Zhengzhou–Fuyang high-speed railway | |
Type: | High-speed railway, Passenger dedicated railway |
Status: | Operational |
Locale: | Henan and Anhui provinces, China |
End: | Fuyang West |
Open: | 1 December 2019 |
Owner: | China Railway |
Operator: | CR Zhengzhou Group & CR Shanghai Group |
Linelength: | 2760NaN0 |
Electrification: | 50 Hz 25 kV(AC) |
Speed: | Design 3500NaN0 Initial 3000NaN0 |
Map State: | collapsed |
The Zhengzhou–Fuyang high-speed railway is a high-speed passenger-dedicated railway between Zhengzhou in Henan province, and Fuyang in Anhui province on China's central plain. It opened on 1 December 2019.[1] [2]
The 2760NaN0 line starts from, there are 9 intermediate stations and the line terminates at Fuyang West.
In December 2019, there were 9 trains per day in each direction along the line, the fastest time between the terminals is now 1 hour 22 minutes (train G1955) the slowest direct train on the line takes 1 hour and 55 minutes (train G3182). There are alternative high-speed trains between the terminals via which are almost as fast, for example G3170 takes 2 hours and 2 minutes.[3]