Vijay Nagar metro station explained

Vijay Nagar
Style:Ahmedabad Metro
Address:Sardar Colony, Ahmedabad, Gujarat 380013
Coordinates:23.0562°N 72.5624°W
Owned:Gujarat Metro Rail Corporation Limited
Operator:Ahmedabad Metro
Platforms:Side platform
Platform-1 → Motera Stadium
Platform-2 → APMC
Tracks:2
Structure:Elevated, Double track
Levels:2
Accessible:Yes
Status:Operational
Electrified:750 V DC third rail
Map State:collapsed
Mapframe:yes
Mapframe-Marker:rail
Mapframe-Zoom:14

Vijay Nagar is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1] Around this metro station holds the main Naranpura neighbourhood. This metro station was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.

Station layout

GStreet levelExit/Entrance
valign=topL1valign=topMezzaninevalign=topFare control, station agent, Metro Card vending machines, crossover
L2Side platform | Doors will open on the left |-|style="border-bottom:solid 1px gray;" width=100|Platform 2
Southbound
|style="border-bottom:solid 1px gray;" width=500|Towards → APMC
Next Station: Usmanpura|-|Platform 1
Northbound
|Towards ← Motera Stadium
Next Station: Vadaj|-|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|Side platform | Doors will open on the left |-|style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|L2|style="border-bottom:solid 1px gray;" width=100||style="border-bottom:solid 1px gray;" width=500||-|}

See also

External links

Notes and References

  1. Web site: 2022-10-03 . Ahmedabad: Metro service on North-South corridor to begin on October 6 . 2023-08-12 . The Indian Express . en.