X'Trapolis Tsíimin K'áak explained

X'Trapolis Tsíimin K'áak
Service:December 15, 2023–present
Manufacturer:Alstom
Family:X'Trapolis
Yearconstruction:2021–2023
Numberbuilt:42 sets (planned)
Formation:4-to-7-car sets
Lines:Tren Maya
Carlength:25.5frac=16NaNfrac=16
Width:3046frac=16NaNfrac=16
Height:4214frac=16NaNfrac=16
Floorheight:1185mm
Maxspeed:
  • 180km/h (design)
  • 160km/h (service)
Weight:
  • 49t

The X'Trapolis Tsíimin K'áak is a multiple unit train built by Alstom. It is part of the X'Trapolis series of suburban trains.[1] It is used on the Tren Maya in Mexico, also called Tsíimin K'áak in Mayan. In total, 42 trains will be built, consisting of 4 to 7 cars.[2] Of these trains, 32 of them will be electro-diesel multiple units, 10 will be standard diesel multiple units.[3]

On the morning of August 30, 2023, the first tests of the rolling stock were carried out. On September 1, 2023, tests were carried out between Campeche and Yucatán.[4]

History

Proposals

In 2021, CAF and Alstom presented their proposals for the construction of 42 trains that must meet the demand of passengers of the Tren Maya. The decision on these proposals was announced by the Fondo Nacional de Fomento al Turismo on 26 May the same year.

Alstom would win the contract from the Spanish CAF for 36,563 million pesos, despite obtaining a lower technical score. The French company won the international competition to supply 42 trains.[5]

Construction

The manufacturing of the trains began in September 2022, and the first car was completed in November 2022. The first train was delivered on July 8, 2023.[6]

On August 8, 2023, the train moved for the first time. Between August 12 and 13, the first dynamic tests can be carried out, during which 15,000 kilometers worth of tests will be conducted. It is expected that in December of that year 13 trains will be delivered, of which six of them will be fully tested.[7] [8]

Alstom highlighted that the first set delivered is made up of 2 motor cars and 2 trailer cars.[9]

Alstom expects to deliver the last of the 219 wagons that complete the project to the National Fund for Tourism Promotion (Fondo Nacional de Fomento al Turismo, FONATUR) in the last quarter of 2024.[10] [11]

Characteristics

The train cars have closed circuit television, lighting, air conditioning, a cafeteria, bathrooms, internet, Wi-Fi, and large windows, as well as spaces for people with reduced mobility, both in the seats, in the dining room and in the cabins.[12]

The trains of this model, from the beginning, already have advanced digital technologies, including a European Rail Traffic Management System (ERTMS), to provide optimal efficiency and high levels of safety.

In addition, HealthHub and TrainScanner, digital solutions for predictive maintenance, will be deployed, enabling continuous monitoring of the conditions of different train components, signalling and infrastructure to ensure maximum reliability and availability, while optimising the lifecycle costs of each train car. In other words, this will serve to optimize the preventive and corrective maintenance of the formations as well as to make the work of the driver who will be in charge of assuming the command of the train more efficient.[13]

Some of the trains are electro-diesel multiple units. However, it is possible to scale up the mechanical and electronic components for the management of the diesel engine in the future to be able to operate it with biodiesel in the future.

Train types

For the Tren Maya, these formations come in 3 different configurations depending on the type of service to be occupied:

The Tren Maya offers service in tourist class and premier class.[14] [15]

Notes and References

  1. Web site: The Mayan train project . 15 September 2023 . Alstom .
  2. Web site: Valladolid . Mónica . 2022-11-11 . El 9 de julio de 2023 se entregará la primera unidad del Tren Maya, anuncia Fonatur . 2023-06-14 . Forbes México . es-MX.
  3. Web site: Fender . Keith . Passenger equipment from Britain, US heads to Mexico . . 24 November 2023 . 5 September 2023.
  4. Web site: Inician primeras pruebas oficiales del Tren Maya en Quintana Roo . 15 September 2023 . Grupo Milenio . 30 August 2023 . es-MX.
  5. Web site: 2021-05-27 . Alstom gana a CAF el contrato del tren Maya de México por 1.500 millones pese a una menor puntuación técnica . 2023-06-14 . Europa Press.
  6. Web site: Primeros vagones del Tren Maya salieron de Hidalgo con destino a Cancún con escolta de la Guardia Nacional . 15 September 2023 . infobae . 4 July 2023 . es-ES.
  7. Web site: Tren Maya: Para diciembre ya estarán sobre la vía 13 trenes . 2023-06-14 . Nación321 . es-MX.
  8. Web site: Carrillo . Emmanuel . 2023-07-10 . Estas serán las pruebas técnicas a las que se someterá el Tren Maya . 2023-07-16 . Forbes México . es-MX.
  9. Web site: 2023-06-05 . Tren Maya: así será el traslado del primer convoy de Sahagún a Cancún . 2023-06-14 . es.
  10. Web site: G . Elibeth Eduardo . 2023-07-12 . Alstom hace la primera entrega del Tren Maya . 2023-07-16 . CIOAL The Standard IT . es.
  11. Web site: Castro-Lebrija . Raúl . 2023-07-10 . Alstom concluirá la entrega de vagones del Tren Maya hasta finales del 2024 . 2023-07-16 . Revista Fortuna . es-MX.
  12. Web site: Vagones del Tren Maya: características y servicios que tendrán (FOTOS) . 15 September 2023 . www.yucatan.com.mx . 31 January 2023 . es.
  13. Web site: Entrega Alstom primer tren para el proyecto Tren Maya . El Financiero . 28 June 2024 . es . 11 July 2023.
  14. Web site: Tipos de Trenes del Tren Maya Turismo Tren Maya . www.turismotrenmaya.mx/ . 28 June 2024 . es-MX . 30 November 2023.
  15. Web site: Tren Maya: ¿Cuánto cuestan los boletos y qué tramos se inaugurarán? . El Financiero . 28 June 2024 . es . 2 December 2023.