University Avenue station explained

University Avenue
Line Name:7
Station Number:S03
Address:Commonwealth Avenue, U.P. Campus
Quezon City, Metro Manila
Country:Philippines
Coordinates:14.655°N 121.0549°W
Line:
Structure:Underground
Platform:2 side
Tracks:2 (4 in the future)
Opened:Line 7: 2025
Line 8: TBA
Status:Under construction
Accessible:Yes
Code:UA
Owned:Line 7: SMC-Mass Rail Transit 7 Incorporated
Line 8: TBA

University Avenue station is an under-construction Metro Rail Transit (MRT) station located on the MRT Line 7 (MRT-7) system along Commonwealth Avenue in UP Campus, Quezon City. It will also serve as the eastern terminus of the proposed MRT Line 8 (MRT-8) system. The station itself is located within the campus of the University of the Philippines Diliman and is named after University Avenue, the main road leading towards the university. The MRT-7 system has a proposed spur line to connect itself to the LRT Line 2 (LRT-2) system at Katipunan station, passing through the University of the Philippines Diliman and Katipunan Avenue, while the MRT-8 system will terminate at this station with a spur line towards its depot further inside UP Diliman. Construction started on August 15, 2017[1] and was expected to end around April 2018.[2]

When completed, the station will serve the following destinations: University of the Philippines Diliman, U.P.–Ayala Land TechnoHub, Philippine Coconut Authority (PhilCoa), and the Commission on Human Rights Complex.

The station, unlike the separate Quezon Memorial stations of MRT-7 and MRT-8, will be situated at the same complex with the MRT-8 building platforms side-by-side the MRT-7 platforms thereby creating a common station.

External links

Notes and References

  1. News: Brace for heavy traffic on Commonwealth Avenue as MRT-7 construction starts . 7 July 2022 . GMA News Online . 13 August 2017 . en.
  2. News: Sauler . Erika . Heavy traffic on Commonwealth Avenue as MRT 7 work begins . 7 July 2022 . newsinfo.inquirer.net/ . Inquirer.net . 14 August 2017.