VAG Class DT3 explained
VAG Class DT3 |
Manufacturer: | Siemens |
Family: | Modular Metro |
Yearconstruction: | 2004 - 2011 |
Numberbuilt: | 92 vehicles (46 sets) |
Formation: | 2 cars per set |
Fleetnumbers: | 701/702 - 763/764 (DT3) |
Capacity: | 308 (82 seated) |
Operator: | VAG |
Carbody: | Aluminium |
Trainlength: | 37.72m (123.75feet) |
Width: | 2.9m (09.5feet) |
Doors: | 3 pairs per side |
Maxspeed: | 801NaN1 |
Weight: | 59.2t |
Traction: | IGBT–VVVF |
Poweroutput: | 1,120 kW |
Electricsystem: | 750 V DC third rail |
Collectionmethod: | contact shoe pantograph (maintenance only) |
Brakes: | Electric brake, pneumatic brake, spring accumulator brake |
Safety: | ATC, ATO, ATP |
The VAG Class DT3 is an electric multiple unit (EMU) train type operated by the Verkehrs-Aktiengesellschaft Nürnberg on the Nuremberg U-Bahn system. It is the first type of rolling stock on the Nuremberg U-Bahn that has gangways between the individual cars.[1]
Formation
Every DT3 train consists of two permanently coupled cars, forming a twin-unit. The cars are connected with a gangway, allowing passengers to walk into the adjacent car. The trains are equipped with automatic couplers, enabling operation of up to two units together to form a four-car train.[1]
Interior
Seating accommodation consists of transverse seating bays as well as folding seats. The trains have displays which show the name of the next station, and CCTV cameras.[1] Passenger information screens and a passenger counting system are implemented in the DT3-F trains.[2] [3]
Technical specifications
The car bodies are made out of aluminium, and the trains are powered by three-phase-asynchronous motors.[1] As they are used in automatic operation, the DT3 trains are not equipped with full driving cabs, but only with small concealed driving panels, which are used for maintenance.[4] The DT3-F trains are equipped with full driving cabs, enabling them to be used on driver operated services on non-automated lines. The cabs are designed to be removed in case of a conversion for fully automated operation.[5] Besides the power supply by contact shoes, every unit is also equipped with a pantograph, as parts of the maintenance facilities are electrified with overhead lines.[1]
History
The first unit was delivered in April 2004 as part of the "Rubin" project, which planned to introduce fully automated trains on the Nuremberg U-Bahn.[4] [1] Rubin is an acronym for Realisierung einer automatisierten U-Bahn in Nürnberg (Implementation of an automated U-Bahn in Nuremberg).[6] [7] Automated test running on line U3 began in January 2005.[4] [1] On May 4, 2008, the first DT3 trains entered automatic revenue service on line U3.[6] Driverless operation was officially launched on June 14, 2008, two years later than anticipated.[8] [9] Originally scheduled for 2006, the official launch of driverless operation had to be pushed back to 2008 due to technical difficulties[10] and mechanical problems, which resulted in the return of two prototype DT3 sets to the supplier Siemens.[11] Fully automatic trial runs on line U2 began on January 13, 2009, while the trains were already in automatic revenue service on line U3.[12]
DT3-F
A second batch of 14 DT3 trains was ordered in 2008.[13] These units, classified as DT3-F, feature a full control cab for manual operation, but also can be operated fully automatic.[13] First DT3-F units arrived in Nuremberg at the end of August 2010.[5] The DT3-F trains entered service in May 2011.[14] The "F" in the designation indicates the option of manual operation and means "Fahrer" (German for "driver").
See also
External links
Notes and References
- Book: Pabst, Martin . S-Bahn- und U-Bahn-Fahrzeuge in Deutschland . S-Bahn and U-Bahn vehicles in Germany . 2nd . 74-77, 84, 85 . de . 2006 . GeraMond . 3-7654-7366-9.
- Web site: . VAG Nürnberg: Der erste DT3-F ist angekommen . VAG Nürnberg: The first DT3-F has arrived . de . August 31, 2010 . eurailpress.de . DVV Media Group GmbH . November 5, 2018 . https://web.archive.org/web/20181106053357/https://www.eurailpress.de/news/bahnbetrieb/single-view/news/vag-nuernberg-der-erste-dt3-f-ist-angekommen-1.html . November 6, 2018 . dead.
- Web site: Grewe . Tilmann . An der U-Bahn-Tür wird fast jeder gezählt . Almost everyone gets counted at the subway door . de . June 7, 2011 . nordbayern.de . Verlag Nürnberger Presse Druckhaus Nürnberg GmbH & Co. KG . November 5, 2018 . https://web.archive.org/web/20181106171910/https://www.nordbayern.de/ressorts/an-der-u-bahn-tur-wird-fast-jeder-gezahlt-1.1285446 . November 6, 2018 . live.
- Web site: Rubin moves into testing phase . . February 1, 2005 . metro-report.com . . November 3, 2018 . https://web.archive.org/web/20181106132128/https://www.metro-report.com/news/metro/single-view/view/rubin-moves-into-testing-phase.html . November 6, 2018 . dead.
- Web site: Nürnberg DT3-F metro train arrives . . September 17, 2010 . railwaygazette.com . Railway Gazette International. November 3, 2018 . https://web.archive.org/web/20181106171507/https://www.railwaygazette.com/news/single-view/view/nuernberg-dt3-f-arrives.html . November 6, 2018 . live.
- Web site: Driverless operations start in Nürnberg . . May 6, 2008 . railwaygazette.com . Railway Gazette International. November 3, 2018 . https://web.archive.org/web/20160719022709/https://www.railwaygazette.com/news/single-view/view/driverless-operations-start-in-nuernberg.html . July 19, 2016 . dead.
- Web site: Nürnberg testet erste fahrerlose U-Bahn . . Nuremberg is testing the first driverless subway . December 6, 2006 . spiegel.de . SPIEGEL ONLINE GmbH & Co. KG . November 3, 2018 . https://web.archive.org/web/20181103163221/https://www.spiegel.de/reise/aktuell/vollautomatisch-im-untergrund-nuernberg-testet-erste-fahrerlose-u-bahn-a-452912.html . November 3, 2018 . live.
- Web site: Eisenack . Gabriele . Start vor 10 Jahren: Fahrerlose U-Bahn laut VAG ein Erfolg . Start 10 years ago: Driverless U-Bahn is a success, according to VAG . de . June 12, 2018 . nordbayern.de . Verlag Nürnberger Presse Druckhaus Nürnberg GmbH & Co. KG . November 5, 2018 . https://web.archive.org/web/20181106135254/https://www.nordbayern.de/region/nuernberg/start-vor-10-jahren-fahrerlose-u-bahn-laut-vag-ein-erfolg-1.7691819 . November 6, 2018 . live.
- Web site: Feddern . Boi . Fahrerlose U-Bahn nimmt in Nürnberg offiziell den Betrieb auf . Driverless U-Bahn officially begins operation in Nuremberg . de . June 15, 2008 . heise.de . Heise Medien GmbH & Co. KG . November 5, 2018 . https://web.archive.org/web/20190910140123/https://www.heise.de/newsticker/meldung/Fahrerlose-U-Bahn-nimmt-in-Nuernberg-offiziell-den-Betrieb-auf-214327.html . September 10, 2019 . live.
- Web site: Fischer . André . Nürnberger U-Bahn fährt seit fünf Jahren fahrerlos . Nuremberg U-Bahn runs driverless since five years . de . June 14, 2013 . nordbayern.de . Verlag Nürnberger Presse Druckhaus Nürnberg GmbH & Co. KG . November 5, 2018 . https://web.archive.org/web/20181107032446/http://www.nordbayern.de/region/nuernberg/nurnberger-u-bahn-fahrt-seit-funf-jahren-fahrerlos-1.2971462 . November 7, 2018 . live.
- Web site: Rubin project loses momentum . . May 1, 2007 . railwaygazette.com . Railway Gazette . November 5, 2018 . https://web.archive.org/web/20181106094323/https://www.railwaygazette.com/news/single-view/view/rubin-project-loses-momentum.html . November 6, 2018 . live.
- Web site: Urban rail news in brief - February 2009 . . February 21, 2009 . metro-report.com . Metro Report International . November 3, 2018 . https://web.archive.org/web/20181106053416/https://www.metro-report.com/news/metro/single-view/view/urban-rail-news-in-brief-february-2009.html . November 6, 2018 . dead.
- Web site: Grewe . Tilmann . VAG hat 14 neue U-Bahnzüge bestellt . VAG has ordered 14 new U-Bahn trains . de . September 27, 2008 . nordbayern.de . Verlag Nürnberger Presse Druckhaus Nürnberg GmbH & Co. KG . November 5, 2018 . https://archive.today/20190910140733/https://www.nordbayern.de/2.192/vag-hat-14-neue-u-bahnzuge-bestellt-1.895754 . September 10, 2019 . live.
- Book: Reinhardt, Winfried . Geschichte des Öffentlichen Personenverkehrs von den Anfängen bis 2014: Mobilität in Deutschland mit Eisenbahn, U-Bahn, Straßenbahn und Bus. History of public transport from the beginning to 2014: Mobility in Germany with railway, subway, tramway and bus . 792, 793 . de . 2014 . Springer-Verlag . 978-3-658-06628-4.