The Twenty-eight by '28 initiative is an effort set forth by former Mayor Eric Garcetti that the City of Los Angeles complete 28 transportation infrastructure projects before the start of the 2028 Summer Olympics on and the 2028 Summer Paralympics the following month.
Most of the projects on the original list are funded through Measure R and Measure M and will receive accelerated priority, though several more were proposed by this plan.[1] In December 2018, the Los Angeles County Metropolitan Transportation Authority stated it would need $26.2 billion to complete the list of projects.[2]
In March 2024, the Metro Board substituted 11 projects that could not be implemented in time for the 2028 Olympic and Paralympic Games with 11 projects that would be able to hit this deadline and are in line with the agency's 2028 Mobility Concept Plan.[3]
Under construction | |
Operational | |
No. | Project | Completion |
---|---|---|
1 | “New Blue” Improvements to the A Line[4] [5] | 2019 |
2 | Silver Line (J Line) Improvement Program[6] [7] | 2020 |
3 | Crenshaw/LAX Line Transit Project | 2022[8] |
4 | Regional Connector | 2023[9] |
5 | Eastside Access Improvements[10] [11] | 2023 |
6 | Airport Metro Connector station | 2024[12] |
7 | J Line Electrification[13] | 2025[14] |
8 | Rail to Rail, Segment A[15] | 2025[16] |
9 | North San Fernando Valley Transit Corridor[17] | 2025[18] |
10 | Purple (D Line) Extension Transit Project Section 1 | 2025[19] |
11 | Gold Line (A Line) Foothill Extension to Pomona | 2025[20] |
12 | Purple (D Line) Extension Transit Project Section 2 | 2026[21] |
13 | Rosecrans/Marquardt Grade Separation[22] | 2025 |
14 | New Bus Corridors | 2026 |
15 | Interstate 5 North Capacity Enhancements, SR 14 Interchange in Santa Clarita to Parker Rd in Castaic | 2026 |
16 | Key Downtown Los Angeles Stations[23] [24] | 2026 |
17 | North Hollywood to Pasadena Bus Rapid Transit | 2027 |
18 | Los Angeles River bicycle path and Mobility Hub – San Fernando Valley | 2027 |
19 | G Line Travel Time and Safety Improvements[25] | 2027 |
20 | Purple (D Line) Extension Transit Project Section 3 | 2027[26] |
21 | Mobility Hubs in San Fernando Valley[27] [28] | 2027 |
22 | Gateway Cities Mobility Concept Plan Projects[29] [30] | 2027 |
23 | LRT Speed & Reliability Improvements, near Washington/Flower[31] | 2027 |
24 | Bus Only Lanes (Olympic/Venice)[32] | 2027 |
25 | Interstate 105 ExpressLanes Segment 1 | 2028 |
26 | State Route 57/60 Interchange Improvements | 2028 |
27 | Vermont Transit Corridor Bus Rapid Transit | 2028 |
28 | Interstate 405 Integrated Corridor Management, between Manchester Ave. and Rosecrans Blvd | 2028 |
The following 11 projects were included in the original 2018 project list but were substituted in March 2024 with 11 operational/in-progress projects that would better meet the 2028 Olympic and Paralympic Games deadline.
No. | Project |
---|---|
2 | Microtransit[33] |
11 | Los Angeles River Waterway & System Bike Path |
16 | Sepulveda Pass Metro ExpressLanes |
17 | East San Fernando Valley Light Rail Transit Project[34] |
19 | Interstate 710 South Corridor Early Action[35] |
20 | C Line (Green) Extension to Torrance Transit Project |
21 | A Line Signal and Washington/Flower Junction Improvements[36] |
22 | Interstate 10 ExpressLanes (Interstate 605 to the San Bernardino Line) |
25 | Sepulveda Transit Corridor Project[37] |
26 | Eastside Transit Corridor Phase 2 |
27 | Southeast Gateway Line |