Waverley station (MBTA) explained

Style:MBTA
Waverley
Address:525 Trapelo Road
Coordinates:42.3878°N 71.1902°W
Other: MBTA bus:
Platform:2 side platforms
Tracks:2
Passengers:115 (weekday average boardings)
Pass Year:2018
Opened:1860;[1] March 4, 1974
Closed:1958
Rebuilt:1952
Accessible:No
Zone:1
Mapframe:yes
Mapframe-Custom:
Shape:none
Line:none
Marker:rail
Zoom:12

Waverley station is an MBTA Commuter Rail station in Belmont, Massachusetts. It serves the Fitchburg Line. It is located below grade in Waverley Square in the triangle of Trapelo Road, Lexington Street, and Church Street in western Belmont.

History

The Fitchburg Railroad opened through Belmont on December 20, 1843, but no station stop at Waverley Square existed until about 1860. Service on the Central Massachusetts Railroad, which ran parallel to the Fitchburg, began in 1881.[2] The two railroads had separate station buildings, both of which remained in use until somewhat after both railroads were consolidated under the Boston and Maine Railroad (B&M). The tracks originally ran through the square at grade, with level crossings of Trapelo Road and Lexington Street. In August 1951, the town approved an agreement with the state and the B&M for a $1.125 million state-funded project to lower the tracks to eliminate the crossings.[3] The work was completed in 1952, at which time Central Mass Branch trains were moved from their parallel tracks onto the Fitchburg main. All service to Waverley and nearby Belmont Center station ended in 1958.

Service to Belmont Center and Waverley resumed on March 4, 1974. The Central Mass Branch had been discontinued in 1971, so all service was on the South Acton (now Fitchburg) Line. The station building was gone by 1977.[4] Weekend service was discontinued at the two stops on January 30, 1981 as part of general cutbacks, but restored on December 6, 1993.[5]

As part of budget cuts,[6] in 2015, the MBTA was considering an option to shutter the current Waverley station and/or Belmont station(s)[7] due to expenses related to costs for making Waverley ADA-accessible.[8] [9] Plans to combine both stations have been outlined in previous studies as early as 2005. Such works as the Fitchburg Commuter Rail Line Improvement Implementation Plan, released in September 2005 have considered this plan.[10] Other past proposals for altering the station, and in the process raising revenue have included building above the trench style station with a five-story mixed retail and residential development.[11]

External links

Notes and References

  1. Book: Boston's Commuter Rail: The First 150 Years . Humphrey, Thomas J. . Clark, Norton D. . amp . Boston Street Railway Association . 1985 . 9780685412947 . 86–88.
  2. Book: ABC Pathfinder Railway Guide . 16 . 1858 . New England Railway Publishing Company . Google Books.
  3. News: Underpass OK'd for Waverly Sq. at $1,125,000 Cost . Boston Globe . August 3, 1951 . 11 . Newspapers.com.
  4. News: There's no depot like an old depot . Alan P. . Henry . Boston Globe . August 10, 1977 . 3 . Newspapers.com.
  5. News: T changes start today . Boston Globe . February 1, 1981 . 24 . Newspapers.com.
  6. News: TUCKER . FRANKLIN . February 29, 2012 . MBTA Cuts Will Go Deep Into Belmont . Belmont Patch . September 17, 2015 .
  7. News: Berkowitz . Bram . September 17, 2015 . Belmont could be home to new MBTA station . Gatehouse Media, LLC . Wicked Local . September 17, 2015 .
  8. News: TUCKER . FRANKLIN B. . September 16, 2015 . Belmont Could See One, Both MBTA Commuter Stations Closed In Favor of New Stop . The Belmontonian . September 17, 2015 .
  9. Web site: A New Challenge for Belmont and the MBTA . Brownsberger . Will . September 4, 2015 . State Senator . September 17, 2015 .
  10. Web site: MBTA Commuter Rail Fitchburg Branch Improvements . https://web.archive.org/web/20140129070552/http://savetheayertrain.pbworks.com/f/FitchburgImplementation1200.gif . 29 January 2014 . Fitchburg Commuter Rail Line Improvement Implementation Plan . September 2005 . Massachusetts Bay Transportation Authority . 29 January 2014.
  11. News: Cole . Caroline Louise . February 12, 2004 . MBTA air rights eyed for 5-story complex . . September 17, 2015 .