Status: | Operational (Zhengzhou-Xiangyang section) |
Locale: | Henan, Hubei, Chongqing |
Start: | Zhengzhou East |
End: | Wanzhou North |
Owner: | China Railway |
Operator: | China Railway High-speed |
Tracks: | 2 |
Speed: | 3500NaN0 |
Map State: | collapsed |
Zhengzhou–Wanzhou high-speed railway is a high-speed railway connecting Zhengzhou, the capital of Henan province, and Wanzhou District in Chongqing. The section between Zhengzhou East and Xiangyang East started operation on 1 December 2019.[1] [2] It connects with the Chongqing–Wanzhou intercity railway. The line forms part of the Hohhot–Nanning corridor. The section from to Wanzhou also forms part of the Shanghai–Chongqing–Chengdu high-speed railway.
The railway was approved by the National Development and Reform Commission in 2014.[3] Construction began in 2016, and the line fully opened in June 2022.
The Zhengzhou to Xiangyang section opened on 1 December 2019.[4] The remaining section between Xiangyang and Wanzhou opened on 20 June 2022.[5]
--! colspan="2" | Route--> | Station №--> | Station Name | Chinese | Distance -->< | --! China Railway transfers/connections--> | Metro transfers/connections | Location--> | ||
---|---|---|---|---|---|---|---|---|---|---|
Zhengzhou East | ||||||||||
Zhengzhou Hangkonggang | ||||||||||
Changge North | ||||||||||
Yuzhou | ||||||||||
Jiaxian | ||||||||||
Pingdingshan West | -bgcolor="lightgrey" | Guaihe North (reserved)--> | ||||||||
Fangcheng | ||||||||||
Nanyang East | ||||||||||
Dengzhou East | ||||||||||
Xiangyang East | ||||||||||
Nanzhang | ||||||||||
Baokangxian | ||||||||||
Shennongjia | ||||||||||
Xingshan | ||||||||||
Badong | ||||||||||
Wushan | ||||||||||
Fengjie | ||||||||||
Yunyang | ||||||||||
Wanzhou North |