United States Courthouse (Austin, Texas, 2012) Explained

United States Courthouse
Map Type:Texas#USA
Map Dot Label:Austin
Relief:yes
Architectural Style:Modernist
Location:510 W 5th St.
Austin, Texas 78701
Coordinates:30.2681°N -97.7484°W
Groundbreaking Date:September 2009
Completion Date:November 30, 2012
Cost:$123 million
Owner:General Services Administration
Height:135feet
Floor Count:8
Floor Area:252420square feet
Architecture Firm:Mack Scogin Merrill Elam Architects
Civil Engineer:Page Southerland Page
Main Contractor:White Construction Company
Awards:2014 GSA Design Award[1]
Unit Count:-->

The Austin United States Courthouse is a federal courthouse in downtown Austin, Texas. Built between 2009 and 2012, the building houses the Austin division of the United States District Court for the Western District of Texas and other federal judicial offices. It replaced the 1936 Austin U.S. Courthouse, which has since been transferred to Travis County to hold county judicial space.

History

Austin's previous federal courthouse was built in 1936 under the Public Works Administration. By the 2000s, Austin's population growth in the intervening decades had increased the court's caseload beyond what the courthouse could support.[2] In 2002 the General Services Administration retained architects to design a new, larger courthouse complex for Austin,[3] and in 2004 the GSA purchased a parcel of land in downtown Austin to eventually hold the facility. At the time, the plot held a derelict and incomplete structure that had once been intended as a computer processor design center for Intel, known locally after its abandonment as the "Intel Shell." The GSA demolished this structure in 2007 and indicated that it planned to begin building a new courthouse in 2009, to be completed in 2012.[4]

When the federal government enacted the American Recovery and Reinvestment Act of 2009 in response to the then-ongoing Great Recession, some of the economic stimulus funds were allocated for the construction of the new Austin courthouse. Construction contractors broke ground in September 2009, with plans to complete the building in three years on a budget of $96 million (equivalent to $ million in);[5] in fact, with modest delays and cost overages, the construction lasted for three years and three months and ultimately cost $123 million (equivalent to $ million in). The new courthouse was opened to the public on December 3, 2012, at which point all federal courts and offices in the old building were transferred to the new facility.[2]

Design

The Austin U.S. Courthouse is an eight-story steel-and-concrete building clad with cream-colored limestone. The courthouse has a modernist design, with a stark cubic form and geometric external details.[6] The facility was designed by Atlanta-based architectural firm Mack Scogin Merrill Elam Architects and built by the White Construction Company,[3] with additional civil engineering by Page Southerland Page.[7]

Exterior

The courthouse complex occupies the full city block between Fourth, Fifth, San Antonio and Nueces Streets,[2] immediately west of Republic Square. The exterior is covered in a mixture of banded limestone cladding, dark stainless steel, and narrow multi-story glazing. The rectangular form sits atop a concrete plinth set back 50feet from the streets, creating broad sidewalks on all sides.[3] The segment of San Antonio street between the courthouse and Republic Square is closed to vehicles, forming a wide plaza of concrete pavers, wooden benches and shade trees in front of the courthouse's principal, eastern facade.[2] The main entrance is in the northeast corner at ground level.[3]

Interior

The building contains eight courtrooms and ten judge's chambers,[2] with the major interior spaces characterized by wood paneling of warm-colored pecan and pervasive daylighting.[6] The courtrooms, jury chambers and public spaces hug the exterior walls, making use of the multi-story windows for light and external views. As much glass is used within the structure as in its external envelope, encouraging the diffusion of natural light into interior spaces and extending sight lines. The abundant use of glass and windows was meant to symbolically express the importance of transparency to the operation of the justice system and the public's confidence in it.[3]

The Austin Wall

The two-story ground-level lobby connects to an atrium which runs the length of the building from west to east, providing external views of the Austin skyline to the east and the Texas Hill Country to the west.[3] The lobby is separated from the jury assembly chamber by a 784square feet stained-glass mural by artist Clifford Ross, titled The Austin Wall.[8] The upper portion of the mural is a composite of brightly colored hanging panels, and the lower, black-and-white portion doubles as a set of doors.[3] The work is a representation of high-resolution photographs of the Texas Hill Country; it was developed using a combination of traditional stained-glass techniques (in cooperation with Franz Mayer & Co. of Munich) and digital printing.[9]

Reception

In 2016, the building's architecture received an award from the Justice Facilities Review from the American Institute of Architects.[10] It has been called an example of the "innovative public building projects that embrace contemporary design strategies and material approaches" that were enabled by the 1962 "Guiding Principles for Federal Architecture" directive.[11] In 2020, the Trump administration announced an executive order to rewrite national guidelines for federal architecture. A draft of the executive order, titled "Make Federal Buildings Great Again", cited the Austin United States Courthouse as an example of a federal building “influenced by Brutalism and Deconstructivism" and having “little aesthetic appeal.”[12]

See also

Notes and References

  1. Web site: 20 Federal Buildings Honored as Nation’s Top in Design and Architecture. GSABLOG. Les. Shepherd. April 30, 2014. February 26, 2018.
  2. News: New federal courthouse opens in Austin. Austin American-Statesman. Juan. Castillo. December 3, 2012. January 17, 2018.
  3. Irreconcilable Differences Resolved. Lawrence. Connolly. Texas Architect. May–June 2013. 34–39. January 17, 2018.
  4. News: Farewell, Intel Shell: Gigantic Downtown symbol of bust-and-boom economy comes down. The Austin Chronicle. Katherine. Gregor. February 23, 2007. January 17, 2018.
  5. Web site: United States Courthouse – Austin, Texas. Mack Scogin Merrill Elam Architects. February 26, 2018.
  6. News: Photos: Inside Downtown Austin’s New Federal Courthouse. KUT. Filipa. Rodrigues. Wells. Dunbar. December 7, 2012. January 17, 2018.
  7. Web site: U.S. Courthouse - Austin. Page Southerland Page. February 26, 2018.
  8. News: Photos: The Three & a Half-Ton Stained Glass 'Austin Wall'. KUT. Hector. Perez. June 18, 2013. January 17, 2018.
  9. News: Old And New Tech Combine In An Artistic Masterpiece. Knapp. Alex. Forbes. July 12, 2013. January 17, 2018.
  10. Web site: United States Courthouse, Austin, Texas . 2016 Justice Facilities Review . AIA . 2016 . February 7, 2020.
  11. Web site: New executive order could make classical architecture "the preferred and default style" for America's public buildings. Pacheco. Antonio. 2020-02-04. Archinect. en. 2020-02-09.
  12. Web site: Will the White House order new federal architecture to be Classical? . McGuigan, Cathleen . Architectural Record . February 4, 2020 . February 7, 2020.