Waaban Crossing | |
Coordinates: | 44.2588°N -76.4718°W |
Crosses: | Cataraqui River |
Locale: | Kingston, Ontario, Canada |
Starts: | John Counter Boulevard |
Ends: | Gore Road |
Other Name: | Third Crossing |
Owner: | City of Kingston |
Lanes: | 2 |
Architect: | Hatch |
Builder: | Kiewit Construction |
Cost: | $180 million |
Mapframe-Zoom: | 12 |
The Waaban Crossing (known as the Third Crossing bridge during development) is a 1.2km (00.7miles) crossing of the Cataraqui River in Kingston, Ontario, linking John Counter Boulevard on the western side of the river with Gore Road on the eastern side. Built at a cost of $180 million, the bridge was funded by equal contributions from the city, provincial, and federal governments.[1] The bridge opened to the public on December 13, 2022.[2]