Wind power in Rhode Island is in the early stages of development. There are several small scale wind turbine projects in the state. As of December 2013 there were 11 turbines at 10 sites in the state.[1] In 2014, Rhode Island had 9 MW of installed wind power capacity,[2] which quickly rose to 75 MW in 2019.[3]
Rhode Island’s first commercial turbine was constructed in March 2006 at Portsmouth Abbey on Aquidneck Island. Block Island Wind Farm, the first offshore in the U.S., came on line in 2016.
There were numerous windmills in Rhode Island. Several of the 18th and 19th century windmills are still standing and are often open for public viewing. NASA built an experimental wind turbine on Block Island in 1979.[4] [5]
In March 2006 the Portsmouth Abbey School installed a 660-kW V-47 turbine on Aquidneck Island.[6]
Installed in 2009, the Portsmouth High School turbine had been the largest producer of electricity produced by wind power.[7] until faltering in 2012. In 2014, the municipality voted to replace it.[8] The replacement wind turbine came online in 2016. It is 88meters tall and is rated at 1.5 MW capacity.
Brought on line in 2012, the three wind turbines at Fields Point in Providence are each rated at 1.5 mW. Manufactured by Goldwind USA, they each have 150feet blades and height of 364feet and together supply about 40 to 50 percent of the electricity used by the Narragansett Bay Commission's (NBC) regional waste and storm water treatment facility.[9] [10] [11]
A single 413feet turbine in North Kingstown came on line in 2012.[12] [13]
Construction for the Block Island Wind Farm began in 2015. It came online at the end of 2016.
PlotData= color:pink width:20 bar:2005 from:start till:0 text:0 bar:2006 from:start till:0.7 text:0.7 bar:2007 from:start till:0.7 text:0.7 bar:2008 from:start till:0.7 text:0.7 bar:2009 from:start till:2.4 text:2.4 bar:2010 from:start till:2.4 text:2.4 bar:2011 from:start till:2 text:2 bar:2012 from:start till:9 text:9 bar:2013 from:start till:9 text:9 bar:2014 from:start till:9 text:9 bar:2015 from:start till:9 text:9 bar:2016 from:start till:52 text:52 bar:2017 from:start till:54 text:54 bar:2018 from:start till:75 text:75 bar:2019 from:start till:75 text:75 bar:2020 from:start till:75 text:75 | |
Megawatts of Wind Capacity [14] |
Ten 1.5-megawatt turbines in Coventry have been proposed[15] [16] [17] [18]
In 2009, the municipalities on the shores of the Easy Bay and Aquidneck & Conanicut Island formed an advisory group that worked through the legislative session of 2012 to build a wind-farm. The group consisted of professionals and community leaders, and sought to determine the viability of a wind-power facility in the hills of Tiverton near RI route 24 and the border with Fall River, Massachusetts. The group generated over two years of wind data from the Tiverton heights. The 10 turbine development project would have provided energy to the East Bay and islands directly via an agreement with National Grid. Legislation to establish a legal entity died in the Rhode Island General Assembly in 2012 over disagreements concerning state powers.[19] Earlier in 2012, Apex Wind Energy competed in courting the City of Tiverton for use of the land, which included a proposed-but-never-built industrial park, and segments of Tiverton Water Department and North Tiverton Fire Department land.[20]
In fall of 2011, Deep Water Wind submitted plans for a massive 200 turbine wind facility 25 miles from shore in federal waters. The facility would provide power to New England and Long Island communities.[21]
In 2011, Charlestown became the first municipality in the United States to pass a ban on any size or type of electricity-generating wind turbines. The sweeping prohibition applies to large commercial as well as smaller residential turbines.[22]