Wind power in California had initiative and early development during Governor Jerry Brown's first two terms in the late 1970s and early 1980s.[1] [2] The state's wind power capacity has grown by nearly 350% since 2001, when it was less than 1,700 MW.[3] [4] In 2016, wind energy (including that supplied by other states) supplied about 6.9% of California's total electricity needs, or enough to power more than 1.3 million households.[5] Most of California's wind generation is found in the Tehachapi area of Kern County, California, with some large projects in Solano, Contra Costa and Riverside counties as well. California is among the states with the largest amount of installed wind power capacity. In recent years, California has lagged behind other states when it comes to the installation of wind power. It was ranked 4th overall for wind power electrical generation at the end of 2016 behind Texas, Iowa, and Oklahoma. As of 2019, California had 5,973 megawatts (MW) of wind power generating capacity installed.
California was the first U.S. state where large wind farms were developed, beginning in the early 1980s.[6] By 1995, California produced 30 percent of the entire world's wind-generated electricity.[7] Wind power in Texas surpassed the production in California to become the leader in the United States.
Historically, most of California's wind power output has been in three primary regions: Altamont Pass wind farm (east of San Francisco); Tehachapi Pass wind farm (south east of Bakersfield) and San Gorgonio Pass wind farm (near Palm Springs, east of Los Angeles).[7] A fourth area, the Montezuma Hills of Solano County, was developed in 2005–2009, with the large Shiloh wind power plant.
The Alta Wind Energy Center is a wind farm located in Tehachapi Pass in Kern County.[8] Kern County is reviewing a number of other proposed wind projects that would generate a combined 4,600 megawatts of renewable energy if approved.[9]
Name | Location | Capacity (MW) | Status | ||
---|---|---|---|---|---|
576 | Operational | [10] | |||
1548 | Operational | [11] | |||
315 | Operational | [12] | |||
615 | Operational | ||||
505 | Operational | [13] | |||
705 | Operational | ||||
131.1 | Operational |
California wind generation capacity by year | California wind generation by year | |
---|---|---|
PlotData= color:coral width:20 bar:1999 from:start till:1616 text:1,616 bar:2000 from:start till:1616 text:1,616 bar:2001 from:start till:1683.1 text:1,683.1 bar:2002 from:start till:1823.1 text:1,823.1 bar:2003 from:start till:2024.9 text:2,024.9 bar:2004 from:start till:2095 text:2,095 bar:2005 from:start till:2149.5 text:2,149.5 bar:2006 from:start till:2376.1 text:2,376.1 bar:2007 from:start till:2439.1 text:2,439.1 bar:2008 from:start till:2536.7 text:2,536.7 bar:2009 from:start till:2798 text:2,798 bar:2010 from:start till:3252.6 text:3,252.6 bar:2011 from:start till:3917 text:3,917 bar:2012 from:start till:5542 text:5,542 bar:2013 from:start till:5830 text:5,830 bar:2014 from:start till:5917 text:5,917 bar:2015 from:start till:6108 text:6,108 bar:2016 from:start till:5662 text:5,662 bar:2017 from:start till:5609 text:5,609 bar:2018 from:start till:5885 text:5,885 bar:2019 from:start till:5973 text:5,973 bar:2020 from:start till:5922 text:5,922 bar:2021 from:start till:6142 text:6,142 | PlotData= color:lightorange width:20 bar:2001 from:start till:3499 text:3,499 bar:2002 from:start till:3800 text:3,800 bar:2003 from:start till:3896 text:3,896 bar:2004 from:start till:4305 text:4,305 bar:2005 from:start till:4261 text:4,261 bar:2006 from:start till:4883 text:4,883 bar:2007 from:start till:5586 text:5,586 bar:2008 from:start till:5385 text:5,385 bar:2009 from:start till:5840 text:5,840 bar:2010 from:start till:6080 text:6,080 bar:2011 from:start till:7749 text:7,749 bar:2012 from:start till:9754 text:9,754 bar:2013 from:start till:12820 text:12,820 bar:2014 from:start till:12993 text:12,993 bar:2015 from:start till:12229 text:12,229 bar:2016 from:start till:13508 text:13,508 bar:2017 from:start till:12824 text:12,824 bar:2018 from:start till:14025 text:14,025 bar:2019 from:start till:13736 text:13,736 bar:2020 from:start till:13582 text:13,582 bar:2021 from:start till:15628 text:15,628 bar:2022 from:start till:16018 text:16,018 | |
Megawatts of wind capacity, 1999-2020[14] [15] | Gigawatt-hours generated per year, 2001-2020[16] |
California had a total of 5,662 megawatts of installed wind generation capacity at the end of 2015.[20] After leading the country for many years, California ranked fourth nationwide in terms of capacity, behind Texas, Iowa, and Oklahoma in 2016.[21] [22] In 2016, California used about 285,700 GWh[23] and generated 13,500 GWh of wind energy in state.[24]
Wind energy supplied about 6.9% of California's total electricity needs in 2017 (including power supplied from other states in this case), and 7.35% in 2019. By the end of 2019, installed wind generation capacity increased to 5,973 megawatts.[25]
Due to higher average winds in the plains area of the U.S., California ranked fifth in wind generation in 2018.[26]
In January 2018, the Tule Wind Project came online. Located in eastern San Diego County, the facility has 57 wind turbines which collectively generate 131.1 megawatts of electricity. There are plans to expand this project by an additional 24 turbines in the future.[27] In its current configuration, the installation is able to power an estimated 40,000 homes.[28] CAISO tested the wind farm's synchronverter in 2018, and found it could perform some of the grid services similar or better than traditional generators.[29] [30]
In February 2018, Scout Clean Energy of Colorado won the rights to modernize the Gonzaga Ridge wind farm which is located in Pacheco State Park. Rated at 16.5 megawatts, the Gonzaga Ridge facility currently uses 1980s era wind turbines which are smaller, less cost-effective, and overall far less efficient at generating energy than those which currently being produced. The electrical output of Gonzaga Ridge after modernization is projected to be between 65 MW and 80 MW.[31]
A 2009 Stanford University study of California offshore wind potential identified a site off Cape Mendocino that could provide uninterrupted year-round power from a 1500 MW wind farm that would produce an average of 790 MW. Three types of offshore wind power were studied, with the conclusion that from 12,300 to 19,700 GWh/yr could be delivered from 1,997 to 3,331 MW of monopile wind turbines installed in up to 20meter, from 38,200 to 73,000 GWh/yr could be delivered from 6,202 to 12,374 MW of multi-leg wind turbines in 20to, and from 462,100 to 568,200 GWh/yr from 73,025 to 91,707 MW of floating turbine foundation wind turbines in from 50to,[32] such as those being studied for use off the coast of Maine by the Ocean Energy Institute and the DeepCwind Consortium.[33]
In April 2018, several power development companies joined with Redwood Coast Energy Authority to explore the idea of creating a large-scale wind farm off of the Northern California coast. Deep water has hindered development off the coast of California, making the use floating turbines more feasible than fixed turbines. The group decided to propose instead. RCEA and the development companies intended to file a lease with the Bureau of Ocean Energy Management in the summer of 2018 for the 120-150 MW project.[34] The Humboldt Project will be located just over west of Eureka, California and estimates have the date of completion to be sometime in 2024.[35] In 2022, the US Bureau of Ocean Energy Management (BOEM) issued a statement of no significant environmental impact,[36] and California set a target of 25 GW of offshore wind by 2045.[37]
California wind generation (GWh) | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Year | Total | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
2001 | 3,499 | 133 | 148 | 300 | 393 | 378 | 438 | 440 | 408 | 293 | 253 | 143 | 172 | |
2002 | 3,800 | 131 | 153 | 267 | 409 | 478 | 557 | 443 | 476 | 295 | 284 | 158 | 149 | |
2003 | 3,896 | 109 | 193 | 326 | 424 | 453 | 549 | 432 | 396 | 340 | 285 | 188 | 201 | |
2004 | 4,305 | 130 | 201 | 288 | 399 | 634 | 683 | 588 | 492 | 359 | 259 | 155 | 117 | |
2005 | 4,261 | 175 | 150 | 334 | 429 | 551 | 584 | 497 | 384 | 404 | 322 | 217 | 214 | |
2006 | 4,883 | 281 | 215 | 389 | 430 | 577 | 596 | 538 | 500 | 402 | 396 | 292 | 267 | |
2007 | 5,586 | 233 | 307 | 442 | 612 | 732 | 729 | 675 | 600 | 486 | 349 | 188 | 233 | |
2008 | 5,385 | 271 | 262 | 450 | 538 | 691 | 658 | 700 | 648 | 406 | 298 | 223 | 240 | |
2009 | 5,840 | 150 | 245 | 442 | 603 | 701 | 850 | 879 | 679 | 480 | 406 | 235 | 170 | |
2010 | 6,080 | 150 | 221 | 399 | 546 | 689 | 867 | 925 | 731 | 551 | 372 | 305 | 324 | |
2011 | 7,749 | 234 | 429 | 612 | 960 | 1,026 | 1,021 | 869 | 908 | 522 | 415 | 428 | 325 | |
2012 | 9,754 | 419 | 581 | 769 | 768 | 1,316 | 1,362 | 1,001 | 1,001 | 697 | 776 | 385 | 679 | |
2013 | 12,820 | 482 | 727 | 1,056 | 1,550 | 1,740 | 1,631 | 1,413 | 1,297 | 1,158 | 750 | 556 | 460 | |
2014 | 12,993 | 500 | 831 | 1,055 | 1,306 | 1,766 | 1,858 | 1,408 | 1,286 | 953 | 759 | 705 | 566 | |
2015 | 12,229 | 187 | 619 | 826 | 1,262 | 1,681 | 1,668 | 1,445 | 1,523 | 815 | 667 | 619 | 917 | |
2016 | 13,508 | 691 | 528 | 1,305 | 1,325 | 1,596 | 1,670 | 1,697 | 1,472 | 996 | 935 | 528 | 765 | |
2017 | 12,824 | 815 | 751 | 954 | 1,212 | 1,644 | 1,638 | 1,417 | 1,642 | 1,217 | 839 | 452 | 243 | |
2018 | 14,025 | 424 | 887 | 1,060 | 1,234 | 1,929 | 1,784 | 1,565 | 1,645 | 1,259 | 1,029 | 639 | 570 | |
2019 | 13,736 | 537 | 1,054 | 1,091 | 1,475 | 1,838 | 1,564 | 1,674 | 1,469 | 1,210 | 877 | 467 | 480 | |
2020 | 13,582 | 763 | 780 | 1,131 | 1,521 | 1,553 | 1,722 | 1,691 | 1,440 | 797 | 868 | 664 | 652 | |
2021 | 15,628 | 1,065 | 1,041 | 1,590 | 1,645 | 1,676 | 1,336 | 1,093 | 1,331 | 1,011 | 1,268 | 1,187 | 1,385 | |
2022 | 16,018 | 1,187 | 1,204 | 1,551 | 1,746 | 1,864 | 1,503 | 1,473 | 1,105 | 888 | 1,006 | 1,284 | 1,207 | |
2023 | 4,223 | 1,381 | 1,305 | 1,537 |