Though the original designs for the Casco-class monitors were drawn by John Ericsson, the final revision was created by Chief Engineer Alban B. Simers following Rear Admiral Samuel F. Du Pont's failed bombardment of Fort Sumter in 1863. By the time the plans were put before the Monitor Board in New York, NY, Ericsson and Simers had a poor relationship and Chief of the Bureau of Construction and Repair John Lenthall had little connection to the board. This resulted in the plans being approved and 20 vessels ordered without serious scrutiny of the new design. $14 million US was allocated for the construction of these vessels. It was discovered that Simers had failed to compensate for the armor his revisions added to the original plan and this resulted in excessive stress on the wooden hull frames and a freeboard of only 3 inches. Simers was removed from the control of the project and Ericsson was called in to undo the damage. He was forced to raise the hulls of the monitors under construction by 22 inches to make them seaworthy.
The entire class was considered a disappointment, and Etlah was laid up at one or another location until sold 12 September 1874. Between 15 June and 10 August 1869, she bore the name Hecate while being laid up at Mound City, IL.