Other Name: | M24[1] /L2[2] (planned name) |
Type: | Rapid transit |
System: | Beijing Subway |
Status: | Operational |
Locale: | Tongzhou, Daxing, Chaoyang, and Fengtai districts Beijing |
Stations: | 14 |
Daily Ridership: | 173,500 (2014 Avg.) 221,200 (2014 Peak)[3] |
Operator: | Beijing Mass Transit Railway Operation Corp., Ltd |
Character: | Underground and elevated |
Depot: | Songjiazhuang, Taihu |
Stock: | 6-car Type B (DKZ32) |
Linelength: | 23.23km (14.43miles) |
Electrification: | third rail |
Speed: | 80km/h (maximum service speed) |
Map State: | collapsed |
The Yizhuang Line of the Beijing Subway is a rapid transit line that connects the Yizhuang Development Area with Beijing's subway network. The line is 23.23km (14.43miles) long with 14 stations, including six underground and eight elevated.[4] It runs from Songjiazhuang in Fengtai District to Yizhuang Railway Station in Tongzhou District and passes through the southern Chaoyang and northern Daxing Districts.[5] Total investment for the line was estimated at ¥1.2 billion. Construction began on December 8, 2007[6] and the line opened on December 30, 2010. Yizhuang line's color is
magenta.Station Name | Connections | Nearby Bus Stops | Distance [7] | Location | |||
---|---|---|---|---|---|---|---|
0.000 | 0.000 | Fengtai | |||||
2.631 | 2.631 | Chaoyang | |||||
1.275 | 3.906 | ||||||
2.366 | 6.272 | Daxing | |||||
1.982 | 8.254 | ||||||
0.993 | 9.247 | ||||||
1.728 | 10.975 | ||||||
1.090 | 12.065 | ||||||
1.355 | 13.420 | ||||||
2.337 | 15.757 | Tongzhou | |||||
2.301 | 18.058 | ||||||
2.055 | 20.113 | ||||||
1.281 | 21.394 | ||||||
1.334 | 22.728 | ||||||
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Songjiazhuang — Ciqu | 30 December 2010 | 21.42NaN2 | 13 | (initial phase) | |
Ciqu — Yizhuang Railway Station | 30 December 2018 | 1.3342NaN2 | 1 | one-station extension |
On March 26, 2015, train YZ021 was testing when it derailed around Taihu. No passengers were on board and the driver faced leg injuries.[8] [9] [10]
In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) announced to reform the connection tracks between Yizhuang line, the line 5 and the line 10, so that trains of Yizhuang line can operate through trains with lines 5 and 10. It will require a maximum of new tracks near Songjiazhuang train depot, between Songjiazhuang stations of Yizhuang line and line 5, and Chengshousi station of line 10, it will also require to rebuild 0.5 km tracks for train storages within Songjiazhuang depot.[11]