Wellesley, Western Australia Explained

Type:suburb
Wellesley
City:Bunbury
State:wa
Lga:Shire of Harvey
Local Map:yes
Zoom:10
Coordinates:-33.216°N 115.757°W
Postcode:6233
Dist1:26
Location1:Bunbury
Fedgov:Forrest
Stategov:Murray-Wellington
Near-Nw:Binningup
Near-Ne:Benger
Near-W:Parkfield
Near-E:Brunswick Junction
Near-Sw:Leschenault
Near-S:Australind

Wellesley is a locality in the Bunbury region of Western Australia, about 10 km north-east of Australind. Its local government area is the Shire of Harvey. It is bordered on the south and east by the Brunswick River and the Wellesley River. The main feature of the locality is the Kemerton Industrial Park.

Kemerton Industrial Park

The estate was established in 1985 as a "strategic industrial area" to provide appropriate buffered land for heavy industry. It covers an area of 7543 ha, comprising an industrial core of 2100 ha, a support industry area of 300 ha, an inter-industry buffer of 175 ha and a buffer area of 5437 ha which includes bushland, wetland, protection zones and recreational areas. A rail link connecting with the Perth-Bunbury railway is proposed.[1] It is coordinated by the Department of Industry and Resources (WA), South West Development Commission and the Shire of Harvey.

History

Little is known of the area prior to 1980 - a report in 1988 noted[2] that (p. 9) "although mainly a rural area, a significant portion of the Kemerton site remains undeveloped", and there was "very little agricultural development other than the use of the land for seasonal grazing", possibly due to poor soils and inadequate drainage. The report noted a piggery and an abattoir, the latter of which is still in operation.

Proposed aluminium smelter

In 1980, Alcoa commenced investigations into potential sites for an aluminium smelter. Preliminary documentation given to the Environmental Protection Authority (EPA) indicated that three sites - Worsley Siding, Pinjarra and Kemerton - were preferred. Alcoa subsequently withdrew from the consortium. Shortly after the election of the Burke Labor government, which had in December 1983 launched the "Bunbury 2000" strategy to develop the area, a new consortium, Kukje-ICC Construction trading as International Aluminium Consortium, ruled out Pinjarra as a site. In December 1984, the State Government acquired 3700 hectares of private land at Kemerton to act as a buffer, as the EPA had recommended Kemerton over Worsley Siding due to "fewer uncertainties of ecological interactions, a much better knowledge of potential implications and lower environmental risks".[3] A detailed environmental impact assessment of a proposal by the consortium for a 230,000 tpa smelter was carried out in 1985, and Town Planning Scheme No.10 (Shire of Harvey) was amended to zone the land industrial, but the proposal was deferred indefinitely in 1987 for economic reasons.

Development of the Industrial Park

The rezoning and considerations led to other expressions of interest, and in 1988–1989, several other industries moved into the area and commenced operations, and a draft structure plan was submitted for State Government approval. A new consortium, led by Pennant/John Holland and Wardley Australia Ltd, proposed in February 1989 a single potline smelter with 20% less capacity than the 1985 proposal, but this did not proceed either. The Kemerton Steering Committee (later KIPCC) was formed in April 1989, and at around the same time, a trade magazine article claimed that Kemerton, with its integration of natural bushland, wetland and plantation forestry and an interpretative centre into the planning of the industrial park, "could well become a model for establishing industry as an acceptable land-user in sympathy with environmental values."[4]

Industries

Some of the industries at Kemerton include:

External links

Notes and References

  1. Web site: Kemerton Industrial Park. 24 November 2005. Department of Industry and Resources. 2006-10-03.
  2. Feilman Planning Consultants, Dames & Moore et al. Kemerton Industrial Park - Draft Report, November 1988. Accessed at Battye Library, Perth (Q333.77 KEM).
  3. Quoted in Dames & Moore Kemerton Aluminium Smelter = Public Environment Report, February 1989, pp1, 12-13 (for Kemerton Aluminium Limited). Accessed at Battye Library, Perth.
  4. "Bushland setting - buffer zone for heavy industry", Prospect, Autumn 1989, pp4-5.
  5. Web site: Titanium dioxide pigment. ACTED Consultants. 2006-10-03.
  6. Web site: Major Mineral Resources Projects . South West Development Commission . 2006-10-03 . dead . https://web.archive.org/web/20060820191621/http://www.swdc.wa.gov.au/index.php?pageid=21 . 20 August 2006 .
  7. Web site: Silicon and silicon chemicals. ACTED Consultants. 2006-10-03.
  8. Web site: All purpose power. Reed Business Information. 13 June 2006. 2006-10-03.