive: SECI’s FDRE tender discovers Rs 4.98 per unit tariff. 16 August 2024.
  297. Web site: Hero Future, JSW, Serentica and Renew win SECIs 1.5 GW FDRE auction. 10 May 2024.
  298. Web site: WELLS, WIRES AND WHEELS…. BNP PARIBAS ASSET MANAGEMENT. 5 August 2019. August 2019. 6 August 2019. https://web.archive.org/web/20190806130507/https://docfinder.bnpparibas-am.com/api/files/1094E5B9-2FAA-47A3-805D-EF65EAD09A7F. live.
  299. Web site: No automakers take part in Rs 5,000 crore tender for e-Bus. 21 April 2023. 21 April 2023. https://web.archive.org/web/20230421172438/https://energy.economictimes.indiatimes.com/news/power/no-automakers-take-part-in-rs-5000-crore-tender-for-e-bus/99661436. live.
  300. Web site: A million-mile battery from China could power your electric car . 10 June 2020 . 10 June 2020 . https://web.archive.org/web/20200610002759/https://energy.economictimes.indiatimes.com/news/power/a-million-mile-battery-from-china-could-power-your-electric-car/76276323 . live .
  301. Web site: Explaining the Surging Demand for Lithium-Ion Batteries . 5 May 2016 . 25 August 2016 . https://web.archive.org/web/20160825031957/http://www.visualcapitalist.com/explaining-surging-demand-lithium-ion-batteries/ . live .
  302. News: What is bidirectional EV charging?. 15 May 2023. 16 May 2023. https://web.archive.org/web/20230516192957/https://www.solarpowerworldonline.com/2023/02/what-is-bidirectional-ev-charging/. live.
  303. News: Large-scale solar project reuses EV batteries as energy storage . 15 May 2023.
  304. News: Mahle sets global standard for wireless charging of EVs . 24 November 2023.
  305. Web site: Sweden is building an electric road that will charge car as you drive . 12 May 2019 . 12 May 2019 . https://web.archive.org/web/20190512093324/https://energy.economictimes.indiatimes.com/news/power/sweden-is-building-an-electric-road-that-will-charge-car-as-you-drive/69289527 . dead .
  306. News: Review of Recent Advances in Dynamic and Omnidirectional Wireless Power Transfer. 7 July 2016. 19 September 2016. https://web.archive.org/web/20160919065926/http://ias.ieee.org/images/files/Webinars/IAS-webinar---Zeljko-Pantic---June-2016.pdf. dead.
  307. Web site: CIA – The World Factbook. https://web.archive.org/web/20130309174844/https://www.cia.gov/library/publications/the-world-factbook/rankorder/2179rank.html. dead. 9 March 2013. 9 March 2013. 30 September 2019.