Waki Hydroelectric Power Station Explained

Waki Power Station
Coordinates:1.7664°N 31.3664°W
Country:Uganda
Location:Butiaba, Masindi District
Status:P
Commissioned:2017 (Expected)
Owner:Hydromax
Ps Electrical Capacity:5 MW

Waki Power Station is a proposed mini hydroelectric power station in Uganda, the third-largest economy in the East African Community.

Location

The power station will be located across the Waki River, in Butiaba, Masindi District, in Western Uganda. This location lies near the eastern shores of Lake Albert, near the point where River Waki empties into the lake. Butiaba lies approximately 60km (40miles), by road, west of Masindi, the location of the district headquarters, and the nearest large town.[1]

Overview

The Waki Hydropower Project, will be a run of the river, mini-hydropower installation, with installed capacity of 5 MW. The energy generated will be fed into the national electric grid via either an 11 kV or a 22 kV transmission line. Feasibility studies were initiated in 1997.[2] More recently, in 2006, SN Power Invest of Norway, carried out new feasibility studies on Waki and Buseruka power projects.[3] [4] However, SN Power Invest abandoned the project and in 2008, the development license was re-allocated to Tronder Power Limited, also from Norway.[5] However, Tronder Power Limited also pulled out of the deal and in 2010, the license for Waki Power Station was allocated to Hydromax. The power station will be owned and operated by Hydromax, a private energy investor, who developed Buseruka Power Station in Hoima District, between 2005 and 2013.

Construction timetable

Construction was initially expected to begin in 2012, with commissioning anticipated in 2014.[6] In October 2014, the Electricity Regulatory Authority (ERA), awarded the electricity production license to the developers of the power station. Construction is expected to begin in December 2014, with completion planned in 24 months.[7]

See also

External links

Notes and References

  1. Web site: Map Showing Masindi And Butiaba With Distance Marker. 11 July 2014. Globefeed.com.
  2. Web site: Feasibility Study For The Development of A Mini-Hydro Power Plant Along The Eastern Shore of Lake Albert. Nathaniel. Richardson. 11 July 2014. 31 May 1997. USAID.
  3. Web site: Loadshedding Will End Soon. New Vision. 5 February 2006. 11 July 2014. Newvision. Archive.
  4. Web site: Electricity Prices Set To Rise. New Vision. 25 April 2006 . 11 July 2014 . and Mariam Nalunkuuma . Apollo Mubiru.
  5. Web site: More Power Licenses Given Out. New Vision. 15 May 2008. 11 June 2014 . Ibrahim . Kasita.
  6. Web site: 11 July 2014. Uganda's Energy Relief Still A Long Way . 6 April 2010 . Oluka. Benon Herbert. Daily Monitor.
  7. Web site: 22 October 2014. 23 October 2014 . Samuel . Sanya. ERA Licenses 9 Renewable Energy Projects. New Vision (Kampala).