British Columbia Highway 15 Explained

Country:CAN
Type:Hwy
Marker Image:
Province:BC
Type:BC
Route:15
State:WA
Type:WA
Route:543
Highway 15 and State Route 543
Maint:B.C. MoT and WSDOT
Alternate Name:Pacific Highway
176th Street
Map Custom:yes
Map Notes:Highways 15 and 543 highlighted in red.
Length Km:21.77
History:BC: 1913 – present
WA: 1919 – present[1]
Direction A:South
Direction B:North
Section1:Washington State Route 543
Terminus A1: in Blaine, Washington
Terminus B1:Canada–US border
Length Km1:1.75
Length Ref1:[2]
Section2:British Columbia Highway 15
Length Km2:20.02
Length Ref2:[3]
Terminus A2:Canada–US border
Junction2: in Surrey
Golden Ears Way in Surrey
Terminus B2: in Surrey
System1:
Province:BC
System2:
State:WA

Highway 15 (BC 15), known locally as the Pacific Highway, is a 20.99adj=midNaNadj=mid north–south highway primarily located in the City of Surrey, British Columbia. The southern terminus is with Interstate 5 (I-5) near Blaine, Washington, as State Route 543 (SR 543). SR 543 is a 1.09miles connector between I-5 and the Canada–US border, linking with BC 15. Over 3,000 trucks per day pass through the border crossing along SR 543 and BC 15,[4] because the Peace Arch border crossing does not allow commercial trucks.

Route description

SR 543 is a short highway entirely within the city of Blaine, Washington, that connects I-5 with the Canada–United States border. It begins at an interchange with I-5 with access only from the south and travels north through an industrial area with three lanes—two that run northbound and one southbound.[5] The highway passes between Blaine High School and the former municipal airport with signalized intersections at Boblett and H streets. From here, SR 543 widens to five lanes and passes under an interchange with D Street with interior ramps providing access to a residential area and non-border areas.[6]

As it approaches Canadian customs at the 24-hour Pacific Highway Border Crossing, the highway splits into several paths. Northbound traffic from the D Street interchange is directed into a NEXUS lane for passenger vehicles, while two lanes are used for general traffic and access to duty free stores. A set of lanes curve east and are used for buses and trucks that qualify for pre-clearance under the Free and Secure Trade program.[7] Southbound traffic entering the United States is split into a general queue and a truck route with holding lanes. Border crossing times can become significantly delayed such as in the event of certain Seattle Mariners baseball games and summer holiday travel.[8] During the reconstruction of the Peace Arch border crossing, delays at the Pacific Highway crossing were similar to times seen right after the attacks of September 11.[9]

On the Canadian side of the border, the highway continues north as British Columbia Highway 15, which lies within the municipality of Surrey, British Columbia. It passes the residential neighborhood of Douglas and intersects 8 Avenue, which provides access to Highway 99 to the west. Highway 15 travels north as a divided highway through rural forestland and farmland in the Kensington Prairie, where it crosses the Nicomekl River. The highway enters the Cloverdale neighborhood and curves to the west as it crosses the Southern Railway of British Columbia and intersects Highway 10, an east–west route with connections to Newton and the city of Langley. Highway 15 travels around a commercial district and returns east to its original alignment on 176th Street as it passes Cloverdale's casino and fairgrounds.

The highway leaves Cloverdale and intersects the Fraser Highway at a rural junction near a crossing of the Serpentine River. Highway 15 continues north to a junction with Golden Ears Way, which crosses the Fraser River to reach Pitt Meadows, and terminates at an interchange with Highway 1 (part of the Trans-Canada Highway). The interchange also marks the southern terminus of Highway 17, a divided highway that follows the southern bank of the Fraser River through industrial areas in Surrey and continues southwest towards Delta.[10]

History

British Columbia

The Pacific Highway was opened as a gravel road on July 12, 1913, and again on August 3, 1923, as a paved road.[11] The highway was rerouted in the mid-seventies around Cloverdale onto a bypass route which included a then new overhead. The overhead was named after a slain RCMP officer named Roger Pierlet and was opened on May 19, 1976.[12] In 1985 and 1986 the highway was widened to four lanes from the U.S. Border to 32 Ave.[13] From 2005 to 2008, the highway was widened to four lanes from 32 Avenue, through Cloverdale and to 92 Avenue. The project was a part of the Border Infrastructure Program, which sought to improve several highways around Metro Vancouver.[14] [15] [16]

For a time between 1942 and 1962, BC 15 was designated number 99A after the King George Highway (Hwy. 99 from 1942 to 1972, Hwy. 99A from 1973 to 2006) superseded it as the primary route to the Canada–US border.[17] In 2009, the city of Surrey renamed "King George Highway" to "King George Boulevard".[18]

On December 21, 2013, the 1 billion South Fraser Perimeter Road opened as part of Highway 17, linking the northern terminus of BC 15 to Delta in the west.[19]

Washington

Prior to the current Washington route numbering system, this route was designated as Primary State Highway 1 Truck Route.[20] It ran east–west along D Street from US 99 to the Pacific Highway border crossing.[21] A 1.3miles expressway to serve the border crossing and connect it with I-5 was planned in the late 1960s to relocate truck traffic from city streets.[22] Construction of the new expressway was deferred in 1967 due to a federal cap on funds for highway projects.[23]

The relocation of SR 543 was approved by the Blaine city government in 1970 following negotiations with the state to add traffic signals.[24] [25] The Great Northern Railway also proposed moving its tracks inland to the new truck route corridor, but those plans were shelved.[26] [27] The new truck route opened on January 20, 1972, at a cost of $640,000.[28]

The Washington State Department of Transportation began reconstruction of SR 543 in May 2006 to expand the highway to five lanes between H Street and the border crossing. The existing truck lane was closed in October 2006 and was rebuilt to separate freight traffic from other vehicles accessing the border crossing and adjacent duty free store.[29] [30] The truck lane reopened in December 2007 with access to a Free and Secure Trade lane for pre-approved commercial vehicles. The roadbed of SR 543 was lowered by 25feet to accommodate an overpass carrying D Street, which opened to traffic in November 2007. A full interchange at D Street opened on February 11, 2008, marking completion of the 50.8 million project.[31] [32]

External links

Notes and References

  1. Web site: Staff . Forty Years with the Washington Department of Highways . Washington State Department of Transportation . August 17, 2008 . dead . https://web.archive.org/web/20081030044027/http://www.wsdot.wa.gov/NR/rdonlyres/AFDDA538-123B-43F8-A166-B30BAA34C492/0/40yearsReport.pdf . October 30, 2008.
  2. Strategic Planning and Programming Division . State Highway Log: Planning Report . 2007 . . 1562 . August 17, 2008 . https://web.archive.org/web/20100616135023/http://www.wsdot.wa.gov/mapsdata/tdo/PDF_and_ZIP_Files/HwyLog2007.pdf . June 16, 2010.
  3. Landmark Kilometre Inventory . 221–223 . British Columbia Ministry of Transportation and Infrastructure . Cypher Consulting . July 2016 . February 15, 2017 . https://web.archive.org/web/20170311044605/http://www2.gov.bc.ca/assets/gov/driving-and-transportation/transportation-infrastructure/engineering-standards-and-guidelines/traffic-engineering-and-safety/highway-safety/lki/lki_bc_201607.pdf . March 11, 2017 . dead.
  4. Blake . Abbey . Omnibus Spending Bill Includes 2nd District Priorities . . November 20, 2004 . August 17, 2008 . https://web.archive.org/web/20080804045127/http://www.house.gov/larsen/news/press2003-2004/pr_041120.html . August 4, 2008.
  5. Web site: March 27, 2018 . Corridor Sketch Summary – I-5 & SR 543: I-5/SR 543 Jct (Blaine) to Canadian Border . Washington State Department of Transportation . November 30, 2022.
  6. SR 543 lane configuration . Washington State Department of Transportation . dead . https://web.archive.org/web/20100214105518/http://www.wsdot.wa.gov/NR/rdonlyres/E753101B-E7B9-442F-82F5-807636F64046/0/LaneDisplay.JPG . February 14, 2010 . September 2, 2009.
  7. Web site: Directory of CBSA Offices and Services: Pacific Highway . May 17, 2013 . . November 30, 2022.
  8. News: Expect delays when traveling across the border this weekend . August 13, 2009 . . September 6, 2009 . dead . https://web.archive.org/web/20090820080010/http://news1130.com/news/local/more.jsp?content=20090813_213418_6592 . August 20, 2009.
  9. News: Wait at Canadian border going from bad to brutal . Bolt . Kristen Millares . . September 6, 2009 . March 9, 2007.
  10. Web site: Highway Planning Section . Official Numbered Routes in British Columbia . May 28, 2008 . British Columbia Ministry of Transportation . September 3, 2009 . July 9, 2014 . https://web.archive.org/web/20140709115652/http://www.th.gov.bc.ca/publications/planning/numbered_routes.htm#15 . dead .
  11. News: Grandview Heights Heritage Study . May 2005 . Donald Luxton & Associates . . January 2, 2018.
  12. News: . Bridge Opening Honours Mountie . The Province . Vancouver . 20 May 1976 . 13 .
  13. Ministry of Transportation and Highways . B.C. Ministry of Transportation and Highways Report 1985/86 . Province of British Columbia . Victoria . 122 . Report.
  14. February 19, 2007 . Highway 15 to be widened from Surrey to U.S. border . Ministry of Transportation . May 6, 2019.
  15. Web site: British Columbia Ministry of Transportation and Infrastructure . Highway 15 - Scope . https://web.archive.org/web/20061228214512/http://www.bip.gov.bc.ca/hwy15/b-scope.htm . December 28, 2006 . Border Infrastructure Program . Government of British Columbia . September 29, 2022.
  16. Web site: British Columbia Ministry of Transportation and Infrastructure . Highway 15 Timeline . https://web.archive.org/web/20061228224210/http://www.bip.gov.bc.ca/hwy15/Highway_15_timeline_rev.pdf . December 28, 2006 . Border Infrastructure Program . Government of British Columbia . September 29, 2022.
  17. News: August 11, 1962 . Federal dike action awaited . 3 . The Province . Newspapers.com . December 2, 2022.
  18. Web site: Lalonde . Vincent . November 12, 2009 . Corporate Report No: R207 – Street Name Changes . City of Surrey Council . February 2, 2020.
  19. News: South Fraser Perimeter Road, B.C.'s newest highway, opens . December 21, 2013 . British Columbia Ministry of Transportation and Infrastructure . January 16, 2013 . https://web.archive.org/web/20131223100445/http://www.newsroom.gov.bc.ca/2013/12/south-fraser-perimeter-road-bcs-newest-highway-opens.html . December 23, 2013 . dead.
  20. Web site: Identification of State Highways . Prahl . C. G. . December 2, 1965 . Washington State Highway Commission . September 10, 2008 . October 30, 2008 . https://web.archive.org/web/20081030044024/http://www.wsdot.wa.gov/NR/rdonlyres/6836215D-E301-43F3-895A-472BD2FDE86A/0/Identification.pdf . dead .
  21. News: June 16, 1964 . Blaine Men Are Chosen to Join Planners Group . 7 . The Bellingham Herald . . November 30, 2022.
  22. News: February 1972 . The People of Interstate 5 . 20 . Washington Highway News . Washington State Department of Highways . 23 . 1 . 29654162 . WSDOT Library Digital Collections . September 12, 2018.
  23. News: January 13, 1967 . Local Highway Projects Delayed by Restrictions . A1 . The Bellingham Herald . Newspapers.com . February 18, 2023.
  24. News: August 18, 1970 . Blaine Accepts Truck Route . 10 . The Bellingham Herald . Newspapers.com . November 30, 2022.
  25. News: January 18, 1972 . Blaine wants truck route lights first . 1 . The Bellingham Herald . Newspapers.com . November 30, 2022.
  26. News: April 23, 1969 . G.N. Track Move May Help White Rock, But Blaine Sees Problems . 5 . The Bellingham Herald . Newspapers.com . November 30, 2022.
  27. News: November 24, 1969 . G.N. Says No Decision Yet on Tracks at Blaine . 4 . The Bellingham Herald . Newspapers.com . November 30, 2022.
  28. News: January 20, 1972 . Blaine Truck Route opens . 1 . The Bellingham Herald . Newspapers.com . November 30, 2022.
  29. News: September 22, 2006 . Truck crossing to close for widening . . November 30, 2022.
  30. News: Fraley . Zoe . September 24, 2006 . Pacific Highway truck lane to close . C1 . The Bellingham Herald . Newspapers.com . November 30, 2022.
  31. Web site: July 2008 . SR 543 – I-5 to Canadian Border – Additional Lanes for Freight . Washington State Department of Transportation . dead . https://web.archive.org/web/20080724123834/http://www.wsdot.wa.gov/Projects/SR543/I5_Canadian/ . July 24, 2008 . August 17, 2008.
  32. February 8, 2008 . New SR 543 interchange ramps open Monday in Blaine . Washington State Department of Transportation . dead . https://web.archive.org/web/20091005022457/http://wsdot.wa.gov/News/2008/02/08_sr543rampsopenmonday.htm . October 5, 2009 . November 30, 2022.