USS Michael Monsoor explained

USS Michael Monsoor (DDG-1001) is the second ship of the three-ship of guided missile destroyers. The Zumwalt-class was designed as a multi-mission surface combatant for land attack and littoral operations with a mission of supporting both ground campaigns and the joint/naval battlespace. The main guns are a pair of Advanced Gun Systems (AGS). The Navy cancelled the ammunition procurement program for the only type of ammunition it can use, so the AGS cannot provide naval gunfire support[1] and the Zumwalts were repurposed for surface warfare.[2]

Design

Michael Monsoor is the second Zumwalt-class destroyer. The ship is 600feet in length, with a beam of 80.7feet and displacing approximately 15,000 tons. Michael Monsoor has a crew size of approximately 148 officers and sailors; she can make speed in excess of 30kn.

Namesake

Michael Monsoor is named after Master-at-Arms Second Class Michael A. Monsoor (1981–2006), a United States Navy SEAL killed during the Iraq War and posthumously awarded the Medal of Honor.[3]

Construction and career

Assembly of modules for Michael Monsoor began in March 2010.[4] The keel laying and authentication ceremony for Michael Monsoor was held at the General Dynamics-Bath Iron Works shipyard on 23 May 2013.[5] Michael Monsoor was launched on 21 June 2016.[6]

Electrical failure during trials

On 4 December 2017, Michael Monsoor had problems with the complex electrical system which ended builders' trials early and forced the ship to return to the General Dynamics Bath Iron Works shipyard in Maine. A harmonic filter aboard failed one day after she left the yard. The ship returned to the yard on 5 December 2017. Harmonic filters are used in complex electrical systems to prevent unintended power fluctuations from damaging sensitive equipment. The delay in sea trials would not affect her expected March 2018 delivery.[7]

Service with the U.S. Navy

The Navy chose to use an unusual two-part commissioning scheme for the Zumwalt-class. The initial commissioning was done prior to weapons systems integration, and the ships were placed in the status of "in commission, special", before sailing to San Diego for weapons installation and final acceptance. Zumwalt and Michael Monsoor used this scheme, while the third and final ship in the class, Lyndon B. Johnson, will use the more traditional approach with formal commissioning after final acceptance.[8]

Michael Monsoor was delivered to the Navy in April 2018,[9] and commissioned on 26 January 2019, at Naval Air Station North Island. She is homeported at Naval Base San Diego. Chief of Naval Operations Admiral Mike Gilday visited Michael Monsoor while in San Diego on 25 February 2021.[10]

Michael Monsoor participated in RIMPAC 2022.[11]

See also

References

Attribution

External links

Notes and References

  1. Web site: No New Round Planned For Zumwalt Destroyer Gun System; Navy Monitoring Industry . LaGrone . Sam . 11 January 2018 . USNI News . U.S. Naval Institute . 2 March 2018.
  2. Web site: New Requirements for DDG-1000 Focus on Surface Strike . Eckstein . Megan . 4 December 2017 . USNI News . U.S. Naval Institute . 2 March 2018.
  3. Web site: Michael A. Monsoor. militarytimes.com. Military Times. 24 December 2010. 29 March 2009. https://web.archive.org/web/20090329215644/http://www.militarytimes.com/citations-medals-awards/recipient.php?recipientid=2377. dead.
  4. January 2012 . Flash Traffic: Keel Laid for 1st DDG-1000 Destroyer . The Navy . Navy League of Australia . 74 . 1 . 15 . 1322-6231.
  5. Web site: NAVSEA Office of Corporate Communications . Future USS Michael Monsoor (DDG 1001) Keel Authenticated . Navy.mil . 9 July 2014.
  6. Web site: Navy Christens DDG-1001, Named For SEAL Michael Monsoor. 20 June 2016. U.S. Naval Institute.
  7. Web site: Electrical Problems Shorten Second Zumwalt-class Destroyer's Builders Trials . 11 December 2017 . usni.org . 13 December 2017.
  8. Web site: Geurts: Third Zumwalt DDG Will Be Commissioned After Combat Systems Activation. Burgess. Richard R.. April 28, 2020. Seapower Magazine. February 12, 2021.
  9. Web site: Navy Accepts Delivery of Future USS Michael Monsoor. 25 April 2018. Military.com. en. 27 April 2018.
  10. Web site: 2021-02-25. CNO Visits Aircraft Carrier Nimitz as CSG Nears End of Nearly 11 Months Away From Home. 2021-02-26. USNI News. en-US.
  11. News: USNI News Fleet and Marine Tracker . 9 August 2022 . news.usni.org . 1 August 2022.