Vanguard SLV-2 explained

Vanguard SLV-2
Names List:Vanguard Space Launch Vehicle-2
Mission Type:International Geophysical Year
Operator:Naval Research Laboratory
Mission Duration:Failed to orbit
Spacecraft:Vanguard 2C
Spacecraft Type:Vanguard
Manufacturer:Naval Research Laboratory
Dimensions: of diameter
Launch Date:26 June 1958, 05:00:52 GMT
Launch Rocket:Vanguard SLV-2
Launch Site:Cape Canaveral, LC-18A
Launch Contractor:Glenn L. Martin Company
Decay Date:Failed to orbit
Orbit Reference:Geocentric orbit (planned)
Orbit Regime:Medium Earth orbit
Orbit Periapsis:655 km
Orbit Apoapsis:3970 km
Orbit Inclination:34.20°
Orbit Period:134.0 minutes
Apsis:gee
Programme:Project Vanguard
Previous Mission:Vanguard SLV-1
Next Mission:Vanguard SLV-3

Vanguard SLV-2, also called Vanguard Satellite Launch Vehicle-2 hoped to be the second successful flight of the American Vanguard rocket following successful Vanguard 1 satellite on rocket Vanguard TV-4.

Background

Vanguard Satellite Launch Vehicle-2 (SLV-2) was launched on 26 June 1958. The flight failed to reach orbit due to premature cutoff of the second stage rocket engine. The program objective was to launch into orbit a fully instrumented "X-ray and environmental satellite" to study maximum variations in intensity of X-rays from the Sun in the 1 to 8 angstrom wavelength bands and to make certain space environment measurements. The purpose of the IGY Vanguard satellite program, run by the U.S. Navy, was to launch one or more satellites into Earth orbit during the International Geophysical Year (IGY).

Launch Vehicle

Vanguard was the designation used for both the launch vehicle and the satellite. The first stage of the three-stage Vanguard Test vehicle was powered by a General Electric X-405 thrust liquid rocket engine, propelled by 7200 kg of kerosene (RP-1) and liquid oxygen, with helium pressurant. It also held 152 kg of hydrogen peroxide. It was finless, 13.4 metres tall, 1.14 metres in diameter, and had a launch mass of approximately 8090 kg.

The second stage was a 5.8 metres high, 0.8 metres diameter Aerojet General AJ-10 liquid engine burning 1520 kg Unsymmetrical dimethylhydrazine (UDMH) and White Inhibited Fuming Nitric Acid (WIFNA) with a helium pressurant tank. It produced a thrust of and had a launch mass of approximately 1990 kg. This stage contained the complete guidance and control system.

A solid-propellant rocket with of thrust (for 30 seconds burn time) was developed by the Grand Central Rocket Company to satisfy third-stage requirements. The stage was 1.5 metres high, 0.8 metres in diameter, and had a launch mass of 194 kg. The thin (0.076 cm) steel casing for the third stage had a hemispherical forward dome with a shaft at the center to support the satellite and an aft dome fairing into a steel exit nozzle.

The total height of the vehicle with the satellite fairing was about 21.9 meters. The payload capacity was 11.3 kg to a 555 km Earth orbit. A nominal launch would have the first stage firing for 144 seconds, bringing the rocket to an altitude of 58 km, followed by the second stage burn of 120 seconds to 480 km, whereupon the third stage would bring the satellite to orbit. This was the same launch vehicle configuration, with minor modifications, as used for Vanguard TV-3 and all succeeding Vanguard flights up to and including Vanguard SLV-6.

Spacecraft

Vanguard SLV-2 hoped to put into orbit the Vanguard 2C satellite, a Lyman Alpha satellite, with a magnetosphere measurement device. The satellite payload was . Vanguard SLV-2 only reached an altitude of, the goal was to orbit.[1] [2]

The SLV-2 satellite was a 9.75 kg, 50.8 cm diameter sphere. The spherical shell was magnesium, internally gold-plated and externally covered with an aluminum deposit coated with highly polished silicon monoxide of sufficient thickness to provide thermal control for the instrumentation. The interior was pressurized. The payload instrumentation package was mounted in the center of the sphere. The package was arranged in a cylindrical stack with the mercury batteries at the bottom, followed by the Minitrack tracking system electronics, the environment electronics, the telemetering instrumentation, and the experiment electronics. Below the package at the bottom of the sphere was the separation device, a spring loaded tube with a timer designed to push the satellite away from the third stage after orbit was reached. At the top of the interior of the sphere was a pressure gauge. Four spring-loaded metal rods were folded along the equator of the sphere and would protrude radially outward when deployed, acting as a turnstile antenna. It used an 80 mW transmitter at a frequency of 108.00 MHz.

Launch

Vanguard SLV-2 launched on 26 June 1958 at 05:00:52 GMT. It was launched from Launch Complex 18A (LC-18A) at the Cape Canaveral Air Force Station (CCAFS). The second stage engine shut down after only 8 seconds of operation, resulting in insufficient velocity to put the satellite into orbit. The investigation concluded that scale from the second stage oxidizer tank had clogged propellant feed lines and resulted in loss of thrust.[3] [4] [5] [1] [6]

Mission

Liftoff was nominal, but low oxidizer feed pressure caused the second stage rocket engine to shut down after firing for only 8 seconds, 152.6 seconds after launch, resulting in insufficient velocity to arm the third stage for firing and causing termination of the flight. The premature shutdown caused the propellant tank pressures to exceed design values without failing, proving the structural integrity of the tankage.[6]

See also

Further reading

Notes and References

  1. https://web.archive.org/web/20020506201411/http://www.astronautix.com/lvs/vanguard.htm astronautix.com, Vanguard
  2. http://space.skyrocket.de/doc_sdat/vanguard-20in_la.htm Gunter's Space Page, Vanguard SLV-2
  3. https://web.archive.org/web/20151226162942/http://www.dtic.mil/dtic/tr/fulltext/u2/256594.pdf NASA Vanguard Satellite Launch Vehicle, May 1961
  4. https://history.nasa.gov/SP-4202.pdf NASA, NASA History Vanguard
  5. http://www.hq.nasa.gov/office/pao/History/Timeline/1958.html NASA, Aeronautics and Astronautics Chronology, 1958
  6. Web site: Display: Vanguard SLV-2 VAGSL2. NASA. 14 May 2020. 3 February 2021.