West Lake Corridor Explained

West Lake Corridor
Type:Commuter rail
System:South Shore Line
Status:Under construction
Locale:Lake County, Indiana, United States
Planopen:May 2025[1]
Operator:NICTD
Stock:Nippon Sharyo NICTD EMUs
Linelength:9miles
Tracks:1 + passing sidings
Electrification:Overhead catenary, 1500 V DC
Map State:collapsed

The West Lake Corridor project, to be called the Monon Corridor upon opening,[2] [3] is an under-construction commuter rail line in Lake County, Indiana. New South Shore Line services are planned to connect the towns of Munster and Dyer in Indiana with Hammond, Indiana and Chicago, Illinois.

History

New Start Studies

In mid-2000s, the population and commercial growth in Lake and Porter counties in Northwest Indiana was outstripping projections.[4] The Northern Indiana Commuter Transportation District determined that if the growth continued, it would be necessary to add another branch to the South Shore Line commuter rail. In 2006, planning proceeded for an extension to Valparaiso, Indiana, but the project was deemed unqualified for federal funding, and the NICTD was unable to confidently attain trackage rights on the Canadian National Railway line to Valparaiso.[5] By 2008 a new study indicated that the Valparaiso to Munster branch would not generate sufficient ridership and was dropped from the plan.[6]

In 2017, the NICTD began demolition of houses between Hanover and Brunswick streets to begin building a new station, where trains would interchange with the main line.[7]

Capital Investment Grant Program

In March 2019, the Federal Transit Administration (FTA) gave the project a favorable rating meaning the project could qualify for funding from the Capital Investment Grant Program. NICTD anticipated to be awarded funding the following spring with construction beginning later in the year.[8] That October, the FTA approved the project moving it into its engineering phase.[9]

Construction

A groundbreaking ceremony was held on October 28, 2020, which included the signing of a full funding grant between the FTA and NICTD.[10] [11]

Alignment

Traveling southbound, the new branch leaves the existing main line immediately before the current Hammond station.[12] From Hammond south, the line follows the route of Monon Trail until it reaches Maynard Junction. The Monon Trail will be retained, but follow a new alignment. At Maynard Junction, the Corridor will have a flyover over the EJ&E/CSX tracks, and then will follow new tracks built immediately west of the CSX right-of-way.

Due to financial constraints, the initial segment will not extend to St. John or Lowell, but provisions will be made for future extension.[13]

NICTD is not constructing a station serving Hammond's downtown area. However, as part of its plans to revitalize its downtown, the city of Hammond plans to construct a downtown station itself at Russell Street, along a section of elevated track. While preparatory work is to be done coinciding with the construction of the West Lake Corridor, full construction on the station is not planned to begin until 2025, making the station an infill station to be built after the initial opening of the West Lake Corridor.[14] [15]

Planned Stations in Hammond

Planned Stations in Munster

Service patterns

The new line will directly serve Millennium Station at peak hours with shuttle service between Munster/Dyer and Hammond Gateway for connections to main line services at other times.[16] [17]

See also

References

  1. News: Mills . Wes . Progress continues on Double Track, West Lake Corridor. 27 August 2023 . Lakeshore Public Media . Lakeshore Public Media. 7 July 2023.
  2. News: Gallenberger . Michael . First section of South Shore Line's Double Track to open in coming weeks . 15 June 2024 . Lakeshore Public Media . 2 October 2023 . en.
  3. News: NICTD: Regular train service set to resume between Dune Park and MC in two weeks, shortening bus rides . 15 June 2024 . Chicago Tribune . 2 October 2023.
  4. News: Study: South Shore extension would add jobs, income. Benman. Keith. June 23, 2006. nwi.com. July 16, 2017. en.
  5. Web site: http://www.wjobcalpress.com/1editorialbody.lasso?-token.folder=2006-09-10&-token.story=148557.112113&-token.subpub=. WJOB (Calumet)/AP. September 11, 2006.
  6. News: Study: Valpo-to-Munster SS line would add few riders. Benman. Keith. December 17, 2008. nwi.com. July 16, 2017. en.
  7. News: Gonzalez. Michael. Train plans unsettle Hammond neighborhood. chicagotribune.com. 18 July 2020.
  8. News: FTA gives favorable rating to proposed NICTD commuter-rail extension. Progressive Railroading. March 26, 2019. March 26, 2019.
  9. News: FTA Gives South Shore Line Expansion A Thumbs Up. Keiper. Jennifer. WBBM-AM. October 8, 2019. October 15, 2019.
  10. News: Work to Begin on West Lake Corridor Project. October 28, 2020. November 1, 2020. Inside INdiana Business With Gerry Dick. Brown. Alex.
  11. Web site: Steele . Andrew . WATCH NOW: 8-mile rail line from Hammond to Dyer is on way . nwitimes.com . The Times of Northwest Indiana . 12 November 2020 . en . 28 October 2020.
  12. Web site: Frequently Asked Questions. 2017. West Lake Corridor. 2017-07-16.
  13. West Lake Corridor Draft Environmental Impact Statement (Chapter 2: Alternatives Considered). Simón. Marisol R.. Noland. Michael. 2 December 2016. NICTD. 5. The alignments by alternative were evaluated from cost, feasibility, and freight railroad acceptability perspectives. The analysis concluded that the alignment between Dyer and St. John should be dropped from further consideration primarily because the estimated capital cost would have exceeded the funding that has been identified for the project. It was understood that an extension to St. John or Lowell could be considered in the future.. Federal Transit Administration. USDoT. US Army Corps of Engineers. 16 July 2017. Federal Transit Administration. United States Department of Transportation. United States Army Corps of Engineers.
  14. Web site: Steele . Andrew . Decades of hopes and plans culminate with start of South Shore projects . nwitimes.com . The Times (Munster, Indiana) . 25 May 2022 . en . March 13, 2022.
  15. Web site: Zorn . Tom . Municipalities get on board plans to grow housing, commercial developments as South Shore projects start . Chicago Tribune . 25 May 2022 . March 25, 2022.
  16. West Lake Corridor Draft Environmental Impact Statement (Chapter 2: Alternatives Considered). Simón. Marisol R.. Noland. Michael. 2 December 2016. NICTD. Federal Transit Administration. USDoT. US Army Corps of Engineers. 16 July 2017. Federal Transit Administration. United States Department of Transportation. United States Army Corps of Engineers.
  17. Web site: Chapter 2 Alternatives Considered . NICTD . 18 July 2020.

External links