Wind power in New York explained

New York has 2,192 MW of installed wind power capacity as of 2022.[1] Most of New York's wind power is located in upstate New York as onshore wind farms. New York has set a goal of developing 9,000 MW of offshore installed wind power capacity by 2035 that will power an estimated 6 million homes. As of October 2022, New York has five offshore wind farms in development with approximately 4,300 MW installed capacity.[2]

Wind farms

The first wind farms in New York came online in 2000. They were relatively small projects. Madison Wind Farm, with a nameplate generating capacity of 11.55 MW, located in Madison County, was the first to commence operations. Also that year, the 6.6 MW Wethersfield Wind Farm, located in Wyoming County, came on line. The following year, the 30 MW Fenner Wind Farm, also in Madison County, commenced operations.

Five years passed before Maple Ridge Wind Farm, the largest wind farm in the state of New York, located in Lewis County, with 195 Vestas model V82 1.65 megawatt (MW) wind turbines, commenced operations.[3] [4] Collectively, the turbines have a rated or nameplate capacity of 320 MW.[5] Maple Ridge Wind Farm became fully operational in January 2006.

The Bliss Windpark in Wyoming County opened in May 2008 with a capacity of 100.5 megawatts. Also, in 2008, the 100.5 MW Clinton Windpark, located in Clinton County, commenced operations. In February 2009, three other large wind farms — the Altona, Chateaugay, and Wethersfield Windparks — were completed in Upstate New York in Clinton, Franklin, and Wyoming Counties, respectively. The projects have an installed capacity of 97.5, 106.5, and 124 MW respectively. All four use General Electric 1.5SLE wind turbines.[6] The 112.5 MW Sheldon Wind Project in Wyoming County also came on line in 2009. In 2010, the Hardscrabble Wind Farm located in Herkimer County was constructed in the Towns of Farfield, Norway, and Little Falls, NY. The wind farm has 37 Gamesa G90 2.0 MW wind turbines and came online in 2011. The project generates 74 Megawatts of power and is owned by Iberdrola Renewables. In 2012, the 215 MW Marble River Wind Farm, located in Clinton County, commenced operations. Wind farms completed in 2018 include Arkwright Summit Wind Farm and Copenhagen Wind Farm.[7]

The capacity factor of wind farms in New York is about 30 percent. However, the effective capacity — the fraction of rated power generated during summer afternoons, the period of peak demand — is estimated to be 10 percent for the whole state, except for Long Island where about 40% is forecast.[8]

Wind power development

Wind is a very powerful element in society, and is able to provide energy without emitting greenhouse gases. Therefore, able to make a valid contribution to electricity demands. More than a quarter of power of the athletic complex at Union College of Schenectady County is supported by the endorsement of tall wind turbines. In 2014, energy projects accounted for more than 1,800 MW. Which in return estimated to be around 2.6 of the electric power available from "generation facilities in New York" and able to provide power for a million residents. While two power projects are being constructed in the state of New York, there is also a project under "active review." Wind energy development itself has striven towards achieving the goals of New York's renewable energy.

This series of projects is just a start for the 15th windiest state in the Nation, New York. The National Renewable Energy Laboratory has confirmed that the wind resource is able to provide at least half of the needs of the states electricity.

A NYISO study conducted in 2010, Growing Wind: Final Report of the NYISO 2010 Wind Generation Study (Sept. 2010), found that the New York power system will allow for the integration of up to 8,000 MW of wind generation with no adverse reliability impacts. At higher levels of wind generation, due to increased variability, the analysis determined that for every 1,000 MW increase between the 4,250 MW and 8,000 MW wind penetration level, the average regulation requirement increases approximately 9 percent. Further, given existing transmission constraints, at the 6,000 MW scenario modeled, 8.8% of the energy production in three areas of upstate New York (Zones C - Central, D - North, and E - Mohawk) would be "bottled" or undeliverable. With upgrades, the amount of bottled wind energy could be reduced to less than 2 percent. A similar bottling pattern was found in the 8,000 MW model. Offshore wind energy, as modeled, is fully deliverable.[9]

In January 2015, Sims Municipal Recycling (a division of Sims Metal Management) inaugurated the New York City's only commercial-scale wind turbine at its recycling center at the South Brooklyn Marine Terminal. Built by Northern Power Systems at the cost of about $750,000, the 160feet tall turbine has the capacity to produce 100 kilowatts, or 4% of the center's power needs.[10] [11]

Offshore wind power

See main article: Offshore wind power in the United States and List of offshore wind farms in the United States. In 2009, utilities in the state such as the New York Power Authority and Long Island Power Authority were exploring the possibility of large-scale offshore facilities, either in the ocean [12] or in the Great Lakes.[13] The New York Power Authority cancelled, in 2011, the Great Lakes Offshore Wind (GLOW) project.[14]

See also: Empire Wind. On September 8, 2011, the New York Power Authority, Long Island Power Authority, and Con Edison (the Offshore Wind Collaborative) filed a request with the US Department of the Interior, Bureau of Ocean Energy Management (BOEM) to issue a commercial lease on the outer continental shelf to the New York Power Authority for the development of the Long Island - New York City Offshore Wind Project. This project would be located in the Atlantic Ocean off Nassau County, approximately 13 nautical miles off Rockaway Peninsula, in a long 65,000-acre wedge-shaped area between shipping channels, directionally aligned southwest of Rockaway Peninsula. The project as now configured consists of 97 offshore turbines, with a total nameplate generating capacity of 350 MW. With 194 turbines, generating capacity could be doubled to 700 MW. Given the lengthy permitting process, the Collaborative's proposed project would not be operational until 2018 at the earliest. On January 4, 2013, BOEM issued a Request for Interest (Docket ID: BOEM-2012-0083) to determine whether other parties were interested in developing the same area. In addition to the Collaborative's response, BOEM received letters of interest in a commercial lease for this area from Fishermen's Energy LLC and Energy Management, Inc.[15]

See also: South Fork Wind Farm. Another offshore wind energy project that would supply electricity to New York is Deepwater ONE. On September 12, 2013, BOEM awarded two commercial offshore wind energy leases, OCS-A-0486 and OCS-A-0487, to Deepwater Wind New England LLC for development of a regional offshore wind energy project.[16] Deepwater ONE (formerly Deepwater Wind Energy Center) would be located in the Atlantic Ocean on 256 square miles on the outer continental shelf, approximately 30 miles east of Montauk, New York, and 15 miles east of Martha's Vineyard, Massachusetts. The project would consist of 150 to 200 turbines with a total nameplate generating capacity of 900 to 1,200 MW. It includes a 98-mile, 600 MW submarine transmission line, a new regional HVDC transmission system, and a New York-Long Island interconnector to link the electrical supply system in New England and Long Island.[17]

In October 2023, New York awarded three additional offshore wind projects with 4,032 MW capacity.

List of NYSERDA Contracted Wind Projects in New York State[18] [19] !Project!Developer!Capacity(MW)!Projected Completion
Beacon WindEquinor Wind US LLC1,2302028
Empire Wind 2Equinor Wind US LLC1,2602027
Empire Wind 1Equinor Wind US LLC8162026
Sunrise WindSunrise Wind LLC9242025
South Fork Wind FarmØrsted and Eversource1302023
Attentive Energy OneTotalEnergies, Rise Light & Power and Corio Generation1,4042030
Community Offshore WindRWE Offshore Renewables and National Grid Ventures1,314 MW2030
Excelsior WindVineyard Offshore (Copenhagen Infrastructure Partners)1,314 MW2030

Renewable energy incentives

Renewable Portfolio Standard

The New York State Public Service Commission adopted a Renewable Portfolio Standard (RPS) policy in 2004, calling for an increase in renewable energy used in the state from the then-current level of 19.3 percent (largely attributable to legacy hydroelectric power projects) to at least 25 percent by the end of 2013. In 2010, the Commission raised the standard to 30 percent by the end of 2015, and extended the program through 2015. With the RPS program due to sunset in 2015, the Commission has undertaken a program review. Unlike most states with an RPS, New York follows a central procurement model, with the New York State Energy Research and Development Authority (NYSERDA) responsible for meeting the majority of the RPS goals. NYSERDA obtains the bulk of the RPS Attributes (including any and all reductions in harmful pollutants and emissions such as carbon dioxide and oxides of sulfur and nitrogen) through a "Main Tier" competitive procurement of utility-scale renewable resources. A "Customer-Sited Tier," smaller, behind-the-meter resources provided by residential, commercial, institutional, and governmental projects, complements the Main Tier. Voluntary markets, state agency purchases, and Long Island Power Authority purchases make up the balance.[20]

Wind power is the predominant generating technology in the Main Tier, with 21 wind farms generating or expected to generate 1,696 MW of new renewable energy by the end of 2014. As of the end of 2013, 18 wind farms funded through the Main Tier were generating 1,657 MW of new renewable energy.[21]

Financial incentives

The New York State Energy Research and Development Authority (NYSERDA), through its On-Site Wind Turbine Incentive Program (which began in 2007), is making $13.8 million available in incentives to encourage the installation of residential, commercial, institutional, and governmental end-use wind energy systems. The program runs from December 1, 2012 through December 31, 2015, with completed applications accepted through September 30, 2015. NYSERDA will pay up to 50 percent of the total installed cost of the wind energy system to eligible installers who install new approved, grid-connected systems using qualified equipment in accordance with eligibility requirements. The installer must pass the entire incentive through to the customer. The maximum incentive is $1 million per site or customer, and the maximum turbine size is 2 MW (2,000 kW).[22]

Procedural reforms

With a strong tradition of home rule and, for many year, no state requirements or guidelines for locating facilities, the siting of large facilities in New York state has generated some controversy, along with myriad, diverse municipal efforts to zone or ban wind farms. Such conditions helped to produce in summer 2009 a Code of Conduct [23] promulgated by the state's Attorney General Andrew Cuomo and embraced by wind developers responsible for a majority of the state's facilities.

In a significant reform aimed at encouraging investment in clean energy technology, Governor Andrew Cuomo on August 4, 2011, signed into law the Power New York Act of 2011, Chapter 388 of the Laws of 2011, enacting Article 10 of the Public Service Law, establishing a unified siting review process for major electric generating facilities; that is, facilities with a generating capacity of 25 MW or more. The New York Department of Public Service and the New York Department of Environmental Conservation adopted implementing regulations on July 17, 2012: Chapter X Certification of Major Electric Generating Facilities, 16 NYCRR Part 1000 and Analyzing Environmental Justice Issues in Siting of Major Electric Generating Facilities, 6 NYCRR Part 487. After July 17, 2012, all applicants for permits to construct major electric generating facilities must follow Article 10. In addition, applicants who had applied for permits or licenses before that date, along with applicants for permits or licenses for certain other types of electric generating facilities excluded from Article 10, may elect to follow Article 10.

Article 10 creates an administrative agency lodged within the Department of Public Service, the Board on Electric Generation Siting and the Environment, to conduct the reviews and make final administrative siting decisions. The Board has seven members; five are agency heads (the "Permanent Board") and two are appointed on a project-specific basis (the local, ad hoc public members). The new law provides a unified review process for the state permits, licenses, and other approvals required to site, construct, and operate a major electric generating facility. Department of Environmental Conservation review of permit applications under federally delegated or approved Clean Air Act, Clean Water Act, and Resource Conservation and Recovery Act programs is coordinated with, and conducted through, the Article 10 review. The Department of State's coastal zone consistency determination is also coordinated with the Article 10 review. Federal permitting and licensing reviews may be coordinated with the Article 10 review. Article 10 provides for consideration of local laws, and Board decisions must provide reasons for deviation from local substantive requirements. Article 10 seeks to promote early and effective public participation in the siting process, facilitating communication between the applicant and interested persons, to minimize later delays and reduce the likelihood of litigation challenging siting decisions. It provides numerous public participation opportunities, including the distribution of "intervenor funds" derived from application fees to enable municipalities and local parties to hire technical experts and lawyers to assist them in participating in the proceeding.[24]

Further, an expansion of the state's net metering laws in 2008 may help to grow the market for small-scale residential, agricultural, or commercial installations.

Installed capacity

New York Wind Generation by Year
ImageSize = width:280 height:auto barincrement:22PlotArea = left:33 bottom:20 top:10 right:10AlignBars = justifyDateFormat = yyyyPeriod = from:0 till:5000TimeAxis = orientation:horizontalScaleMajor = unit:year increment:750 start:750

PlotData= color:skyblue width:20 bar:2001 from:start till:20 text:20 bar:2002 from:start till:82 text:82 bar:2003 from:start till:41 text:41 bar:2004 from:start till:118 text:118 bar:2005 from:start till:102 text:102 bar:2006 from:start till:656 text:656 bar:2007 from:start till:832 text:832 bar:2008 from:start till:1251 text:1,251 bar:2009 from:start till:2266 text:2,266 bar:2010 from:start till:2595 text:2,595 bar:2011 from:start till:2831 text:2,831 bar:2012 from:start till:2992 text:2,992 bar:2013 from:start till:3539 text:3,539 bar:2014 from:start till:3968 text:3,968 bar:2015 from:start till:3977 text:3,977 bar:2016 from:start till:3940 text:3,940 bar:2017 from:start till:4235 text:4,235 bar:2018 from:start till:3998 text:3,998 bar:2019 from:start till:4457 text:4,457 bar:2020 from:start till:4523 text:4,523 bar:2021 from:start till:4388 text:4,388

Thousand Megawatt-hours[25] [26] [27]
New York wind power capacity by year (MW)[28]
Year Amount Change % Change
1999 align=right 0 align=right 0 align=right 0%
2000 align=right 18.2 align=right 18.2 align=right
2001 align=right 48.2 align=right 30 align=right
2002 align=right 48.5 align=right 0.3 align=right
2003 align=right 48.5 align=right 0 align=right 0%
2004 align=right 48.5 align=right 0 align=right 0%
2005 align=right 185.5 align=right 136.5 align=right 283%
2006 align=right 370.3 align=right 185.3 align=right 100%
2007 align=right 424.8 align=right 54.5 align=right 15%
2008 align=right 831.8 align=right 407 align=right 96%
2009 align=right 1,274.3 align=right 442.5 align=right 53%
2010 align=right 1,274.3 align=right 0 align=right 0%
2011 align=right 1,403 align=right 128.7 align=right 10%
2012 align=right 1,638 align=right 235 align=right 17%
2013 align=right 1,722 align=right 84 align=right 5%
2014 align=right 1,748 align=right 26 align=right 2%
2015 align=right 1,749 align=right 1 align=right 5%
2016 align=right 1,827 align=right 78 align=right
2017 align=right 1,829 align=right 2 align=right 1%
2018 align=right 1,987 align=right 158 align=right 8%
2019 align=right 1,987 align=right 0 align=right 0%
2020 align=right 1,987 align=rught align=right

Wind generation

New York Wind Generation (GWh, Million kWh)
YearTotalJanFebMarAprMayJunJulAugSepOctNovDec
2001 23 2 1 2 2 2 2 2 2 2 2 2 2
2002 82 5 5 5 5 5 6 6 6 5 5 5 24
2003 41 3 3 4 3 3 3 3 3 3 4 4 5
2004 118 13 11 13 11 10 7 6 5 6 9 12 15
2005 102 9 9 11 8 6 5 5 5 8 8 15 13
2006 656 59 61 54 55 42 33 46 38 47 68 53 100
2007 832 84 93 107 87 45 50 44 51 55 65 73 78
2008 1,251 109 85 88 83 110 157 88 62 68 94 99 208
2009 2,266 163 208 176 298 222 96 153 128 134 184 202 302
2010 2,595 230 206 238 236 196 173 157 157 235 255 257 255
2011 2,831 178 326 312 325 187 173 146 157 151 242 330 304
2012 2,992 394 308 321 274 168 206 123 149 184 271 242 352
2013 3,539 422 290 312 404 280 207 145 180 205 299 445 350
2014 3,968 456 368 399 443 288 189 236 185 239 362 472 331
2015 3,977 488 343 440 395 318 220 184 195 189 390 415 401
2016 3,940 480 437 388 257 236 278 219 214 195 327 371 538
2017 4,236 368 384 427 418 360 327 249 218 250 409 479 347
2018 3,998 451 427 305 360 323 244 233 241 260 381 389 384
2019 4,457 465 414 471 449 301 328 242 255 278 393 372 489
2020 4,523 385 391 472 451 318 242 273 247 352 376 563 453
2021 4,389 315 378 535 382 325 343 233 239 341 366 415 517
2022 4,788 417 485 507 462 355 327 299 239 268 406 510 513
2023 1,489 368 568 553

Teal background indicates the largest wind generation month for the year.

Green background indicates the largest wind generation month to date.

Source:

See also

External links

Notes and References

  1. Web site: WINDExchange: Wind Energy in New York . 2022-10-30 . windexchange.energy.gov . en-US.
  2. Web site: 2022 Solicitation . 2022-10-30 . NYSERDA . en.
  3. Web site: Major US order for Vestas Wind Systems . . 2005-04-07 . 2008-09-07.
  4. Web site: Maple Ridge Wind Farm . . 2008-09-07.
  5. Web site: Maple Ridge Wind Farm Landmark Project Will Quadruple New York Wind Energy Capacity . Climate Change Chronicles. April 7, 2005 . 2006-05-16.
  6. http://www.renewableenergyworld.com/rea/news/story?id=54646 330 MW of Wind Power Go Online in New York
  7. Web site: U.S. Wind Turbine Database . 12 August 2019.
  8. Web site: The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations - Report on Phase 2 . New York State Energy Research and Development Authority . March 4, 2005 . 2009-05-02 . PDF . 7.16 . Capacity factors of inland wind sites in New York are on the order of 30% of their rated capacity. Their effective capacities, however, are about 10%, due to both the seasonal and daily patterns of the wind generation being largely “out of phase” with the NYISO load patterns. The offshore site in Long Island exhibits both annual and peak period effective capacities on the order of 40%..
  9. http://www.nyiso.com/public/webdocs/media_room/press_releases/2010/Child_New_York_Grid_Ready_for_More_Wind_093010/GROWING_WIND_-_Final_Report_of_the_NYISO_2010_Wind_Generation_Study.pdf New York Independent System Operator, Growing Wind: Final Report of the NYISO 2010 Wind Generation Study (Sept. 2010)
  10. News: Giambusso . David . Recycling firm unveils city's first commercial wind turbine . CapitalNeYork . January 15, 2015 . 2015-02-22.
  11. News: Schlossbergian . Tatiana . In Brooklyn, Fertile Ground for a Wind Turbine . The New York Times . January 15, 2015 . 2015-02-22.
  12. http://www.linycoffshorewind.com/ Long Island – New York City Offshore Wind Project
  13. New York State Board on Electric Generation Siting and the Environment http://www.nypa.gov/nypawindpower/ New York Port Authority Wind Power
  14. http://www.nypa.gov/Press/2011/110927b.html Press Release
  15. http://www.boem.gov/Renewable-Energy-Program/State-Activities/New-York.aspx US Bureau of Ocean Energy Management: New York Activities
  16. http://www.boem.gov/Commercial-Wind-Lease-Rhode-Island-and-Massachusetts/ US Bureau of Ocean Energy Management, Commercial Wind Leases for the Wind Energy Area Offshore Rhode Island and Massachusetts
  17. http://dwwind.com/dww-deepwater-one/ Deepwater Wind: Deepwater ONE
  18. Web site: New York's Offshore Wind Projects . 2022-10-30 . NYSERDA . en.
  19. Web site: Governor Hochul Announces Nation’s Largest-Ever State Investment in Renewable Energy is Moving Forward in New York Governor Kathy Hochul . 2023-10-24 . www.governor.ny.gov . en.
  20. http://www3.dps.ny.gov/W/PSCWeb.nsf/All/1008ED2F934294AE85257687006F38BD?OpenDocument New York State Public Service Commission, Renewable Portfolio Standard (Case 03-E-0188)
  21. New York State Energy Research and Development Authority, New York State Renewable Portfolio Standard: Annual Performance Report Through December 31, 2013 (Final Report 2014).
  22. http://www.nyserda.ny.gov/Funding-Opportunities/Current-Funding-Opportunities/PON-2439-On-Site-Wind-Turbine-Incentive-Program.aspx NYSERDA On-Site Wind Turbine Incentive Program
  23. http://windpowerlaw.info/2009/07/30/new-york-attorney-general-announces-17-wind-developers-sign-new-code-of-conduct New York Attorney General announces 17 wind developers sign new code of conduct
  24. http://www.dps.ny.gov/SitingBoard/ New York State Board on Electric Generation Siting and the Environment
  25. Web site: Electricity Data Browser . U.S. Department of Energy . March 28, 2018 . March 28, 2018 .
  26. Web site: Installed Wind Capacity by State . Office of Energy Efficiency and Renewable Energy . Office of Energy Efficiency and Renewable Energy . . Mar 12, 2010 . Mar 12, 2010 .
  27. https://windexchange.energy.gov/states/ny Wind Energy in New York
  28. https://windexchange.energy.gov/maps-data/321 WINDExchange: U.S. Installed and Potential Wind Power Capacity and Generation