Zhengzhou–Fuyang high-speed railway explained

Zhengzhou–Fuyang high-speed railway
Type:High-speed railway,
Passenger dedicated railway
Status:Operational
Locale:Henan and Anhui provinces, China
End:Fuyang West
Open:1 December 2019
Owner:China Railway
Operator:CR Zhengzhou Group & CR Shanghai Group
Linelength:2760NaN0
Electrification:50 Hz 25 kV(AC
Speed:Design 3500NaN0
Initial 3000NaN0
Map State:collapsed

The Zhengzhou–Fuyang high-speed railway is a high-speed passenger-dedicated railway between Zhengzhou in Henan province, and Fuyang in Anhui province on China's central plain. It opened on 1 December 2019.[1] [2]

The 2760NaN0 line starts from, there are 9 intermediate stations and the line terminates at Fuyang West.

List of stations

Description

In December 2019, there were 9 trains per day in each direction along the line, the fastest time between the terminals is now 1 hour 22 minutes (train G1955) the slowest direct train on the line takes 1 hour and 55 minutes (train G3182). There are alternative high-speed trains between the terminals via which are almost as fast, for example G3170 takes 2 hours and 2 minutes.[3]

Notes and References

  1. Web site: Three High Speed Railways in Central Plains Open to Traffic on the Same Day . China Railway . 20 December 2019 . 6 December 2019.
  2. Web site: Briginshaw . David . China opens three more high-speed lines . International Railway Journal . 21 December 2019 . 2 December 2019.
  3. Web site: Zhengzhou to Fuyang Trains (郑州 - 阜阳) . Trip.com. (To repeat search, change date to a day in the future) . 21 December 2019.