Yangcheng Power Station 阳城电厂 | |
Country: | China |
Location: | Shanxi |
Status: | Operational |
Construction Began: | 2002 |
Commissioned: | 1996 |
Owner: | Datang International Power Generation Company[1] |
Th Fuel Primary: | Coal |
Ps Units Operational: | 6 x 350 MW, 2 x 600 MW |
Ps Electrical Capacity: | 3,300 MW |
Yangcheng Power Station is a coal-fired power station in Beiliu, Shanxi, China. It has an installed capacity of 3,300 MW. The plant was first commissioned in 1996.[2] Construction on phase one of the plant began in 2001 and ended in 2007. The plant is the site of the world's two largest dry cooling towers.[3]