Woodhouse railway station explained

Woodhouse
Symbol Location:gb
Symbol:rail
Borough:Woodhouse, City of Sheffield
Country:England
Coordinates:53.3638°N -1.3575°W
Grid Name:Grid reference
Manager:Northern Trains
Platforms:2
Code:WDH
Zone:Sheffield
Classification:DfT category F2
Transit Authority:Travel South Yorkshire
Original:Manchester, Sheffield and Lincolnshire Railway
Pregroup:Great Central Railway
Postgroup:London and North Eastern Railway
Years:October 1850
Events:First station opened as Woodhouse Junction
Years1:11 October 1875
Events1:Resited 640 m west and renamed Woodhouse
Footnotes:Passenger statistics from the Office of Rail and Road

Woodhouse railway station serves Woodhouse and Woodhouse Mill in Sheffield, South Yorkshire, England. The station is 5.25miles east of Sheffield station on the Sheffield to Lincoln Line.

The next station east was, until its closure in 1955, and is now . The next station west is . Beighton railway station, originally adjacent to the junction with the Midland Railway, but rebuilt by the MS&LR when it began work on its "Derbyshire Lines", was until 1954 the next station south.

Woodhouse Mill, Orgreave and Fence were served by a station on the North Midland Railway named .

From 1955 until removal in 1981, the Barnsley Junction-Rotherwood segment of the Manchester – Sheffield – Wath electrification terminated slightly west of the Woodhouse station platforms, within sight of the station.[1]

History

The present station is the second built to serve the community of Woodhouse, then separate from and not under the governance of Sheffield. The railway line between Sheffield and Gainsborough was proposed by the Sheffield and Lincolnshire Junction Railway (S&LJR); upon authorisation of this line in August 1846, the S&LJR amalgamated with other railways to form the Manchester, Sheffield and Lincolnshire Railway (MS&LR).

The first section of the S&LJR line, between Sheffield and Beighton (on the Midland Railway) opened on 12 February 1849; the second section, which left the first near Woodhouse and ran to Gainsborough, opened on 17 July 1849. A station at the junction was opened by the MS&LR in October 1850, named Woodhouse Junction.[2] [3] [4]

The original station was at the bottom of Junction Lane, adjacent to the present Woodhouse Junction, formerly East Junction, signal box and was built to serve the communities of Beighton, then within Derbyshire, and Woodhouse. This station was closed on 11 October 1875 and replaced on the same day by a new station 640m (2,100feet) to the west, named Woodhouse.[4] The new station was one of the earliest examples of the Manchester, Sheffield and Lincolnshire Railway's Double Pavilion designs at its present location.

Platforms

The current station has two platforms; what looks like a third disused and overgrown platform on the Down Side (Sheffield bound side) is a former Goods loading bay, whilst on the Up side (Worksop bound), again what looks like a disused platform is actually the truncated former Up Goods line that ran behind the Up Main platform.[5] [6] A number of goods sidings exist immediately to the east, which see sporadic use by engineers trains.

Colliery lines

Woodhouse was the hub of two colliery branches: to the west a branch to Orgreave Colliery, which was extended to reach Treeton Colliery under the MS&LR (Extension to London) Act 1893 and opened on 10 October 1898, and, to the east, from Woodhouse East Junction, the Birley Branch, which served the Birley Collieries, belonging to the Sheffield Coal Company.

Facilities

The station is unmanned and has no ticket provision - these must be bought in advance of travel or on the train. The buildings on both sides remain intact and each have waiting areas within. Train running information is provided by a customer help point on platform 1, display screens and timetable posters. Step-free access is only available to platform 1, as the footbridge from there to platform 2 has steps.[7]

Services

All services at Woodhouse are operated by Northern Trains using and DMUs.[8]

The typical off-peak service in trains per hour is:

On Sundays, the station is served by an hourly service between Lincoln and Sheffield, with some services continuing to .

Further reading

Notes and References

  1. Book: Johnson, EM . Scenes from the Past 29 (Part Three): Woodhead The Electric Railway . Stockport . Foxline . 1-870119-81-9 . 140.
  2. Book: Awdry, Christopher . Christopher Awdry

    . Christopher Awdry . 1990 . Encyclopaedia of British Railway Companies . London . Guild Publishing . CN 8983 . 160 .

  3. Book: Dow, George . George Dow

    . George Dow . 1959 . Great Central, Volume One: The Progenitors, 1813-1863 . Shepperton . . 0-7110-1468-X . 122, 127 .

  4. Book: Butt, RVJ . 1995 . The Directory of Railway Stations . Yeovil . Patrick Stephens Ltd . 1-85260-508-1 . R508 . 254.
  5. Scenes from the past:43 Sheffield Victoria to Chesterfield Central: Vol 1 p. 51 by Ken Grainger
  6. Web site: Disused Stations: Woodhouse Station . www.disused-stations.org.uk . 11 July 2021.
  7. http://www.nationalrail.co.uk/stations/wdh/details.html Woodhouse station facilities
  8. Web site: Northern place one third of new Class 195 and Class 331 fleet into service. 22 August 2022.