Zhenlong | |||||||||||
Native Name: | 镇龙 | ||||||||||
Native Name Lang: | zh-Hans | ||||||||||
Symbol Location: | guangzhou | ||||||||||
Symbol: | metro | ||||||||||
Mlanguage: |
| ||||||||||
Address: | Guangshan Highway (G324) east of Jiulong Avenue | ||||||||||
Borough: | Huangpu District, Guangzhou, Guangdong | ||||||||||
Country: | China | ||||||||||
Coordinates: | 23.2845°N 113.593°W | ||||||||||
Operator: | Guangzhou Metro Co. Ltd. | ||||||||||
Line: | |||||||||||
Platforms: | 4 (2 island platforms) | ||||||||||
Tracks: | 4 | ||||||||||
Structure: | Underground | ||||||||||
Accessible: | yes | ||||||||||
Opened: | (Line 14) (Line 21) |
Zhenlong station, is an interchange station of Line 14 and Line 21 on the Guangzhou Metro. It started operations on 28 December 2017 (for Line 14) [1] and 28 December 2018 (for Line 21) and serves as the southeastern terminus of the Knowledge City branch of Line 14.
F3 Reserved Zone | style="border-bottom:solid 1px gray; border-top:solid 1px gray;" valign=top width=100 | - | Reserved |
F2 Reserved Zone | style="border-bottom:solid 1px gray; border-top:solid 1px gray;" valign=top | - | Reserved |
G Concourse | Lobby | Customer Service, Vending machines, ATMs, Exits | |
B1 Platforms | Staff Passageway | Passageway between Station and Zhenlong Depot | |
Platform | towards Yuancun (Zhenlongxi / express: Shuixi) | ||
Island platform, doors will open on the left (line 21) or right (line 14) | |||
Platform | towards Xinhe (Zhenlongbei) | ||
Platform | termination platform | ||
Island platform, doors will open on the left (line 21) or right (line 14) | |||
Platform | towards Zengcheng Square (Zhongxin / express: Fenggang) |
Exit number | Exit location | ||
---|---|---|---|
Exit A | Guangshan Highway | ||
Exit B | Guangshan Highway | ||
Exit C | Guangshan Highway | ||
Exit D | Guangshan Highway |