Wenzhou–Fuzhou railway explained

----Wenzhou–Fuzhou Section
Native Name Lang:zh-hans
Status:Operational
Owner:
Operator:
Depot:Fuzhou
Linelength:298.10NaN0
Tracks:2 (Double-track)
Electrification: (Overhead line)
Speed:2500NaN0
Maxincline:0.6%
Map State:show
Wenzhou–Fuzhou railway
S:温福铁路
T:溫福鐵路
P:Wēnfú Tiělù
Order:st
Wenzhou–Fuzhou railway
Linelength:298.10NaN0
Speed:2000NaN0 max.

The Wenzhou–Fuzhou railway, also known as the Wenfu railway, is a dual-track, electrified, high-speed rail line running between Wenzhou in Zhejiang and Fuzhou, the capital of Fujian. The line has a total length of 298.4km (185.4miles) and forms part of the Hangzhou–Fuzhou–Shenzhen passenger-dedicated railway. Construction began in August 2005, and the line opened to freight traffic on July 1, 2009. Passenger service began on September 28, 2009. Trains running on the line reach top speeds of 250 kilometres per hour, and the shortest trip between Wenzhou and Fuzhou takes 1.5 hours.[1] The line required investment of ¥12.66 billion.[1] To improve connections between Fuzhou and Zhejiang, the government is proposing to build a faster parallel passenger dedicated line called the Wenzhou–Fuzhou high-speed railway.[2] [3]

Route

The Wenzhou–Fuzhou railway follows the rugged but prosperous coast of southern Zhejiang and northern Fujian with 69km (43miles) in the former and 229.1km (142.4miles) in the latter.[1] Bridges and tunnels account for over 78% of the line's total length. Major cities along route include Rui'an, Cangnan, Fuding, Ningde, Luoyuan and Lianjiang.

History

The Wenzhou–Fuzhou railway is the first railway to connect the two neighboring provinces.[1] Most high-speed rail lines in China follow the routes of older conventional railroads, but there were no railways on the southeast coast prior to the building of high-speed rail. Historically, the southeast coastal region relied on maritime transportation, and rugged terrain made railway construction more expensive. In the first half of the 20th century, warfare and political instability delayed railway construction. During the Cold War, the southeast coast faced the threat of invasion from Republic of China on Taiwan and all railways were built inland. Only when political tensions across the Taiwan Strait eased in the late 1990s did planning of the Wenzhou–Fuzhou railway take place.In October 2002, the project was initially approved by the National Development and Reform Commission as a single-track railway at the 140km/h standard. The project was then upgraded to a double-track 200km/h standard and received State Council approval in 2004. Construction on an experimental basis began in December 2004 and on a full-scale in August 2005.[4] Track-laying was completed in April 2009. Freight and passenger service began, respectively on July 1 and September 28, 2009.[4]

Rail connections

Ningbo–Taizhou–Wenzhou railway, Jinhua–Wenzhou railway

Fuzhou–Xiamen railway, Nanping–Fuzhou railway, Xiangtang–Putian railway

Quzhou–Ningde railway

See also

Notes and References

  1. http://english.people.com.cn/90001/90776/90882/6610132.html "China to open Wenzhou-Fuzhou railroad at mid-year" People's Daily
  2. Web site: 交通部与福建省签署协议,温福高铁方案出炉一年后最新消息曝光_霞浦. www.sohu.com. en. 2019-07-03.
  3. Web site: 福建印发《关于建立更加有效的区域协调发展新机制的实施方案》-新闻-上海证券报·中国证券网. news.cnstock.com. 2019-07-03.
  4. Web site: zh-hans . http://www1.www.gov.cn/jrzg/2009-07/01/content_1354627.htm . zh:温福铁路7月1日起通车运营 年内开行动车组列车 . . 2009-07-01.