Waltz Road–Huron River Bridge Explained

Waltz Road–Huron River Bridge
Location:Waltz Rd. over Huron R., Huron Township, Michigan
Coordinates:42.1611°N -83.4028°W
Built:1924
Architect:Wayne County Road Commission
Builder:Mount Vernon Bridge Company; Swingle & Robinson
Architecture:Camelback pony truss
Added:February 10, 2000
Area:less than one acre
Refnum:00000081

The Waltz Road–Huron River Bridge is an automobile bridge located on Waltz Road spanning the Huron River in Huron Township, Michigan. It was listed on the National Register of Historic Places in 2000.

History

The Waltz Road–Huron River Bridge was constructed in 1924 by the Wayne County Road Commission at a cost of $65,000.[1] The bridge replaced a previous footbridge that had been erected over the Huron River to allow local children to attend school.[2] The substructure was built by Swingle & Robinson, contractors from Wyandotte, Michigan, and the superstructure by the Mt. Vernon Bridge Company from Mt. Vernon, Ohio.[1]

On June 1, 2017, the Roads Division at the Wayne County Department of Public Services closed the bridge for repairs. It reopened on June 3, 2019.[3] On August 23, 2017, the Department of Public Services released the news that the 93-year-old bridge would be replaced rather than repaired.[4] Wayne County awarded the bridge reconstruction contract to Toebe Construction, LLC of Wixom. [5]

Description

The entire bridge is 207feet long, with a span length of 100feet and a width of 27feet.[1] The span consists of two identical seven-panel, camelback Pratt pony trusses. Sidewalks are attached to the outside of each truss; the railings were originally concrete balustrades with urn-shaped spindles, but these have been replaced with angles with bar spindles. Solid concrete parapets line the approaches at each end of the bridge.[1]

External links

Notes and References

  1. Web site: Staff . Waltz Road Bridge over the Huron River . . Historic Sites Online. March 13, 2010.
  2. Web site: Waltz Road Bridge over the Huron River . Ren . Farley . Detroit1701.org . July 9, 2010.
  3. https://huronhub.com/2017/05/31/waltz-bridge-set-to-close-june-1-for-repair-work/
  4. http://www.hurontownship-mi.gov/Portals/77/docs/2017/8.23.17_Waltz%20Road%20Bridge%20-%20Replacement.pdf
  5. https://huronhub.com/2018/08/23/waltz-road-bridge-construction-contract-awarded-to-toebe-construction-llc-of-wixom/