Vijay Nagar | |
Style: | Ahmedabad Metro |
Address: | Sardar Colony, Ahmedabad, Gujarat 380013 |
Coordinates: | 23.0562°N 72.5624°W |
Owned: | Gujarat Metro Rail Corporation Limited |
Operator: | Ahmedabad Metro |
Platforms: | Side platform Platform-1 → Motera Stadium Platform-2 → APMC |
Tracks: | 2 |
Structure: | Elevated, Double track |
Levels: | 2 |
Accessible: | Yes |
Status: | Operational |
Electrified: | 750 V DC third rail |
Map State: | collapsed |
Mapframe: | yes |
Mapframe-Marker: | rail |
Mapframe-Zoom: | 14 |
Vijay Nagar is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1] Around this metro station holds the main Naranpura neighbourhood. This metro station was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.
G | Street level | Exit/Entrance | |||
valign=top | L1 | valign=top | Mezzanine | valign=top | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left |-|style="border-bottom:solid 1px gray;" width=100|Platform 2 Southbound|style="border-bottom:solid 1px gray;" width=500|Towards → APMC Next Station: Usmanpura|-|Platform 1 Northbound|Towards ← Motera Stadium Next Station: Vadaj|-|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|Side platform | Doors will open on the left |-|style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|L2|style="border-bottom:solid 1px gray;" width=100||style="border-bottom:solid 1px gray;" width=500||-|} See also
External links |