Waitematā railway station explained

Waitematā (Britomart)
Native Name:Waitematā
Native Name Lang:Māori / te reo
Type:Auckland Transport Urban rail
Address:Auckland CBD
Coordinates:-36.8446°N 174.7694°W
Owned:Auckland Transport
Line:Eastern Line
Southern Line
Western Line
Platform:4
Tracks:2
Structure:Underground
Levels:1
Parking:No
Bicycle:Yes
Accessible:Yes (Lifts)
Code:BMT / AKL
Zone:City
Electrified:25 kV AC (2014)
Former:Britomart Transport Centre
Passengers:10,224,759[1]
Pass Year:CY 2018

Waitematā railway station, formerly known as Britomart Transport Centre, is the public transport hub in the central business district of Auckland and the northern terminus of the North Island Main Trunk railway line. It combines a railway station in a former Edwardian post office, extended with expansive modernist architectural elements, with a bus interchange. It is at the foot of Queen Street, the main commercial thoroughfare of the CBD, with the main ferry terminal just across Quay Street.

The station was the result of many design iterations, some of them being substantially larger and including an underground bus terminal and a large underground car park. Political concerns and cost implications meant that those concepts did not proceed. At the time of its inception in the early 2000s the station was still Auckland's largest transport project ever, built to move rail access closer to the city's CBD and help boost Auckland's low usage of public transport. It is one of the few underground railway stations in the world designed for use by diesel trains,[2] although their use is now prohibited. Diesel trains from Hamilton and Wellington terminate at The Strand station.

A tunnel to the Western Line is under construction as part of the City Rail Link project. In March 2023, following a joint submission to the New Zealand Geographic Board by Auckland Transport and Auckland Council, the station was officially re-named to Waitematā railway station.

History

Earlier uses

The station is on reclaimed land in the middle of what was once Commercial Bay. Its original name came from Point Britomart, a former headland at Commercial Bay's eastern end. In the 1870s and 1880s the headland was levelled and used to fill in Commercial Bay in order to extend the railway line to the bottom of Queen Street.

Auckland Railway Station moved west from its original 1873 site to Britomart in 1885 and remained there after the Post Office was built on the Queen Street frontage in 1912. The Chief Post Office was designed by architect John Campbell in an Edwardian baroque style, using Oamaru stone on a base of Coromandel granite.[3] In 1930 the station was relocated 1.2 km east to Beach Road and the former station site became a bus terminal in 1937 and a car park in 1958.[4]

Many proposals were made to locate the station back in the CBD, most notably in 1973 and 1987, with the 1970s proposal of the Mayor of Auckland, Dove-Myer Robinson, envisaging an underground station at Britomart and a tunnel loop, but that was stopped by the Muldoon National Government, which claimed it was unjustified and too costly.[5] In 1995, Auckland City Council purchased the old Post Office building (PostBank offices closed in 1988,[5] though some postal services remained open beyond that year) and proposed to redevelop the area as a transit centre.

Early designs called for both the bus terminal and the railway to be underground, but these plans were scrapped as consultation showed that buses were preferred above ground by both users and operators, and projected costs soared, partly due to the difficulties with potential water ingress. The developer eventually defaulted on contractual deadlines, and the project failed.[6] [7] [8]

In 1998, a cheaper option was decided on, partly after a consultation process with stakeholders and citizens. The architectural design was chosen via a competition. It used part of Queen Elizabeth II Square and surrounding streets as a bus interchange, with the existing dilapidated bus terminal redeveloped to incorporate both bus services and a pedestrianised area, also known as a Transit Oriented Development (TOD). When nearby Quay Street was realigned in the late 1990s, a tunnel was built (completed in 2000) to provide the underground railway link. Bus services using the old bus terminal were diverted to other locations in June 2001.[6] [7] [8]

The project name, with the station intended to facilitate transfers between buses, trains, ferries and potential future light rail, was officially coined the Waitemata Waterfront Interchange.[9] [10] [11] [12] [13] The station itself later opened as Britomart Transport Centre.

Construction

Designed by California architect Mario Madayag in collaboration with local Auckland architects Jasmax,[6] [14] [15] construction of Britomart commenced in October 2001, with structural design having been provided by OPUS.[16] It involved 14 km of piling, some being 40 m long and driven 16 m into the underlying bedrock, mainly to provide good earthquake protection, and to futureproof the area for potential later construction of buildings on top of the station. 200,000 cubic metres were excavated for the station, and 40,000 cubic metres of concrete poured.[17] Approximately of new rail track was built, of which half was in a cut and cover tunnel.[18] The station has a site area of 5.2 ha and includes 236 m² retail area.[6]

The station opened to passengers on 7 July 2003, with the official opening on 25 July 2003 by Sir Edmund Hillary and government ministers.[19] Services to the Beach Road terminus ceased, except for some peak-time commuter services and excursion trains using the former Platform 4 (originally Platform 7), renamed 'The Strand'. The commuter services ceased after a few months.

Cost over-runs and differing tastes made the centre politically controversial, the design often being described as a large hole in the ground, both literally and figuratively. Despite this and a NZ$204 million price tag,[14] it has won numerous design awards and is internationally recognised for its innovative but heritage-sympathetic architecture.[20] The main source of contention was the relatively great expense of this public transport development in the Auckland Region, where for many decades the focus had been on private vehicle ownership and travel.[21]

Pedestrian underpasses

Initial plans included underground pedestrian walkways to Queen Elizabeth II Square, the nearby downtown ferry terminal and the main shopping street of Queen St. Due to cost over-runs only the short walkway under Queen Street to the square was built, the other two being dropped in favour of a sizeable rain-proof canopy that ran from the square's above-ground exit northward toward the ferry terminal and southward toward the Queen Street-Customs Street intersection.

The underground walkway was closed to pedestrians from 29 March 2016 in order to facilitate preliminary works for the City Rail Link.[22] In April and May 2016, the canopy was dismantled and removed from the site, and on 28 May 2016 the Downtown Shopping Centre was closed and fenced off for demolition.[23]

Further works

A major commercial building was built over the eastern approach tunnel in the late 2000s, at the eastern edge of the plaza behind the station.[24]

City Rail Link works

On 17 January 2017, the Britomart station building was closed and access between it and platforms was blocked off. A new, temporary Britomart station building was opened at the rear of the building, with new stairways and the retention of elevator and escalator access to the platforms. This building was in use for three years. The former building is refurbished and strengthened in preparation for tunnelling under it for City Rail Link services.[25] [26]

To enable the digging of the trench works required for the CRL, the Downtown Shopping Centre was closed on 28 May 2016 and by 23 November had been demolished. It has been replaced with 'Commercial Bay' named after Commercial Bay which was below the modern day site. Commercial Bay consists of the Commercial Bay (PwC tower) skyscraper and the Commercial Bay Shopping Centre. Auckland Council and proprietors Precinct Properties struck a deal to include tunnels for the City Rail Link directly underneath the premises.[27] [28]

In late 2020, the former Queen Elizabeth II Square adjacent to the Old Post Office building was reopened as Te Komititanga, a new civic square that incorporates Maori: whāriki (woven mat) patterns, developed in partnership with Ngāi Tai ki Tāmaki weaver Tessa Harris, who developed the patterns in collaboration with weavers from Te Ākitai Waiohua, Ngāi Tai ki Tamaki, Ngāti Te Ata and Ngāti Whātua Ōrākei.[29] [3]

On 6 April 2021 at 1pm the surface building (also known as the Central Post Office) was reopened. The opening was attended by Phil Goff and members of the public. The surface building was ceremonially opened by a ribbon cutting.[30]

In June 2022, the number of serviceable platforms was reduced to enable the two outermost platforms (1 and 5) to be connected to the tunnels for the CRL and become through platforms. As a result of this, Onehunga line services were shortened to terminate at Newmarket instead of Britomart. Auckland Transport claimed that removing Onehunga line services from Britomart would be the least disruptive option. The Public Transport Users Association criticised the move and alleged that 60% of Onehunga line passengers wanted to travel to Britomart. Former Auckland councillor Mike Lee also criticised the change and claimed that rail staff had told him that the change was unnecessary as only one platform would be closed at a time, which still left four platforms for four lines to be operated out of Britomart. Lee explained that one platform was being used to accommodate a spare AM class EMU (the "hot spare") for service disruptions, he believed that this spare unit could be held further up the line at The Strand Station which would free up a platform for Onehunga line services to continue to operate out of Britomart.[31] [32] [33]

In the future, the number of platforms will be permanently reduced from 5 to 4, with Platform 2 permanently closing.[34] Once the CRL is operational, additional works and upgrades to Waitematā station will widen the remaining 4 platforms to accommodate larger passenger volumes in conjunction with improving station access from the eastern entrance.[35]

Capacity and rail connections

The station is designed to serve up to 10,500 passengers during the peak hour as a terminus.[14]

The station has five platforms and is constrained by the 9.3 m width of the 426 m long double-track access tunnel. Early forecasts predicted that while double-tracking of the surrounding rail network would improve peak time train congestion, the capacity of the corridor would not be reached until about 2020. Growth in train patronage and increased services resulted in the tunnel being at maximum capacity from 2011, almost 10 years earlier than predicted.[36] Because of the capacity restrictions, a proposed Hamilton-Auckland commuter train service would have gone to The Strand Station some 1.5 km to the east.[37]

Increased services

In its early days, Britomart was criticised because it was built on a scale and level of grandeur that was well in excess of the capacity and patronage of the rail network. Auckland Regional Council transport committee chairwoman Catherine Harland acknowledged that "Britomart opened ahead of its time", raising public expectations that could not be fulfilled at the time due to the state of the rail network.[38]

Patronage on Auckland's rail network increased from 2.5 million journeys in 2003 to just over 14.2 million in July 2015,[39] and by April 2017 had reached 19 million journeys.[40]

Electrification

It was announced on 17 May 2007 that electrification of Auckland's rail network would proceed. Installation of overhead wires began later, with Auckland Transport (initially ARTA) purchasing new electric units to replace the diesel trains. The project was expected to be completed in 2013.[41]

Britomart was officially electrified on 31 March 2014, with New Zealand's Prime Minister, John Key, flipping the switch in a commemorative ceremony.[42] The first electric passenger services began running four weeks later, between Britomart and Onehunga on the Onehunga Line on 28 April 2014.[43]

From July 2015, all suburban trains serving Britomart were operated by AM Class EMUs, leaving the thrice-weekly Northern Explorer as the only diesel service using the station. By December 2015, the station required a $600,000 upgrade to its diesel extraction fans and Auckland Transport requested that KiwiRail, the operator of the Northern Explorer, fund the upgrade if they wished to continue serving the station. KiwiRail decided that the cost was not justifiable and from 21 December 2015 they ceased serving Britomart and relocated their Auckland terminus to The Strand Station, in the east of the CBD.[44]

City Rail Link

See main article: City Rail Link. Plans for a tunnel southward underneath the CBD to Mt Eden and even to Morningside were debated for nearly a century.[45] [46] With Britomart in operation since 2003, the tunnel would allow trains to run through the station rather than having to reverse out over the same set of tracks.

On 5 March 2008, ARTA said that it had begun preliminary planning for a 3.5 km tunnel which would most likely be travelling under Albert Street and serving three underground stations: one near Wellesley Street (linking to Aotea Square), one in the Karangahape Road / Pitt Street area, and one near Upper Symonds Street in Newton. At the southern end, the line would link to a redeveloped station at Mt Eden.[47] [48]

Original estimates for the cost of the CRL were at around $1 billion, taking 5–7 years to plan and build.[49] [50] In August 2014 it was announced that the station at Newton had been dropped in favour of an upgraded station at Mt Eden.[51] In 2015, enabling works for CRL construction began. Main works began in 2018.

Following completion of the CRL, some trains will no longer terminate at Britomart.[52] Platforms 5 and 1 will be the through platforms,[53] while platforms 2–4 will remain terminating platforms.

Eastern tunnel capacity

A proposed alternative to the City Rail Link (CRL) to increase capacity was the duplication of the existing eastern Britomart approach tunnel. This would have required a new twin track tunnel approximately 500 metres long to be constructed parallel to the existing twin-track tunnel, resulting in four tracks from Quay Park Junction and retaining Britomart as a terminus. Estimated costs were $150 million to $200 million, with 4–5 years to plan and build.[54] Such a project would have allowed the same capacity increase as the CRL at approximately one sixth to one fifth the cost, but without any of the additional benefits that the two new CRL underground stations or the more direct route to the Western Line will provide.

Initially seen as an inferior, but cheaper and more politically acceptable alternative to the CRL tunnel, the duplicate eastern approach also gained favour as a stop gap implementation due to the comparatively short build time. Even if planning had commenced immediately, the CRL might not have become operational until several years after the maximum capacity of the existing corridor was reached.[54] Moreover, while seen as an alternative to the CRL through connection tunnel, the duplicate eastern tunnel would not have precluded it from being built.

A feature that came into operation in 2011 in time for the 2011 Rugby World Cup and allowed an increase in capacity of the existing tunnel is 'bi-directional signalling', which allows a train to leave on the same track on which it entered – freeing it from having to cross over other tracks which may not be safely clear of other trains.[55] In 2019, funding was agreed to restore a five-year commuter train trial between Papakura and Hamilton, with a one-seat journey to Britomart being the eventual aim.[56]

Services

Trains

Auckland One Rail operates the Auckland suburban rail network on behalf of Auckland Transport. This includes the electrified lines west to Swanson and south to Manukau and Papakura.

In July 2015, it was reported that the number of trains able to enter and leave Britomart was 20 per hour.[57] On a typical weekday inter-peak, nine trains leave Britomart per hour, comprising:

Buses and ferries

Britomart is a major interchange between trains, buses and ferries. It is the terminus for many bus routes, including the Northern Express NX1 route along the Northern Busway to and from Albany and the Hibiscus Coast. The frequent CityLink bus service passes nearby on Queen and Customs Streets and the InnerLink bus services stop at Britomart.[58]

Other buses depart from stops on surrounding streets, some of which are up to a block away from the station. Until early 2016, buses arrived at and departed from Queen Street in front of the station building, but that portion of Queen Street is now permanently closed to vehicular traffic and is now a public plaza after an initial temporary closure for CRL tunneling works.[59]

Across Quay Street from the station is the Auckland Ferry Terminal, which is the main hub for Auckland's ferry system. There are ferry services to suburbs including Devonport, Birkenhead and Half Moon Bay, as well as to islands in the Hauraki Gulf such as Waiheke Island and Rangitoto Island.

Heritage registration

The Chief Post Office was registered as a Category I heritage building by Heritage New Zealand on 11 July 1986, with registration number 101.

Awards

Awards that the station has received:[14]

See also

External links

Notes and References

  1. Web site: Boardings and Alightings All Stations for Calendar Year 2018. FYI.org.nz. Auckland Transport. Auckland Transport. 4 April 2019 . 3 May 2019.
  2. Web site: Smoke chaos at Britomart . Dearnaley, Mathew . 20 February 2007 . . 22 September 2011.
  3. 12-13.
  4. http://www.britomart.co.nz/history1.html Chapter 1 – The Historic Land 1600–1959
  5. http://www.britomart.co.nz/history2.html Chapter 2 – City Takes Control 1959–1995
  6. Urban Design Case Studies New Zealand Ministry for the Environment, March 2005,
  7. http://www.britomart.co.nz/history3.html Chapter 3 – Transforming the Waterfront 1995–1999
  8. http://www.britomart.co.nz/history4.html Chapter 4 – The Britomart Project 1999–2001
  9. News: Owen . Lisa . 2001-08-06 . PROPOSAL . One News . TVNZ .
  10. Web site: Dialogue: Grave doubts plague Son of Britomart . 2023-05-07 . NZ Herald . en-NZ.
  11. Web site: Dialogue: Reality check for Queen St temple . 2023-05-07 . NZ Herald . en-NZ.
  12. Web site: Urgency needed from Infrastructure Auckland on Auckland's transport issues . 2023-05-07 . The Beehive . en.
  13. Web site: Britomart revisited - Property News . 2023-05-07 . NZ Herald . en-NZ.
  14. http://jasmax.co.nz/frames/cutural-frame.htm Cultural & Civic Projects – Britomart Transport Centre
  15. Web site: Auckland City vision a transport of delights . Orsman, Bernard . 9 November 2000 . . 22 September 2011.
  16. Web site: Opus IPO set to ride out volatility . Bennett, Adam . 24 September 2007 . . 22 September 2011.
  17. First Britomart Tour – Wednesday 29 November 2006IPENZ, Auckland Branch, January 2007 Bulletin
  18. Web site: Auckland Rapid Transit System. Railway Technology. 27 August 2019.
  19. http://www.labour.org.nz/gallery.jsp?cid=ASTIMG18838 Ministers at the opening of Britomart
  20. References provided within this same article (Awards)
  21. http://www.transport.govt.nz/mode-of-transport/ Mode of Transport, Figure for New Zealand Regions
  22. Web site: QEII Square pedestrian underpass closure. 16 April 2016. 21 March 2016. Auckland Transport.
  23. Web site: End of an era for Auckland's downtown mall. 31 May 2016. 28 May 2016. .
  24. Web site: Two towers take shape at $1b Britomart centre . Gibson, Anne . 27 May 2009 . . 22 September 2011.
  25. Web site: Changes for Britomart Station users. 6 November 2017. 30 December 2016. Auckland Council.
  26. News: City Rail Link Ltd gives sneak peek into demolition inside Britomart. 6 November 2017. Newshub . 8 September 2017. Newshub – newshub.co.nz.
  27. News: Last week for shoppers at Auckland downtown mall . . Catherine Gaffaney . 22 May 2016.
  28. News: Watch $850m project: preparing for NZ's biggest commercial development. 23 November 2016. 23 November 2016. .
  29. Web site: Te Paparahi, Toi Māori . Olivia . Haddon . . 2021 . 1 December 2023.
  30. News: Auckland's Chief Post Office re-opens after four years and $4.4b City Rail Link job.
  31. Web site: 2022-06-23 . Auckland Transport cuts Onehunga train service off at the knees . 2022-06-26 . Newsroom . en-AU.
  32. Web site: 2022-06-19 . The Onehunga Line Change . 2022-06-26 . Greater Auckland . en-NZ.
  33. Web site: Niall . Todd . 2022-06-02 . Auckland Rail: Onehunga service to be shortened due to City Rail Link . 2022-06-26 . Stuff . en.
  34. Web site: What's happening at Waitematā Station (Britomart)? . 28 July 2022 . 8 December 2023.
  35. Web site: Tendering to start for rest of CRL . 19 January 2017 . 8 December 2023.
  36. Web site: Britomart nears capacity. Auckland Transport Blog. 15 May 2011. 17 August 2010. https://web.archive.org/web/20110723094220/http://transportblog.co.nz/2010/08/17/britomart-nears-capacity/. 23 July 2011. dead.
  37. News: Strand rail link 'best'. 15 May 2011. Waikato Times. 11 May 2011.
  38. Web site: Happy birthday, Britomart . 7 July 2004 . . 22 September 2011.
  39. Web site: Auckland rail patronage hits a new high of 14 million. 4 February 2016. 4 August 2015. stuff.co.nz.
  40. An extra million on the trains in just three months . . 6 April 2017 . 12 June 2017 . https://web.archive.org/web/20170416234220/https://at.govt.nz/about-us/news-events/an-extra-million-on-the-trains-in-just-three-months/ . 16 April 2017 . dead .
  41. http://www.arta.co.nz/xxarta/news/media_releasexx.cfm?entryID=97F88B31-BCD4-1A24-9EAE-05C57234A683 21st century public transport for Auckland
  42. News: Auckland rail network enters new era . 31 March 2014 . The New Zealand Herald . 14 May 2014.
  43. Web site: Electric trains . Auckland Transport . 24 May 2014.
  44. Web site: Northern Explorer Timetable. 21 April 2017. KiwiRail Scenic Journeys.
  45. News: Abandonment Of Scheme. 15 March 1930. .
  46. News: Badly Let Down. 22 March 1930. Auckland Star.
  47. Web site: $1b loop tunnel plan to unlock Britomart. 5 March 2008. The New Zealand Herald. Mathew Dearnaley. 5 March 2008.
  48. http://www.arta.co.nz/shadomx/apps/fms/fmsdownload.cfm?file_uuid=A99C6001-BCD4-1A24-9CDE-FCF8BDB29DC8&siteName=arc Auckland’s rail network tomorrow: 2016 to 2030
  49. Following the moneye.nz magazine, IPENZ, January/February 2007
  50. Web site: $1b Auckland rail upgrade powers ahead . Dearnaley, Mathew . 21 May 2007 . . 22 September 2011.
  51. Web site: Underground station dropped from Auckland city rail link. 22 January 2016. 1 August 2014. TVNZ.
  52. Web site: What's happening at Waitematā Station (Britomart?) . 28 July 2022 . 8 December 2023 . CRL Limited.
  53. Web site: CRL takes next step, but are we making enough of it?. Greater Auckland. 3 July 2017. 8 December 2023.
  54. Britomart West Rail Extension Feasibility Study (URS Group, final report for Auckland City Rapid Transit Group, 2004)
  55. Web site: More about electrification. 14 January 2015. Kiwirail. https://web.archive.org/web/20120320174303/http://www.kiwirail.co.nz/projects/major-projects/auckland-rail-electrification/signalling-and-traction.html. 20 March 2012. dead.
  56. News: Hamilton commuter train may eventually reach Britomart. Newshub. 24 August 2019. 27 August 2019.
  57. Web site: Auckland rail patronage three years ahead of target. 3 April 2016. 24 July 2015. .
  58. Web site: Te Komititanga: Square opens in downtown Auckland with mana whenua narratives. 18 December 2020. Stuff.co.nz.
  59. Web site: Link bus service. 9 September 2017. Auckland Transport.
  60. http://archrecord.construction.com/features/bwarAwards/archives/04a_britomart.asp Britomart Transport Centre
  61. School of Architecture announces winners of the 2007 Kenneth F. Brown...UH News, University of Hawaii, Thursday 7 June 2007