U.S. Route 97 in Washington explained

State:WA
Type:US
Route:97
Section:155
Map Custom:yes
Map Notes:US 97 highlighted in red.
Length Mi:321.62
Length Ref:[1]
Established:1926[2]
Direction A:South
Terminus A: at the Oregon state line in Maryhill
Junction:
Direction B:North
Terminus B: at the Canada–US border near Oroville
Tourist:
Counties:Klickitat, Yakima, Kittitas, Chelan, Douglas, Okanogan
Previous Type:SR
Previous Route:96
Next Type:SR
Next Route:99

U.S. Route 97 (US 97) in the U.S. state of Washington is a 322miles route which traverses from the Oregon state line at the northern end of the Sam Hill Memorial Bridge in Maryhill, north to the Canada–US border in Okanogan County near Oroville. The highway serves major cities such as Goldendale, Yakima, Ellensburg and Wenatchee before continuing towards the Alaska Highway at the Yukon border as British Columbia Highway 97. Along the length of the roadway, US 97 is concurrent with State Route 14 (SR 14) in Maryhill, Interstate 82 (I-82) and US 12 between Union Gap and Ellensburg, I-90 briefly in Ellensburg, US 2 between Peshastin and rural Douglas County and SR 20 near Omak. An alternate route connects the highway with Chelan.

The first segment of what is now US 97 in Washington to be included in the state highway system was a road extending from Wenatchee to Twisp, designated in 1897. Since, four early highways formed the modern route of the roadway: State Road 8, State Road 3, State Road 2 and State Road 10, all signed in 1923. The United States Numbered Highways were established in 1926 and US 97 was co-signed with all four state roads, including two concurrencies with US 410 and US 10. The state roads became Primary state highways in 1937, keeping their numbers from the previous system and US 10 was moved south in 1940 and its original alignment, including the concurrency, became US 2 in 1946. The Sam Hill Memorial Bridge, originally named the Biggs Rapids Bridge, was first opened on November 1, 1962, but the river has been crossed by a ferry at the same location since the early 1920s. During the 1964 highway renumbering, all four highways were replaced by US 97 and in 1956, the Interstate Highway System was established, including two highways (I-82 and I-90) concurrent with US 97. US 12 replaced US 410 during its extension west in 1967. In 1987, US 97 was moved across the Columbia River in Chelan County, establishing US 97 Alternate and decommissioning SR 151. Until 2006, US 197 was co-signed with SR 14 between Dallesport and Maryhill. The bridge deck was replaced between 2007 and 2009 and the bridge was closed in 2008. Five other minor projects, such as repavings and sidewalk additions, have already been completed, but eight projects have yet to be completed.

Route description

US 97 is a major highway in Washington that spans 3223NaN3 and consists of mostly two lanes;[1] it is undivided except for the sections that are in urban areas, such as Wenatchee, and concurrencies with I-82 and I-90.[3] The entire route from the Oregon state line to the Canada–US border is part of the National Highway System, a system of roadways classified as important to the nation's economy, defense and mobility.[4] [5] At the southern terminus of the I-82 – US 12 concurrency in Union Gap, US 97 had an estimated daily average of 20,000 motorists in 2007, making it both the busiest segment of the highway in Washington and the fifth busiest segment of U.S. routes in Washington.[6] The busiest segment of US 97 in 1970 was at Main Street in Selah, with a daily average of 17,100 motorists.[7]

Several portions of US 97 carry official designations conferred by the state legislature or the Washington State Transportation Commission at the request of local governments and groups. The section in Klickitat County was designated as the World War II Veterans Memorial Highway in 2020;[8] the same designation was applied to the Douglas County section in 2022.[9]

Oregon to Ellensburg

US 97 enters Washington on the Sam Hill Memorial Bridge, which crosses the Columbia River between Biggs Junction, Oregon, and Maryhill, Washington. The bridge is immediately north of an interchange with I-84 and US 30 on the Oregon side of the river. After crossing the bridge, the highway turns east to serve Maryhill State Park and crosses over the BNSF Railway's Fallbridge Subdivision, a major railroad that also carries part of Amtrak's Empire Builder passenger service.[10] [11] US 97 ascends from the Columbia River Gorge and turns north near a Stonehenge replica to intersect State Route 14 (SR 14),[12] a riverside highway between Vancouver and the Tri-Cities that US 97 briefly follows west in a concurrency.[13]

The highway leaves SR 14 and its spur route to continue northeast into the Columbia Hills by following Davies Pass, parallel to the historic Maryhill Loops Road.[14] [15] US 97 reaches a plateau at the top of the hills and heads north, passing the Windy Point/Windy Flats and Big Horn wind farms and skirting the east side of Goldendale, where it intersects SR 142.[16] The highway passes Goldendale Observatory State Park and follows the Little Kickitat River northeast into the Simcoe Mountains, traversing a lodgepole pine forest and serving a small Greek Orthodox monastery and Brooks Memorial State Park.[17] [18] It then crosses the Simcoe Mountains at Satus Pass, 3107feet above sea level,[13] and enters the Yakama Indian Reservation.

US 97 descends from the mountains by following Satus Creek northeast through the semi-arid steppe hills of southern Yakima County.[17] The highway makes a series of turns to cross a gap in the Toppenish Ridge and enter the Yakima Valley, passing through the Toppenish National Wildlife Refuge and irrigated farmland. US 97 then reaches the outskirts of Toppenish, where it intersects SR 22 and turns northwest onto a four-lane divided highway. The highway continues northwest around Wapato and follows a railroad on the south side of Yakima River, opposite from I-82. US 97 turns northeast to run along the river bank through a gap between the Ahtanum Ridge and Rattlesnake Hills and merges with I-82 south of the city of Union Gap. A triple concurrency is formed on the freeway, carrying I-82, US 97, and US 12 around the east side of Yakima and through a junction with SR 24.[13]

US 12 leaves the concurrency at an interchange in northern Yakima to travel west towards White Pass while I-82/US 97 continues north across the Naches and Yakima rivers. The freeway crosses the rivers at a narrow gap in Selah Ridge and is separated by SR 823, which runs in the median and intersects I-82/US 97 on the south side of Selah. The freeway turns northeast and continues around Selah, intersecting SR 821 at the south end of the Yakima Canyon Highway. I-82/US 97 crosses Selah Creek on the Fred G. Redmon Bridge, a twinned concrete arch bridge that was the longest of its kind in the United States when it was built.[19] The freeway ascends the Umtanum and Manastash ridges as it passes near the Yakima Firing Center and through undeveloped areas. It then descends into the Kittitas Valley, intersecting SR 821 again and turning north to reach the terminus of I-82 at an interchange with I-90 southeast of Ellensburg.[13]

Ellensburg to Canada

US 97 turns west to overlap with I-90 as it bypasses Ellensburg and follows the Yakima River upstream towards the Cascade Range. The concurrency ends in the western outskirts of Ellensburg, as US 97 briefly uses a section of University Way before turning north at a roundabout. The highway turns northwest after crossing the BNSF Stampede Subdivision and reaches a junction with SR 10 near Thorp, where it turns north.[11] US 97 continues along a ridge with wind turbines and quarries at the edge of the Kittitas Valley and intersects SR 970 at Virden before entering the Wenatchee National Forest.[20] It then follows Swauk Creek as it ascends into the Wenatchee Mountains (part of the Cascade Range), passing several trailheads, campgrounds, and the former townsite of Liberty.[21]

The highway turns east to reach Blewett Pass, its highest point at 4102feet above sea level, and crosses into Chelan County.[13] It then descends from the pass by following Tronsen and Peshastin creeks north into the Wenatchee Valley. US 97 reaches an interchange with US 2 near Peshastin and turns southeast to form a concurrency. The four-lane divided highway follows the Wenatchee River downstream through Dryden and around Cashmere towards the city of Wenatchee. North of the city, US 2/US 97 passes through interchanges with SR 285, the main connector into downtown Wenatchee, and US 97 Alternate (US 97A) as it turns east to cross the Columbia River on the Richard Odabashian Bridge.

US 2/US 97 enters Douglas County and turns north at a junction with SR 28, which continues through East Wenatchee towards Quincy.[13] The highway follows the east side of the Columbia River, opposite from US 97A on the west side and along Badger Mountain, and passes the Rocky Reach Dam at the head of Lake Entiat and the adjacent Lincoln Rock State Park. US 2 leaves US 97 at a split junction in Orondo that includes a short spur route. The highway continues north and east along the Columbia River, passing Daroga State Park and several apple orchards on the edge of the Waterville Plateau. US 97 crosses the Columbia River on the Beebe Bridge near Chelan Falls and intersects SR 150, which connects to the city of Chelan on Lake Chelan.

The highway re-enters Chelan County and follows the west bank of the Columbia River, merging with US 97A northeast of downtown Chelan. US 97 continues north, passing the Wells Dam at Azwell, and enters Okanogan County near Alta Lake State Park. It then intersects SR 153 before traveling through Pateros at the mouth of the Methow River. The highway continues northeast along the river to Brewster, where it intersects SR 173 before turning east towards Anderson Field. After a junction with SR 17 near the historic site of Fort Okanogan, US 97 turns north to follow the east bank of the Okanogan River in the Colville Indian Reservation. The highway travels along the river as it rounds Soap Lake Mountain, intersecting unsigned SR 213 near Malott, and reaches an intersection with SR 20 on the southern outskirts of Okanogan.

US 97 and SR 20 form a concurrency as they bypass Okanogan and serve the county fairgrounds and 12 Tribes Omak Casino. The highway also bypasses Omak, intersecting SR 155 via its spur route, and crosses the Okanogan River to leave the Colville Indian Reservation. US 97/SR 20 then intersects SR 215, which provides local access through Okanogan and Omak and is co-signed with a business route. The highway continues northeast to rejoin the river, following its west bank until the town of Riverside, where it splits to use Wagonroad Coulee. US 97 crosses the Okanogan River and follows its east bank into Tonasket, where the concurrency ends and SR 20 turns east to cross the Okanogan Highlands. The highway continues north along the river to another crossing near the mouth of the Similkameen River south of Oroville. US 97 travels through Oroville and along the west side of Osoyoos Lake to the 24-hour Oroville–Osoyoos crossing on the Canadian border, where it terminates.[13] Beyond the border, the roadway continues as British Columbia Highway 97, which serves several cities in the British Columbia Interior and later forms part of the Alaska Highway.[22]

History

Late 19th and early 20th centuries

The first segment of US 97 to be included in Washington's state highway system was a roadway extending from Wenatchee to Twisp, although the US 97 segment ended in Pateros, established in 1897.[23] [24] In 1905, another road from Pateros to Okanogan was added to the system,[25] which would be extended to the Canada–US border in 1907. That roadway from Wenatchee to Canada, was named the Wenatchee-Oroville Road and numbered State Road 10. A different road, located along the Oregon state line on the Columbia River, was established as State Road 8, the Columbia River Road and ran north from Maryhill to Goldendale.[26]

Six years later, in 1913, State Road 7 was created on a Virden–Wenatchee route.[23] The Inland Empire Highway was established in 1915 and the section it overlapped with present-day US 97 ran from Buena northwest to Ellensburg.[27] State Road 2 replaced State Road 7 in 1919 and a branch, the Southern Division of the Sunset Highway, was established in 1919 and ran south from State Road 2 at Virden to Ellensburg.[28]

During the early 1920s, a ferry was established over the Columbia River between Biggs Junction, Oregon and Maryhill.[29] State Road 8 between Goldendale and Buena was established in 1923.[30] US 97 was established along with the rest of the U.S. routes in 1926, including US 10 and US 410, which were concurrent with US 97.[2] All state roads became Primary state highways in 1937 and they kept their numbers; a branch of Primary State Highway 8 (PSH 8) was also established, connecting the Maryhill ferry to PSH 8 in Maryhill.[31] Another concurrency was added in 1946, when US 2 was extended west, co-signed with US 97 between Peshastin and Wenatchee.[32] [33]

Late 20th century

On June 29, 1956, President Dwight D. Eisenhower signed the Federal Aid Highway Act of 1956 into law, establishing a system of freeways that would later become the Interstate Highway System.[34] [35] Included in the system were Interstate 82 (I-82) and I-90, which were to be concurrent with US 97.[36] The Biggs Rapids Bridge (later renamed to the Sam Hill Memorial Bridge) was opened on November 1, 1962, replacing the ferry that had been operating on the route since the early 1920s.[29] [37] A new system of highways was introduced in 1964 and ultimately caused US 97 to replace the Primary state highways.[38]

US 410 was replaced by a western extension of US 12 in 1967, when the highway's western terminus was moved to Aberdeen.[39] [40] In 1973, a segment of US 97 between Selah and Ellensburg was realigned east away from the Yakima River and onto I-82, while the former route became SR 821.[41] Between US 97 / US 10, which would later be decommissioned by 1970,[42] near Thorp and US 97 in Virden, there was a SR 131.[43] In 1975, US 97 replaced SR 131 and the old route became SR 10 and SR 970.[44] [45] SR 131 would later be assigned on another route in the Randle area in 1991.[46] Within Selah, US 97 was also moved onto I-82 away from the city, so the old route became SR 823 in 1984.[47] Prior to 1987, US 97 ran on the west side of the Columbia River between Wenatchee and Chelan, while SR 151 ran on the east side.[48] US 97 was moved onto SR 151 in 1987 and the old US 97 became US 97 Alternate.[49]

Early 21st century

Beginning in 2006, the Washington State Department of Transportation (WSDOT) has completed five construction projects on the US 97 corridor, ranging from a bridge deck replacement in Maryhill to repaving the roadway between Oroville area and Canada.[50] Construction on a three-part project to install guardrails on dangerous portions of the highway began on May 16, 2006.[51] The project was finished on August 17, 2006, and improved a 320NaN0 segment near Blewett Pass, a 180NaN0 section in the Colville Indian Reservation and a 202NaN2 segment between Riverside and Oroville.[51] [52]

Prior to October 5, 2006, US 197, an auxiliary route of US 97, ended at US 97, co-signed with SR 14, in Maryhill. On October 5, the American Association of State Highway and Transportation Officials (AASHTO) decommissioned US 197 between Dallesport and Maryhill.[53] Between 29 May and September 28, 2007, WSDOT repaved the roadway between Cordell, located south of Oroville, and the Canada–US border.[54] [55] In July 2008, WSDOT completed installing guardrails on the road in Klickitat County.[56] [57] Between August 11 and December 5, 2008, WSDOT added sidewalks and illumination along a 0.592NaN2 long stretch of the highway between Main Street and SR 173 in Brewster.[58] [59] [60]

Since the opening of the Sam Hill Memorial Bridge in 1962, the bridge has used a lightweight concrete and asphalt bridge deck.[29] [37] Now, the bridge is a heavily used truck route and requires a heavy concrete deck.[29] In late 2006, a replacement project was planned and the estimated $16 million USD cost was split between the governments of Washington and Oregon.[61] The whole bridge was replaced by WSDOT, including the Oregon side.[62] The project was accelerated to Fall 2007,[61] but the bridge wasn't closed until January 2, 2008.[63] [64] During construction on January 15, approximately 8:00 (PST), a worker was seriously injured after an excavator fell into the Columbia River.[65] [66] After the area was cleaned, the project resumed on January 23 and a worker died after falling off the bridge on February 26.[67] [68] By April, half of the new deck was complete and the bridge was reopened on 19 May, at 6:00 pm (PST).[69] [70] Although the bridge was reopened, it was once again closed on September 3 for more repairs.[71] [72] [73] The bridge was reopened on December 24 and all roadwork was completed on March 23, 2009.[74] [75] [76]

Future projects

As of 2009, eight projects on the corridor have not been completed yet and some are currently under construction.[77] Between April 27 and June 30,[78] completed the second phase of emergency flood repairs to US 97 at Blewett Pass because the 5 – January 6 floods washed out the roadway. The third and final phase is set to begin on August 17.[79] [80] The Janis Bridge was first constructed and completed in 1957 and on June 15, 2009, a construction project to the rehabilitate the bridge deck begam. Construction will cease on July 27.[81] [82] On June 22, construction began on a project to install a new traffic signal at the SR 155 intersection in Okanogan, two variable-message signs and two traffic cameras near the Canada–US border.[83] [84] On July 27, WSDOT will start to fix an unstable slope north of Blewett Pass, 8miles south of the US 2 intersection.[85] [86] Another project set to begin on July 27 to fix an unstable slope on US 97 near Blewett Pass.[87] [88] WSDOT will add a passing lane on the highway at Blewett Pass in summer 2010.[89] [90] The bridge over Satus Creek, located within the Yakama Indian Reservation in Klickitat County will be replaced in 2010.[91] [92] A repaving project between Orondo and Chelan Falls has been put on hold until 2016, originally scheduled for 2010.[93] [94]

Special routes

Alternate route

See main article: U.S. Route 97 Alternate.

State:WA
Type:US-Alt2
Route:97
Location:Wenatchee — Chelan
Formed:1987

U.S. Route 97 Alternate (US 97 Alt.) is a 39.352NaN2 long alternate route that extends from the US 97 / US 2 concurrency north of Wenatchee along the west side of the Columbia River to US 97 east of Chelan, completely in Chelan County.[1] The highway begins at a partial cloverleaf interchange with US 97 / US 2 north of Wenatchee and west of the Richard Odabashian Bridge over the Columbia River.[95] After leaving the interchange, the roadway parallels the eastern boundary of the Wenatchee National Forest to cross the Entiat River and pass Entiat before intersecting SR 971 twice, the second time being on the southern shores of Lake Chelan. The road continues east across the Chelan River into Chelan as various streets, such as Woodin Avenue, Webster Avenue and Saunders Street before intersecting SR 150, leaving Chelan, passing Lake Chelan Airport and ending at US 97. In 1897, US 97 Alternate was a part of a Wenatchee–Twisp highway.[24] That highway became a part of US 97 in 1926 and later US 97 Alternate in 1987 when US 97 was moved east of the river over SR 151.[2] [48] [49] The busiest section of US 97 Alternate in 2007 was north of the US 97 / US 2 interchange, with a daily average of 9,700 motorists.[6]

Orondo spur

State:WA
Type:US-Spur
Route:97
Location:Orondo

U.S. Route 97 Spur (US 97 Spur) is a 0.262NaN2 long spur route that connects US 97 north of the terminus of the US 2 concurrency to US 2 east of the end of the concurrency, completely located in Orondo, a community in Douglas County.[1] The busiest section of US 97 Spur in 2007 was at the US 97 intersection, with a daily average of 250 motorists.[6]

External links

Notes and References

  1. Web site: State Highway Log: Planning Report, SR 2 to SR 971 . . 2006 . July 4, 2009 . dead . https://web.archive.org/web/20080410164014/http://www.wsdot.wa.gov/mapsdata/TDO/PDF_and_ZIP_Files/HwyLog2006.pdf . April 10, 2008 . mdy-all .
  2. . . November 11, 1926 . United States System of Highways Adopted for Uniform Marking by the American Association of State Highway Officials . 1:7,000,000 . Washington, DC . . 32889555 . November 7, 2013 . . amp.
  3. Washington State Department of Transportation . 2008 . 2008–09 . Washington State Highways, 2008–2009 . F8 . . 1:842,000 . July 5, 2009.
  4. Web site: The National Highway System . . August 27, 2008 . July 1, 2009.
  5. . National Highway System: Washington . 2004 . July 1, 2009.
  6. Web site: 2007 Annual Traffic Report . Washington State Department of Transportation . 2007 . July 8, 2009 . dead . https://web.archive.org/web/20090326014935/http://www.wsdot.wa.gov/mapsdata/tdo/PDF_and_ZIP_Files/Annual_Traffic_Report_2007.pdf . March 26, 2009 . mdy-all .
  7. Web site: Annual Traffic Report, 1970 . Washington State Department of Transportation . . 1970 . July 8, 2009 . dead . https://web.archive.org/web/20080625093148/http://www.wsdot.wa.gov/mapsdata/tdo/PDF_and_ZIP_Files/1970_ATR.pdf . June 25, 2008 . mdy-all .
  8. Web site: February 19, 2020 . Resolution No. 738 . . August 16, 2023.
  9. Web site: April 20, 2022 . Resolution No. 745 . Washington State Transportation Commission . August 16, 2023.
  10. Washington State Rail System . 2008 . Washington State Department of Transportation . United States Geological Survey . July 4, 2009.
  11. September 1, 2011 . BNSF Subdivisions . . December 18, 2021.
  12. News: Hewitt . Scott . September 22, 2021 . Columbia River Gorge Stonehenge added to National Register of Historic Places . . December 18, 2021.
  13. 2014 . December 18, 2021.
  14. Web site: September 17, 2004 . SR 14: Junction SR 14 Couplet/SR 97/SR 97 Couplet . Interchange Viewer . Washington State Department of Transportation . July 4, 2009.
  15. News: Richard . Terry . January 1, 2011 . 3 inches of fresh snow makes magic on Maryhill Loops Road . . December 18, 2021.
  16. News: Durbin . Kathie . October 11, 2010 . Wind farms growing along Columbia River Gorge . . dead . https://web.archive.org/web/20101015235118/http://seattletimes.nwsource.com/html/localnews/2013131234_apwacolumbiagorgewindfarms1stldwritethru.html . October 15, 2010 . December 18, 2021.
  17. Book: Mueller . Marge . Mueller . Ted . 2004 . Washington State Parks: A Complete Recreation Guide . 3rd . 231–233, 293–294 . . 0-89886-893-9 . 55800990 . . December 18, 2021.
  18. News: November 4, 2006 . Nuns live life of seclusion in remote Washington monastery . . . December 18, 2021.
  19. News: Meyers . Donald W. . May 5, 2017 . It Happened Here: Interstate 82 bridge named for local road builder . . December 18, 2021.
  20. News: Johnston . Mike . April 6, 2011 . At Kittitas Valley project, turbines don't always turn . . December 18, 2021.
  21. News: Jackson . Kristin . October 18, 1994 . Traveling smart—Close to home—Blewett Pass Highway: Sidetrip into a slower era . The Seattle Times . December 18, 2021.
  22. Web site: October 2003 . Transportation Concept Report: U.S. Route 97 . 6 . . dead . https://web.archive.org/web/20100202142603/http://www.dot.ca.gov/dist2/planning/pdf/sis97tcr.pdf . February 2, 2010 . December 18, 2021.
  23. Washington State Department of Transportation . State Roads As Established by Legislature, 1893 to 1935 . 1893–1935 . July 7, 2009 . dead . https://web.archive.org/web/20051106090227/http://www.wsdot.wa.gov/research/History/stateroads1893-1935.pdf . November 6, 2005 .
  24. Book: Washington State Legislature . Session Laws of the State of Washington . July 7, 2009 . 1897 . March 18, 1897 . Washington State Legislature . . 481 . Chapter 115.
  25. Book: Washington State Legislature . Session Laws of the State of Washington . July 7, 2009 . 1905 . March 13, 1905 . Washington State Legislature . Olympia, Washington . 355 . Chapter 174.
  26. Book: Washington State Legislature . Session Laws of the State of Washington . July 7, 2009 . 1907 . March 13, 1907 . Washington State Legislature . Olympia, Washington . 310–311 . Chapter 151: Providing for the Establishment, Construction and Maintenance of State Roads and Making Appropriations For Certain State Roads.
  27. Book: Washington State Legislature . Session Laws of the State of Washington . July 7, 2009 . 1915 . March 19, 1915 . Washington State Legislature . Olympia, Washington . 485 . Chapter 164: Classification of Public Highways.
  28. Book: Washington State Legislature . Session Laws of the State of Washington . July 7, 2009 . 1919 . March 14, 1919 . Washington State Legislature . Olympia, Washington . 267 . Chapter 110.
  29. Web site: . Biggs Rapids/Sam Hill Memorial Bridge, spanning the Columbia at Maryhill, opens on November 1, 1962. . Priscilla Long . June 11, 2006 . July 7, 2009.
  30. Book: Washington State Legislature . Session Laws of the State of Washington . July 7, 2009 . 1923 . March 19, 1923 . Olympia, Washington . 628–630 . Chapter 185: Primary and Secondary Highways.
  31. Book: Washington State Legislature . Session Laws of the State of Washington . July 7, 2009 . 1937 . March 17, 1937 . Washington State Legislature . Olympia, Washington . 934–935; 937–939 . Chapter 190: Establishment of Primary State Highways.
  32. . Northwest, 1946 . 1946 . 16 . July 7, 2009.
  33. Web site: U.S. 2: Houlton, Maine, to Everett, Washington . Richard F. Weingroff . United States Department of Transportation, Federal Highway Administration . January 30, 2008 . July 7, 2009.
  34. Web site: The Greatest Decade 1956-1966, Celebrating the 50TH Anniversary of the Eisenhower Interstate System; Part 1: Essential to the National Interest . Richard F. Weingroff . United States Department of Transportation, Federal Highway Administration . December 22, 2008 . July 8, 2009.
  35. Weingroff . Richard F. . January–February 2006 . The Year of the Interstate . Public Roads . 69 . 4 . United States Department of Transportation, Federal Highway Administration . July 8, 2009.
  36. The National System of Interstate and Defense Highways . October 1, 1970 . United States Department of Transportation, Federal Highway Administration . July 8, 2009.
  37. Book: Holstine, Craig E. . Spanning Washington: Historic Highway Bridges of the Evergreen State . Washington State University Press . 107–108 . 2005 . 0-87422-281-8 .
  38. Web site: Identification of State Highways . C. G. Prahl . Washington State Highway Commission, Department of Highways . December 1, 1965 . July 8, 2009.
  39. News: . Highway 410 is now U.S. No. 12 . December 28, 1967 . 1 .
  40. Web site: U.S. 12 Michigan to Washington . Richard F. Weingroff . United States Department of Transportation, Federal Highway Administration . May 7, 2005 . July 8, 2009.
  41. Web site: RCW 47.17.823: State route No. 821 . 1973 . Washington State Legislature . July 8, 2009.
  42. Web site: RCW 47.17.045: State route No. 10 . 1970 . Washington State Legislature . July 9, 2009.
  43. . Wenatchee, 1971 . 1:250,000 . United States Geological Survey . 1971 . July 9, 2009.
  44. Web site: RCW 47.17.917: State route No. 970 . 1975 . Washington State Legislature . July 9, 2009.
  45. News: July 1975 . Former State Highway 131 Designated As "New" U.S. 97 . 6 . Interchange . Washington State Department of Highways . WSDOT Library Digital Collections . December 2, 2022.
  46. Web site: Chapter 342, Laws of 1991: State Highway Routes — Revisions To (House Bill 5801) . 1991 . . . July 4, 2009 . dead . https://archive.today/20120804092641/http://www.leg.wa.gov/pub/billinfo/1991-92/Htm/Bills/Session%20Law%201991/5801.SL.htm . August 4, 2012 . mdy-all .
  47. Web site: RCW 47.17.824: State route No. 823 . 1984 . Washington State Legislature . July 8, 2009.
  48. Web site: RCW 47.17.290: State route No. 151 . 1970 . 1987 . repealed . Washington State Legislature . July 8, 2009.
  49. Web site: RCW 47.17.157: State route No. 97–alternate . 1987 . Washington State Legislature . July 8, 2009.
  50. Web site: Agency Projects: Completed Projects for US 97 . 2009 . Washington State Department of Transportation . July 9, 2009.
  51. Web site: Washington State Department of Transportation . US 97 – NCR Roadside Safety – Complete August 2006 . 2006 . July 9, 2009 . dead . https://web.archive.org/web/20080907025822/http://www.wsdot.wa.gov/Projects/US97/NCRRoadsideSafety/ . September 7, 2008 .
  52. Washington State Department of Transportation . US 97 – Kittitas, Chelan, and Okanogan Counties Roadside Safety Improvement . 2005 . . July 9, 2009.
  53. Web site: . An Application from the State Highway or Transportation Department of Washington for US 197 . October 5, 2006 . July 9, 2009.
  54. Web site: Washington State Department of Transportation . US 97 – Oroville Vincity – Paving – Complete September 2007 . 2007 . July 9, 2009.
  55. Washington State Department of Transportation . US 97 – Oroville Vincity Paving . 2005 . Tele Atlas . July 9, 2009.
  56. Web site: Washington State Department of Transportation . US 97 – Klickitat County – Roadside Safety – Complete July 2008 . 2008 . July 9, 2009.
  57. Washington State Department of Transportation . US 97 Klickitat County – Roadside Safety . 2008 . July 9, 2009.
  58. Web site: Washington State Department of Transportation . US 97 – Brewster – Pedestrian Illumination – Complete December 2008 . 2008 . July 9, 2009.
  59. Washington State Department of Transportation . US 97 Brewster Pedestrian Illumination . 2008 . July 9, 2009.
  60. News: Cheryl . Schweizer . Sidewalks next step in Highway 97 construction . . . September 11, 2008 . July 9, 2009.
  61. Web site: Washington State Department of Transportation . US 97 – Biggs Rapids – Sam Hill Bridge Deck Replacement – Complete March 2009 . 2009 . July 14, 2009.
  62. Washington State Department of Transportation . US 97 – Biggs Rapids–Sam Hill Bridge Deck Replacement – Project Area . 2009 . July 14, 2009.
  63. News: Chris . Tams . Bateman, Alissa . WSDOT Postpones Biggs Bridge Closure until Early '08 . Washington State Department of Transportation . . July 18, 2007 . July 14, 2009 . dead . https://web.archive.org/web/20081225115624/http://www.wsdot.wa.gov/News/2007/07/18_US97BiggsClosure.htm . December 25, 2008 .
  64. News: Chris . Tams . Bateman, Alissa . US 97, Biggs Bridge Project Begins in December, Complete Closure Begins January 2 . Washington State Department of Transportation . Goldendale, Washington . November 8, 2007 . July 14, 2009 . dead . https://web.archive.org/web/20081225115629/http://www.wsdot.wa.gov/News/2007/11/08_US97Biggs.htm . December 25, 2008 .
  65. News: Worker seriously injured when excavator plunges off Biggs Rapids Bridge into the Columbia . . . January 15, 2008 . July 14, 2009.
  66. News: Sylvia . Ross . Redfield, Joye . Mowat Construction . Fisher, Elaine . Clean Up Efforts, Investigation Continues after Biggs Bridge Work Zone Accident . Washington State Department of Transportation . Goldendale, Washington . January 16, 2008 . July 14, 2009.
  67. News: Chris . Tams . Ross, Sylvia . Construction on Biggs Bridge Resumes January 23 . Washington State Department of Transportation . Goldendale, Washington . January 23, 2008 . July 14, 2009.
  68. News: Mike . Morey . Worker dies in fall from US Highway 97 bridge . . . March 3, 2008 . July 14, 2009.
  69. News: Chris . Tams . Wright, Jermey . Important Mileston Reached on US 97 – Biggs Bridge Project . Washington State Department of Transportation . Goldendale, Washington . April 2, 2008 . July 14, 2009.
  70. News: Chris . Tams . Wright, Jermey . Sam Hill – Biggs Rapids Bridge to Re-Open Today, May 19, at 6 p.m. . Washington State Department of Transportation . Goldendale, Washington . May 19, 2008 . July 14, 2009.
  71. News: Chris . Tams . Russell, Abbi . Night time lane closures begin next week for US 97, Biggs Bridge project, complete closure begins September 3 . Washington State Department of Transportation . Goldendale, Washington . August 13, 2008 . July 14, 2009.
  72. News: Chris . Tams . Ross, Sylvia . US 97, Biggs Rapids – Sam Hill Bridge closes September 8 for final stage of construction . Washington State Department of Transportation . Goldendale, Washington . August 25, 2008 . July 14, 2009.
  73. News: Chris . Tams . Russell, Abbi . WSDOT reminds drivers of US 97, Biggs Rapids – Sam Hill Bridge closure September 8 . Washington State Department of Transportation . Goldendale, Washington . September 2, 2008 . July 14, 2009.
  74. News: Chris . Tams . Russell, Abbi . WSDOT reopens the Biggs Rapids–Sam Hill Bridge in time for the holidays . Washington State Department of Transportation . Goldendale, Washington . December 19, 2008 . July 14, 2009.
  75. News: Chris . Tams . Russell, Abbi . WSDOT opens Biggs Rapids–Sam Hill Bridge at 4 p.m. today . Washington State Department of Transportation . Goldendale, Washington . December 24, 2008 . July 14, 2009.
  76. News: Chris . Tams . Russell, Abbi . Biggs Rapids–Sam Hill deck replacement project wraps up early . Washington State Department of Transportation . Goldendale, Washington . March 23, 2009 . July 14, 2009.
  77. Web site: Agency Projects: Highway, Ferry and Rail Construction and Improvement Projects for US 97 . 2009 . Washington State Department of Transportation . July 14, 2009.
  78. News: Jeff . Adamson . Andreini, Mike . WSDOT awards US 97 Blewett Pass emergency flood repair contract . Washington State Department of Transportation . April 10, 2009 . . July 14, 2009.
  79. Web site: Washington State Department of Transportation . US 97 – Blewett Pass Emergency Flood Repair Stages 2 – 3 . 2009 . July 14, 2009.
  80. Washington State Department of Transportation . Blewett Pass Emergency Flood Repair Stage 2 . 2009 . July 14, 2009.
  81. Web site: Washington State Department of Transportation . US 97 – South of Tonasket – Bridge Deck Repair . 2009 . July 14, 2009.
  82. Washington State Department of Transportation . US 97 – South of Tonasket – Bridge Deck Repair . Tele Atlas . 2009 . July 14, 2009.
  83. Web site: Washington State Department of Transportation . US 97 – SR 155 Intersection and Border Vincity Improvements . 2009 . July 14, 2009.
  84. Washington State Department of Transportation . US 97 Intersection Safety Improvements . 2009 . Tele Atlas . July 14, 2009.
  85. Web site: Washington State Department of Transportation . US 97 – Eight miles south of US 2 Intersection – Unstable Slope . 2009 . July 14, 2009.
  86. Washington State Department of Transportation . US 97 8 Miles South of US 2 Intersection – Unstable Slope . 2007 . Tele Atlas . July 14, 2009.
  87. Web site: Washington State Department of Transportation . US 97 – North of Blewett Pass – Unstable Slope . 2009 . July 14, 2009.
  88. Washington State Department of Transportation . US 97 North of Blewett Pass – Unstable Slope . 2007 . Tele Atlas . July 14, 2009.
  89. Web site: Washington State Department of Transportation . US 97 – Blewett Pass – Passing Lane . 2009 . July 14, 2009.
  90. Washington State Department of Transportation . US 97 Blewett Passing Lane Map . 2009 . July 14, 2009.
  91. Web site: Washington State Department of Transportation . US 97 – Satus Creek Bridge – Bridge Replacement . 2009 . July 14, 2009.
  92. Washington State Department of Transportation . US 97 – Satus Creek Bridge – Bridge Replacement . 2009 . July 14, 2009.
  93. Web site: Washington State Department of Transportation . US 97 – Orondo Northward Paving . 2009 . July 14, 2009.
  94. Washington State Department of Transportation . US 97 – Orondo Northward Paving . 2009 . July 14, 2009.
  95. Web site: SR 2 / SR 97; Junction SR 97 Alternate Route (AR) . April 10, 2005 . Washington State Department of Transportation . July 5, 2009.