U9 (Berlin U-Bahn) Explained

Image Alt:Hansaplatz, one of the stations of the U9
Type:Rapid transit
System:Berlin U-Bahn
Locale:Berlin
Start:Osloer Straße
End:Rathaus Steglitz
Stations:18
Operator:Berliner Verkehrsbetriebe
Linelength Km:12.5
Linelength:[1]
Load Gauge:German: [[Großprofil]]
Electrification: third rail (bottom running)
Map State:uncollapsed

U9 is a line on the Berlin U-Bahn. The line was opened on 28 August 1961 as Line G.

Route

The path of the U9 is completely underground. It starts in the north at Osloer Straße in Gesundbrunnen and runs through Wedding before passing under the Berlin Ringbahn and running through Moabit, reaching Hansaplatz and Tiergarten before crossing the Berlin Stadtbahn at the Zoo and Kurfürstendamm, eventually leaving western central Berlin by heading to Friedenau and finally Steglitz at Rathaus Steglitz.

History

First stage of construction

After the division of Berlin in 1948, the citizens of West Berlin preferred buses and trams that bypassed East Berlin. Furthermore, the highly populated boroughs of Steglitz, Wedding and Reinickendorf were in need of rapid transit access to the new center of West Berlin south of the Zoo. This prompted the construction of a completely new line, then called line G, becoming the third north–south line after line C (modern U6) and line D (modern U8).

Groundbreaking took place on 23 June 1955 at Tiergarten. Construction was difficult as it needed to pass under four U-Bahn lines (U1, U2, U3, U6), two S-Bahn lines (Stadtbahn, Ringbahn twice) and three waterways (Spree River, Landwehr Canal, Berlin-Spandau Canal).

Line G from Leopoldplatz to Spichernstraße was planned to open on 2 September 1961. This was pushed up to 28 August 1961 after the construction of the Berlin Wall underscored the necessity of this new line. To accommodate the U9, the Nürnberger Platz station was closed. It was replaced by Spichernstraße (opened 2 June 1959) and Augsburger Straße (opened 8 May 1961) stations respectively.

The new stations include:

It will also interchange with the smaller profile station, but it was opened on the same day as U9 was opened:

Second stage

Since the subsidies from the Federal Republic still went to West Berlin, was further built on the busy subway. On 29 January 1971, the longest subway extensions was implemented. The U7 takes the lead of the Möckernbrücke to Fehrbelliner Platz, Line 9 of the Spichernstraße to Walther-Schreiber-Platz. Nine kilometers of track with eleven new stations went into operation on that day. Groundbreaking began 1 July 1962. For the Steglitz and Neukölln a fast connection to the western center and no longer had the buses in claim take.

The route follows the U9 from the previous terminus Spichernstraße the Bundesallee and crosses line U7 on Berliner Straße. The lower platform is a central platform, the U9 has here. This however is not in the usual sense: On one side of the platform, climb—at the station Berliner Straße usually on the right side, but on the left side—seen in the direction of travel. It could also be seen as apart Laid central platforms the platforms thus. Only one transition at the north end of both platforms interconnects. This construction project was necessary because the subway construction, a road tunnel between the two side platforms was built.

Similar to the Berliner Straße railway station also encloses the then-newly built Bundesplatz a road tunnel, which is why no central platform was also built here. The tracks split up shortly before the station to bypass the tunnel and there were two side platforms.

All stations were built designed by Rainer G. Rümmler. Here, instead of the current ceramic tiles, large-format colorful fiber cement plates are used, such as the station Walther-Schreiber-Platz. Even should associations by the color scheme is always new are awakened. From Bahnhof Berliner Straße, the colors are white and red on the Coat of arms of Berlin remember, at the station Eisenacher Straße U7 the green faces on the Thuringian Forest at Eisenach. Another reason why the architect is very controversial.

Final extension

Between Walther-Schreiber-Platz station and the Schloßstraße the U9 changes to the tunnel section of U10. In Schloßstraße station itself, the tracks are heading north on the top, in the direction of Rathaus Steglitz on the lower level, however, the offices on the eastern edge of the platform on which was supposed to take the U10. The western edge of the platform is separated by a fence from the passenger traffic. In track trough, unused tracks are laid without power rail. To date, there hangs the sign "No trains". By these enormous constructed provisions, the cost of one meter underground route exorbitantly to 78,000 Mark (adjusted for purchasing power in today's money).

Behind the Schloßstraße ends the U9 at the Rathaus Steglitz. The paths of U9 and U10 here separate again. Both lines should keep in Steglitz at separate stations, viewed from Schloßstraße from an end opening "V" would form. The intended actually for the U9 station Part (Rzo) is equipped with side platforms, located in the minus-1 level until now has been completed only in the shell and is cut off as a storeroom for the civil protection used. The original platform is operated for the U9 instead of planned for the U10 Station part (Rzu) in the minus-2 level.

The background for this management decision lies at the intersection of the planned U9-line and Wannseebahn immediately south of the station. In the 1970s, negotiations with the Deutsche Reichsbahn regarding the railway line to Steglitz station proved unsuccessful. Consequently, the BVG did not create the necessary sweeping system behind the station. Unlike the west-extending U10, the U9 faced challenges, leading it to be routed along the U10 with a reversing facility. In January 1984, when the operation shifted to BVG, an opportunity arose to pass under the S-Bahn without reopening negotiations with the Reichsbahn. With this assurance, the functionless tunnel was extended beneath the railway embankment in the mid-1980s. However, a reversing facility, or at least a part of it, was not incorporated into this section, with plans to address this in a subsequent part of the tunnel.

The section to Rathaus Stegliz was definitely opened on 30 September 1974, its construction began on 7 July 1969.

The addition is from Leopoldplatz to Osloer Straße. It was opened on 30 April 1976, construction began on 6 November 1969. Since this was not feasible but due to the political situation, they let the U9 only to cross Osloer Straße/Swedener Straße construct. They were provided for two new stations: Nauener Platz, Turmstraße, and Osloer Straße. Until then, the U8 can be extended. This resulted in the situation that this tower station could be built without regard to existing underground services. It has also helped build a spacious, bright basement distribution, in which there are several shops and snack bars.

Planned extensions

The route was suggested to go via Holzstraße, Wollankstraße and will be divided into two options:

All planned extensions were abandoned due to low patronage.

Notes and References

  1. Web site: Berlin Subway • Trackmap. Gleisplanweb.de. Christian Stade. 11 June 2023. https://web.archive.org/web/20230407175434/https://gleisplanweb.eu/Maps/Berlin2.pdf. 7 April 2023. Kranenburg. de,en. 11 December 2022.