Vilnius Biofuel Power Plant Explained

Vilnius Biofuel Power Plant
Name Official:Vilniaus kogeneracinė jėgainė
Country:Lithuania
Location:Vilnius
Coordinates:54.6678°N 25.1567°W
Status:Operational
Construction Began:2016
Commissioned:2021
Cost:340 million [1]
Owner:Ignitis grupė
Th Fuel Primary:Waste
Th Fuel Secondary:biofuel
Ps Electrical Capacity:88 MW (electricity)
227 MW (heat)

Vilnius Biofuel Power Plant is a waste-to-energy plant in Vilnius, Lithuania.[2] [3] The plant produces 40% of all annual heating requirements for the city of Vilnius.

It was built next to decommissioned Vilnius Combined Heat and Power Plant and utilises some of the infrastructure.

External links

Notes and References

  1. https://www.delfi.lt/tvarilietuva/aplinka/milijonus-lietuvai-kainavusios-jegaines-gali-tapti-paciu-sau-paspestais-spastais-rizikuojame-atsidurti-ant-pavojingos-ribos.d?id=89958689 Milijonus Lietuvai kainavusios jėgainės gali tapti pačių sau paspęstais spąstais: rizikuojame atsidurti ant pavojingos ribos
  2. https://www.15min.lt/verslas/naujiena/energetika/vilniaus-kogeneracine-jegaine-baige-dar-viena-biokuro-jegaines-statybos-pirkima-664-1643282 Vilniaus kogeneracinė jėgainė baigė dar vieną biokuro jėgainės statybos pirkimą
  3. https://www.vaatc.lt/i-vilniaus-kogeneracine-jegaine-pradedamos-vezti-pirmosios-komunalines-atliekos/ Į Vilniaus kogeneracinę jėgainę pradedamos vežti pirmosios komunalinės atliekos