Visakhapatnam–Tirupati Double Decker Express Explained

Color:FF5C5C
Visakhapatnam – Tirupati AC Double Decker Express
Type:Double Decker Express
Locale:Andhra Pradesh
Operator:South Coast Railways
Start: (TPTY)
Stops:16
End: (VSKP)
Distance:761km (473miles)
Journeytime:13 hrs 10 min
Frequency:Tri-weekly
Seating:Yes
Sleeping:No
Catering:On-board Catering
Observation:Large windows
Stock:LHB Double Decker
Trainnumber:22707 / 22708
Speed:58km/h average with halts

The 22707 / 22708 Visakhapatnam – Tirupati AC Double Decker Express is a superfast train belonging to South Coast Railways of Indian Railways connecting Visakhapatnam and Tirupati both in the Indian state of Andhra Pradesh.[1] [2]

Previously this train was introduced between Kacheguda (Hyderabad)– section as Guntur–Kacheguda AC Double Decker Express & Kacheguda (Hyderabad)– section as Kacheguda–Tirupati Double Decker Express,[3] but both trains were not successful on those routes due to low commuter traveling. So this train was canceled on those routes[4] and transferred on a busy and profitable route i.e. Visakhapatnam - Tirupati section.

Stoppages

This train stops at Duvvada, Anakapalle, Tuni, Samalkot Jn, Rajahmundry, Tadepalligudem, Eluru, Vijayawada Junction, New Guntur, Tenali Jn, Chirala, Ongole, Nellore, Gudur Jn, Sri Kalahasti & Renigunta Jn.

Coach composition

The train has 9 AC Chair cars, 2 power cars (Total 11 coaches)

123456789101112
22707EOGC8C7C6C5C4C3C2C1CE1EOG
22708EOGCE1C1C2C3C4C5C6C7C8EOG

Schedule

The schedule of this 22707/22708 Visakhapatnam - Tirupati AC Double Decker Express is given below:-

VSKP - TPTY - VSKP AC Double Decker Express+22707Stations22708
DaysArrivalDepartureArrivalDepartureDays
1-NIL-23:00Visakhapatnam Junction10:30-NIL-2
23:2323:25Duvvada09:4309:45
23:3423:35Anakapalle08:5809:00
200:2400:25Tuni08:0308:05
01:0801:10Samalkot Junction07:1307:15
02:0302:05Rajahmundry06:3306:35
02:4802:50Tadepalligudem05:5305:55
03:1803:20Eluru05:1805:20
04:5005:00Vijayawada Junction04:1504:25
05:3805:40New Guntur03:2303:25
06:2406:25Tenali Junction02:4802:50
07:1407:15Chirala01:5802:00
07:4907:50Ongole01:2301:25
09:0909:10Nellore23:5323:551
09:5810:00Gudur Junction23:2323:25
10:5911:00Sri Kalahasti22:3522:37
11:2811:30Renigunta Junction22:1322:15
12:20-NIL-Tirupati-NIL-21:55

Traction

It is hauled by a based WAP 7 locomotive on its entire journey.

External links

Notes and References

  1. https://www.thehindu.com/todays-paper/Suresh-Prabhu-High-speed-trains-to-connect-Vijayawada-Vizag-soon/article16966976.ece, thehindu.com
  2. https://scr.indianrailways.gov.in/view_detail.jsp?lang=0&id=0,5,268&dcd=8250&did=1483091680482AA196EF2C985B5F88F45390944165939.web107 South Central Railways
  3. https://scr.indianrailways.gov.in/view_detail.jsp?lang=0&dcd=3989&id=0,5,268 South Central Railway
  4. https://www.thehindu.com/news/national/andhra-pradesh/SCR-cancels-Kacheguda-Guntur-double-decker/article16440043.ece thehindu.com