Warden station explained

Warden
Symbol Location:toronto
Symbol:2big
Style:Toronto Transit Commission
Address:701 Warden Avenue,
Toronto, Ontario
Country:Canada
Coordinates:43.7114°N -79.2797°W
Structure:Elevated
Platform:Centre platform
Tracks:2
Parking:1,071 spaces
Accessible:No
Mapframe:yes
Mapframe-Custom:
Shape:none
Line:none
Marker:rail-metro
Marker-Color:
  1. 16A753
Zoom:15

Warden is a station on Line 2 Bloor-Danforth of the Toronto subway in Toronto, Ontario, Canada. It is located at the southeast corner of St. Clair Avenue East and Warden Avenue. The station is located perpendicular to St. Clair Avenue East, and is the only Line 2 station with a north–south alignment until the Scarborough Subway Extension is set to open in the early 2030s.

The main pedestrian street entrance is on the east side of Warden, with another entrance from St. Clair East along a walkway on the west side of the elevated tracks. Vehicle entry to the passenger pick up and drop off entrance is on the south side of St. Clair east of Warden, exiting on to Warden south of St. Clair East.

The station is on four levels: the subway platform is on the upper floor, the bus concourse to the connecting routes is below it, the two collector entrances and the concourse are found above street level, and the two entrances and the bus platforms are on the lower floor.

1,071 parking spaces are located at this station for commuter use, with 920 in the North Lot and 151 in the South Lot.[1]

History

Warden station was opened in 1968 in what was then the Borough of Scarborough, and served as the eastern terminus for Line 2 Bloor–Danforth for 12 years until the extension to was completed in 1980.

Until 1973, TTC buses and subway trains serving the station were in separate fare zones and so the turnstiles and collector booths were placed between the bus bays and the subway platforms. When the zones were abolished, the layout was reconfigured to bring the buses inside the station's fare-paid area; one collector booth, left isolated inside the fare-paid zone, became an information booth.

The station's previous address was 3276 St. Clair Avenue East. Since around 2013-14, it has been changed to its present address, 701 Warden Avenue.

Future redevelopment

Work started in 2022 to rebuild the bus terminal and to make the station accessible.[2] [3] The station is one of the last subway stations yet to be made accessible, due to the complexity of the station layout and its multiple levels.[4] Both commuter parking lots are proposed to be redeveloped by the city government.[5] In October 2021, the city announced that agreement had been reached with Tridel to build 600 residential units and a child care centre on the north parking lot.[6] Construction is expected to be completed by the end of 2025.[7]

Subway infrastructure in the vicinity

After exiting the station eastbound towards Kennedy station, the track returns to a tunnel at the Chestnut Portal, where it continues on its diagonal alignment under the former Canadian National Railway (CNR) spur line.

There is a crossover west of the station from when it was Line 2's eastern terminus which is still used occasionally to short turn trains. There is also a small siding and storage shed west of the crossover on the south side of the above-ground tracks, which continue along the track bed of the former CNR line all the way to Victoria Park station.

Nearby landmarks

Nearby landmarks include the Providence Healthcare, Warden Woods Park, Warden Hilltop Community Centre and Pine Hills Cemetery. It is near much vacant industrial land (including the former site of Centennial College and Warden Woods Mall/Power Centre) where major redevelopment is expected over the coming years, including numerous new housing developments on the former Power Centre property.[8] It is also near the Toronto District School Board high school W.A. Porter C.I., which brings about 700 students in the station each year.

Surface connections

See main article: List of Toronto Transit Commission bus routes.

When the subway is closed, passengers may board or disembark from buses at the intersection of Warden Avenue and St. Clair Avenue. None of these routes are accessible to those with disabilities as the only connection between the subway and the bus terminal is via stairs.

TTC routes serving the station include:

Bay numberRouteNameAdditional information
117ABirchmountNorthbound to Highway 7
17BNorthbound to Steeles Avenue East via Wintermute Blvd
17CNorthbound to Steeles Avenue East
29BellamyNorthbound to Scarborough Centre station
3102AMarkham RoadNorthbound to Progress Avenue/Centennial College
102BNorthbound to Steeles Avenue East
102CNorthbound to Steeles Avenue East via Dynamic Drive
102DNorthbound to Major Mackenzie Drive
4902Markham Road ExpressNorthbound to Steeles Avenue East via Centennial College
516McCowanNorthbound to Scarborough Centre station
68Broadview Southbound to Broadview station via O'Connor Drive
69BWarden SouthSouthbound to Kingston Road via Birchmount Road
769AWarden SouthSouthbound to Kingston Road via Warden Avenue
135GerrardWestbound to Main Street station
868AWardenNorthbound to Steeles Avenue East
68BNorthbound to Major Mackenzie Drive
968Warden ExpressNorthbound to Steeles Avenue East
9Line 2Shuttle bus

Notes and References

  1. Web site: Warden Station . April 16, 2022 . www.ttc.ca . April 16, 2022 . https://web.archive.org/web/20220416194007/https://www.ttc.ca/en/subway-stations/warden-station . live .
  2. News: Adler . Mike . February 3, 2022 . Scarborough's Warden Station gets a long-awaited remake, starting with elevators in 2022 . The Toronto Star . April 19, 2022 . 0319-0781 . April 19, 2022 . https://web.archive.org/web/20220419082440/https://www.thestar.com/local-toronto-scarborough/news/2022/02/03/scarborough-s-warden-station-gets-a-long-awaited-remake-starting-with-elevators-in-2022.html . live .
  3. Web site: TTC to begin Easier Access construction at Museum Station; lane restrictions on Queen's Park . . August 11, 2022 . https://web.archive.org/web/20220812210132/https://www.ttc.ca/news/2022/August/TTC-to-begin-Easier-Access-construction-at-Museum-Station---lane-restrictions-on-Queens-Park . August 12, 2022 . live .
  4. Web site: Major Redevelopment of Warden Subway Station Planned UrbanToronto . April 19, 2022 . urbantoronto.ca . April 19, 2022 . https://web.archive.org/web/20220419080937/https://urbantoronto.ca/news/2022/01/major-redevelopment-warden-subway-station-planned . live .
  5. Web site: December 18, 2013 . December 18 2013 Board Commuter Parking Lot Strategy . April 18, 2022 . www.ttc.ca . April 18, 2022 . https://web.archive.org/web/20220418210617/https://www.ttc.ca//en/public-meetings/board/2013/board-meetings-dec-19 . live .
  6. Web site: October 19, 2021 . City of Toronto and CreateTO announce development partners for two Phase One Housing Now sites to build much needed affordable and market rental housing . April 19, 2022 . City of Toronto . April 19, 2022 . https://web.archive.org/web/20220419080938/https://www.toronto.ca/news/city-of-toronto-and-createto-announce-development-partners-for-two-phase-one-housing-now-sites-to-build-much-needed-affordable-and-market-rental-housing/ . live .
  7. Web site: Easier Access Program Schedule .
  8. Web site: Planning & Development . July 14, 2017 . December 31, 2004 . December 6, 2004 . https://web.archive.org/web/20041206172700/http://www.city.toronto.on.ca/planning/warden-vicpark.htm . live .