Zhikong Hydro Power Station | |
Location Map: | Tibet |
Location Map Caption: | Location of Zhikong Hydro Power Station in Tibet Autonomous Region |
Coordinates: | 29.9686°N 91.8768°W |
Country: | China |
Location: | Maizhokunggar County, Lhasa, Tibet Autonomous Region |
Purpose: | Hydroelectric |
Status: | O |
Construction Began: | May 2003 |
Opening: | 23 September 2007 |
Operator: | China Huaneng Group |
Dam Type: | Embankment, rock-fill |
Plant Commission: | 2006-2007 |
Plant Type: | Conventional |
Plant Turbines: | 4 x 25 MW Francis-type |
Plant Capacity: | 100 MW |
Plant Annual Gen: | 407 GWh |
The Zhikong Hydro Power Station, is a reservoir and power station on the Lhasa River in Maizhokunggar County to the east of Lhasa, Tibet, China.It came into operation in 2007, and has a capacity of 100 MW.
The Zhikong Hydro Power Station lies between the middle and lower reaches of the Lhasa River, also called the Kyi River.It is about northeast of Lhasa, in Maizhokunggar County.It is at an elevation of above sea level, downstream from the 160 MW Pangduo Hydro Power Station at .The Zhikong Dam, a rock-fill dam, is tall.It impounds of water.The plant has four 25 MW Francis turbines supplied by Kunming, and is operated by the China Huaneng Group.Installed capacity is 100 MW and annual production is about 407 GWh.The reservoir is also used for flood control and irrigation.
The Lhasa River Zhi Kong hydroelectric power station was a key project of the tenth five-year plan.Construction began in May 2003, with the No 8 Hydroelectricity Corp of the Armed Police Force responsible for engineering, procurement, and construction.After a fiasco with the Yamdrok Hydropower Station in 1996, south of Lhasa, the deputy commander of the People's Armed Police construction brigade was placed in charge of the project.Construction cost 1.37 billion yuan.The first generator was commissioned in 2006 and the power station was put into full operation on 23 September 2007.