TriMet rolling stock explained

The TriMet transit system, serving the Portland metropolitan area in Oregon, owns and operates two different rail transit systems: a light rail system known as MAX, and a commuter rail system known as WES. The fleet of 145 MAX electric light rail vehicles (LRVs) includes five different models, designated by TriMet as "Type 1" through "Type 6". All types are used on all of the MAX lines, but the Type 6 carswhich will gradually replace the Type 1 carsare still being delivered and have not yet begun to enter service. The comparatively very small WES fleet includes three different types of diesel commuter rail cars.

Light rail fleet

ImageDesignationCar numbersManufacturerModelFirst usedNo. of seats/overall capacityQuantityNotes
Type 1101–126Bombardier198676/166[1] 26(retiring)Units are slowly retiring from fleet. 106 was retired as a parts train. 102, 103, and 116 are in the original paint scheme and never overhauled. Most are in the new paint scheme.
Type 2201–252SiemensSD660199764/16652Most LRVs are getting a new paint scheme wrap. 216 was wrecked and retired. 215, 231, and 241 were overhauled.
Type 3301–327200364/16627Most LRVs are getting new paint scheme wraps. 315 was overhauled.
Type 4401–422S70200968/17222404, 408, 412, and 418 were repainted into the new paint scheme.
Type 5521–538S700201572/18618
Type 6601–630S70062/168[2] 30These units will run into service in late 2024 after final testing. First LRV, 601, was delivered December 2022.

Notes on capacities:

Type 1

The Type 1 cars were manufactured by a joint venture between Bombardier Corporation and La Brugeoise et Nivelles (BN; Bombardier would later acquire the company) and featured a raised floor with steps at the doors. TriMet had wanted to contract American firm Budd Corporation, but the company backed out at the last minute.[4] TriMet announced it would purchase an additional seven vehicles in August 1983,[5] but a budget shortfall forced the agency to withdraw this proposal the following November.[6] The cars were built, with some modifications for Portland, to a BN design that had previously been usedunder license by Brazilian manufacturer Cobrasma(PT)for 68 rail cars for Rio de Janeiro.[7] The electrical propulsion equipment was supplied by Brown, Boveri & Company.[8] [9] Bombardier built the frames in Quebec, but its factory in Barre, Vermont, manufactured the majority of each car, with 80 percent of the production and assembly taking place in Barre. The first vehicle was completed at the factory in late 1983 and arrived in Portland in 1984.[10] The Type 1 cars are the only light rail cars in TriMet's fleet that lack regenerative braking capability.[11]

The Type 1 cars were delivered without air-conditioning, but it was added to all cars during a retrofit in 1997–98.[12] [13] These cars were originally equipped with stop-request bell cords (as are commonly found on American transit buses), which passengers needed to pull to signal the operator that they wanted to get off at the next stop, similar to a typical bus or some streetcars. As ridership increased, the stop request feature was relegated to certain lighter used stations during periods of lighter traffic. Finally, in 1994, the bell cords were removed after TriMet adopted an operating practice of having MAX trains stop at every station at all times.[14] The bodies of the Type 1 vehicles include cutaway areas by each truck, for maintenance access. In 1995, TriMet began installing wheel skirts to cover these, to reduce noise, and said that these would be included on all LRVs purchased in the future.[15]

For their first 30 years (until 2016) the Type 1 cars had roll-type, printed destination signs. The Type 1 cars were the only MAX cars whose rollsigns were hand-cranked. Because of the time-consuming process to change the signs, only the sign on the exposed end of the car in a two-car train was changed to the correct destination. The side signs only listed the designated route color (such as "Blue Line") rather than a destination, and the sign on the coupled end of each car in a two-car train was left blank. A two-year program that began in October 2014[16] and was completed in September 2016 gradually replaced all of the rollsigns in the Type 1 cars (as well as those in the Types 2 and 3) with digital, LED-type destination signs.[17]

Starting in 2003, TriMet began a program to refurbish the bodies of the Type 1 cars, carried out by its own employees. Known as the Body Overhaul program,[18] it included extensive body renovation, replacement of all windows, repainting into the new paint scheme the agency adopted in 2002, and minor interior refurbishment, but not any work on the cars' mechanical or propulsion equipment.[19] The program proceeded at a slower pace than originally anticipated because of staffing issues,[20] with only two cars being worked on at a time, and each taking one to two years. By 2018, when only 23 of the 26 cars had been completed, TriMet had terminated the program because, by that time, the Type 1 fleet was only a few years away from retirement. The last overhauled car, No. 112, returned to service in April 2018. The three cars that never received the body overhaul and repainting were Nos. 102, 103 and 116.

In February 2018, TriMet announced its intention to purchase replacements for all 26 Type 1 cars.[21] In July 2019, TriMet did place such an order, for 26 new cars which it has designated Type 6 (see below).

Retirement began in October 2023, when car 102, one of the three which was never refurbished, was retired following the delivery of the first several new Type 6 cars.[22]

Type 2

With the partial opening of Westside MAX in 1997, TriMet's "Type 2" light rail vehicles were introduced. The Siemens model SD660 (originally SD600, but retroactively redesignated SD660 in 1998[23]) have a low-floor design, a first for light rail vehicles in North America,[24] [25] digital reader boards and a slightly more open floor plan. The floor is nearly level with the platforms, and small ramps called "bridge plates" extend (on request) from two of the four doors, enabling passengers in wheelchairs to roll on and off of the vehicle easily. These permitted the elimination of wheelchair lifts that had been located at every station and were time-consuming to use.[26] High-floor Type 1 cars are now always paired with a low-floor Type 2 or 3 car so that each train is wheelchair-accessible.

The first low-floor light rail vehicle was delivered in 1996[27] and first used in service on August 31, 1997. The new vehicles also came equipped with air-conditioning, a feature originally lacking from the Type 1 vehicles. The initial order of 39 Type 2 vehicles was expanded, in stages, to a total of 52 vehicles.[28]

Some of the later models of light rail vehicles had automatic passenger counters retrofitted; in these models, they are on the floor of the doorways.

In 2001–02, TriMet modified the interior of the Type 2 cars to add space for bicycles. Eight seats per vehicle were removed and replaced—in four places per car—with hooks from which a bicycle can be hung.[29] All later cars have been delivered from the manufacturer with these bike hooks already installed. In 2014–2016, the rollsign-type destination signs in these cars and the almost-identical Type 3 cars were gradually replaced with digital signs in a two-year conversion program.

Type 3

The second series of Siemens SD660 cars, TriMet's "Type 3" MAX light rail vehicle, are outwardly identical to the Type 2 cars in design, the primary difference being various technical upgrades. Siemens installed an improved air-conditioning system, more ergonomic seats and automatic passenger counters using photoelectric sensors above the doorways. The Type 3 cars were the first to wear the transit agency's newer (2002-adopted) paint scheme. Purchased for the opening of the Yellow Line in May 2004, delivery of the Type 3 series began in February 2003, and the vehicles began to enter service in September 2003.[30]

Type 4

Twenty-two new Siemens S70 low-floor cars, designated Type 4, were purchased in conjunction with the I-205 and Portland Mall MAX projects. They feature a more streamlined design than previous models, have more seating and are lighter in weight and therefore more energy-efficient. They can only operate in pairs, since each car has just one operator's cab, at the "A" end (the "B" end has additional passenger seating). At about 95feet long, they are about three feet longer than Type 2 and Type 3 cars, which were 92feet.[31] The Type 4 MAX cars began to enter service in August 2009.[32]

The Type 4 cars were the first to use LED-type destination signs. On the rollsign-type destination signs useduntil 2016on the Type 1, 2 and 3 cars the designated route color (blue, green, red, or yellow) was shown as a colored background under white or black text, while in the LED signs the route color is indicated by a colored square at the left end of the display, and all text is orange lettering against a black background.[33] In October 2014, TriMet began a two-year program to gradually replace all rollsigns in its MAX fleet with LED signs, affecting a total of 105 cars (and four signs per car). The conversion program was completed in September 2016 (with the last use of a rollsign in service being on August 19).

Type 5

The second series of Siemens S70 cars, TriMet's "Type 5" MAX vehicle, were purchased in conjunction with the Portland–Milwaukie (MAX Orange Line) project, but are used on all lines in the system. These vehicles include some improvements over the Type 4 cars, including a less-cramped interior seating layout[34] and improvements to the air-conditioning system and wheelchair ramps.[35] TriMet placed the order for the Type 5 cars with Siemens in April 2012 and they began to be delivered in September 2014. The first two cars entered service on April 27, 2015,[36] and all but the last two had entered service by the time the Orange Line opened in September 2015.[37] The fleet numbers for the Type 5 cars are 521–538[38] (at the time the first cars were built, fleet numbers 511–514 were in use for the Vintage Trolley cars). In 2020, Siemens retroactively rebranded TriMet's Type 5 cars as model S700 instead of S70.

Type 6 (on order)

Ordered in 2019 as replacements for the Type 1 cars, TriMet's Type 6 are Siemens model S700[39] (the S700 is a 2019 redesignation by Siemens of the version of its S70 model that resulted from a 2013 redesign of the center truck, of which TriMet's Type 5 cars were the first built by Siemens).[40] The initial order, finalized in July 2019, was for 26 cars, but the contract includes options for additional cars, for service expansion and the proposed Southwest Corridor MAX line, if built.[41] Although identical to the Type 5 cars in most respects, the Type 6 has several new additions, including operating cabs at both ends, improved next-station displays, and extra LEDs to indicate usable doors.[42] Type 6 cars also feature a new paint scheme that TriMet introduced on its bus fleet in early 2019: overall blue with orange stripes. The first car was expected to arrive around spring 2022 and the last of the initial 26 in mid-2023.[43] The order was increased to 30 cars in June 2021.[44] Car 601 arrived at Ruby Junction Yard in December 2022,[45] followed by 604 in March 2023.[46] All Type 6 cars will go under a 1500-mile "burn-in" testing on the system (the first two cars to undergo this testing, nos. 603 and 605, will be tested for 5,000 miles) before entering service, which is forecast for summer 2024.[47]

A Type 6 car was first shown to the public at a "Sneak Peek" event held on October 15, 2023, at the SE Park Ave MAX station.[48]

Ice-cutting pantographs

After a January 2004 Portland-area snow and ice storm that shut down the entire two-line MAX system for a day and a half,[49] TriMet decided to install second, ice-cutting pantographs on some Type 1 light rail vehicles, which it would run (empty) all night under certain weather conditions, to prevent ice from building up on the overhead lines.[50] Unlike the regular pantographs, these "ice cutters" do not draw power from the overhead wire, but instead are fitted with a head designed to scrape ice off of the wire. Six cars (Nos. 107–112) were equipped in 2006, and a seventh (113) in early 2018. In early 2019, TriMet installed ice-cutting pantographs on all 18 of its Type 5 cars.[51] On the Type 5 cars, the ice-cutting pantographs are located near the outer end of each car, near the operating cab. The 26 Type 6 cars that were ordered in 2019 and are in the process of being delivered in 2023–2024 are also equipped with second pantographs for ice cutting.

Mid-life overhaul of Type 2/Type 3 cars

In March 2019, after a competitive bidding process, TriMet signed an $88.3-million contract with Siemens Mobility to carry out a heavy "mid-life overhaul" of all 79 of its Siemens SD660 LRVs (52 TriMet Type 2 and 27 TriMet Type 3), over a period of seven years, to extend their lives.[52] [53] The contract covered options for potential additional work, to be approved or declined by TriMet at its discretion, which would increase the total value to $105.6 million if all options are chosen.[52] [54] The work is taking place at one of two large Siemens plants in the Sacramento metropolitan area.[55] (Siemens was also the manufacturer of these LRVs.) However, amid the COVID-19 pandemic and supply-chain disruptions, the work has proceeded more slowly than originally expected, and as of December 2023 only two LRVs had returned from Sacramento after being overhauled and only two other cars had been sent to Sacramento for the overhaul[56] (the latter being cars 231 and 241 in summer 2022).[57]

One car of each type was chosen to be a prototype for the work, because the work on the Type 2 vehicles, which are older, will be slightly more extensive.[55] Cars 315 and 215 were sent to Siemens in April and September 2019, respectively. The 77 subsequent overhauls were originally planned to be carried out in the Portland metropolitan area, at former United Streetcar facilities owned by Oregon Iron Works, but those plans were later dropped, and all 79 overhauls are to be carried out at Siemens's own facilities in Sacramento.[53] [55] The first overhauled LRV, car 315, returned to TriMet in December 2019[55] and, after extensive testing and evaluation, returned to service in July 2021.[58] Car 215, the second (and first Type 2) to be overhauled, did not return from Sacramento until October 2023, the work having been delayed by the COVID-19 pandemic, among other factors.[56] [59] The work includes repainting into TriMet's 2019-introduced paint scheme of blue with orange stripes, and car 315 was the first MAX car of any series to receive that livery.[60] However, with the overhaul program years behind schedule, TriMet decided to speed up the application of the newer paint scheme via a temporary vinyl "wrap" given to Type 2 and Type 3 LRVs starting in March 2024.[61]

Commuter rail fleet

See main article: WES Commuter Rail. The commuter rail line between Beaverton and Wilsonville is operated primarily with trains made up from a fleet of four Colorado Railcar Aero diesel multiple unit (DMU) railcars. Of these, three are self-propelled and the fourth is an unpowered trailer car with operating cab. TriMet also owns four Budd RDC DMU railcars, of which two have entered service and are used as a backup.

See also

Notes and References

  1. News: . 'Roomy, good-looking' light-rail cars please Tri-Met official . The Sunday Oregonian . November 27, 1983 . B5.
  2. Web site: Meet the New MAX . 2023-01-15 . trimet.org . en-US.
  3. Web site: Glossary section, Transit Capacity and Quality of Service Manual, 2nd Edition (TCRP Report 100). PDF. October 2003. page "8–9" ("car weight designations"). Transportation Research Board. May 17, 2022. https://web.archive.org/web/20070112191754/http://onlinepubs.trb.org/Onlinepubs/tcrp/tcrp100/part%208.pdf. January 12, 2007. dead.
  4. News: Federman . Stan . Banfield officials cite foreign expertise in light-rail contracts . The Oregonian . September 12, 1982 . B7.
  5. News: . Tri-Met plans more cars; $1.5 million savings to be spent . The Oregonian . August 11, 1983 . B8.
  6. News: Federman . Stan . Tri-Met abandons plans to buy more rail cars . The Oregonian . November 4, 1983 . C6.
  7. News: Fletcher. K. P.. Bombardier builds for Portland. Modern Tramway and Light Rail Transit. Ian Allan Publishing/Light Rail Transit Association. UK. May 1985. 150. 0144-1655.
  8. Book: Bushell . Chris . Stonham . Peter . Jane's Urban Transport Systems 1988 . 1988 . 275 . . Coulsdon, Surrey, UK . 0-7106-0854-3.
  9. Book: Wilkins, Van . 1994 . Light Rail Vehicles Now Operating or on Order in North America—1994 . 1994 Light Rail Annual & User's Guide . 47 . Pasadena, CA . . 0160-6913.
  10. News: . First car for light rail delivered . April 11, 1984 . The Oregonian . C4.
  11. Web site: One Breakpoint is Enough: Traction Power Simulation in Portland. Transportation Research Board. November 2003. PDF. May 1, 2010.
  12. Systems News . November 1998 . . 436 . UK . . 1460-8324.
  13. News: Hamilton . Don . Tri-Met gets ready, set for Westside MAX start-up . The Oregonian . June 25, 1998 . Metro West Neighbors section, pp. 1, 7.
  14. News: World News [regular news section] . . . . December 1994 . 331 . 0964-9255.
  15. News: World News Review [regular news section] . . . . December 1995 . 424 . 0964-9255.
  16. Tramways & Urban Transit magazine, March 2015, p. 121. UK: LRTA Publishing.
  17. Tramways & Urban Transit magazine, November 2016, p. 440. UK: LRTA Publishing.
  18. News: . Portland plans to order up to 66 new LRVs – and to refurbish 79 more . October 2018 . . 364 . UK . Mainspring Enterprises Ltd. 1460-8324.
  19. News: . Worldwide Review [regular news section] . July 2009 . . 270 . UK . . 1460-8324.
  20. News: . Systems News [regular news section] . February 2006 . . 68 . UK . . 1460-8324.
  21. News: TriMet adding 26 new light rail vehicles to replace oldest in the fleet. Becker. Tim. February 13, 2018. TriMet News. May 17, 2022. TriMet. https://web.archive.org/web/20180319163831/http://news.trimet.org/2018/02/trimet-adding-26-new-light-rail-vehicles-to-replace-oldest-in-the-fleet/. March 19, 2018. dead.
  22. Web site: Thanks for your service, Light Rail Vehicle 102 . October 19, 2023 . 2023-10-19 . TriMet . X (formerly Twitter) . en.
  23. Systems News . October 1998 . . 397 . UK . . 1460-8324.
  24. Oliver, Gordon (April 15, 1993). "Tri-Met prepares to purchase 37 low-floor light-rail cars". The Oregonian, p. D4.
  25. Vantuono . William C. . Tri-Met goes low-floor: Portland's Tri-Met has broken new ground with a procurement of low-floor light rail vehicles. The cars will be North America's first low-floor LRVs. . July 1993 . . 49–51 . 0033-8826.
  26. News: O'Keefe . Mark . New MAX cars smooth the way for wheelchairs . September 1, 1997 . The Oregonian . B12.
  27. News: Oliver. Gordon. MAX takes keys to cool new model. August 1, 1996. The Oregonian. D1.
  28. News: Oliver. Gordon. Tri-Met expands light-rail car order. September 26, 1997. The Oregonian. B6.
  29. Stewart, Bill (August 20, 2001). "MAX will add racks for bikes, not bags". The Oregonian.
  30. Tramways & Urban Transit magazine, November 2003, p. 428. UK: Ian Allan Publishing/Light Rail Transit Association.
  31. Web site: MAX: The Next Generation. TriMet. https://web.archive.org/web/20090304160220/http://trimet.org/max/newtrains.htm. March 4, 2009. June 9, 2011.
  32. News: Redden. Jim. TriMet puts new light-rail cars on track. Portland Tribune. August 6, 2009. https://web.archive.org/web/20090831121611/http://www.portlandtribune.com/news/story.php?story_id=124959768388491400. August 31, 2009. May 17, 2015.
  33. Morgan . Steve . Expansion for Portland's MAX: New routes and equipment . . 2010 . 33 . 1 – First quarter 2010. 38–40 . White River Productions, Inc..
  34. News: Rose. Joseph. TriMet asks cramped MAX riders to help design next-generation train's seating . The Oregonian. July 31, 2012 . September 4, 2012.
  35. Web site: PMLR Type 5 LRV Fact Sheet. TriMet. May 17, 2022. March 2015. https://web.archive.org/web/20150705030142/http://trimet.org/pdfs/max/Type5_LRVs.pdf. July 5, 2015. dead.
  36. Tramways & Urban Transit magazine, July 2015, p. 289. UK: LRTA Publishing. ISSN 1460-8324.
  37. Tramways & Urban Transit magazine, November 2015, p. 450. UK: LRTA Publishing. ISSN 1460-8324.
  38. Tramways & Urban Transit magazine, June 2012, p. 235. UK: LRTA Publishing. ISSN 1460-8324.
  39. News: . Siemens to supply S700 light rail vehicles to Portland . 2020-05-07 . . . UK . July 31, 2019.
  40. News: . Worldwide Review [regular news section] . October 2019 . . 394 . UK . Mainspring Enterprises Ltd. 1460-8324.
  41. News: Morgan . Steve . For Portland's MAX: New Cars, New Paint Scheme and More Ice-Cutting Pantographs . . 2020 . 44 . 1 – First quarter 2020 . 53 . White River Productions, Inc. . 0160-6913.
  42. Web site: Meet the New MAX . 2024-01-01 . trimet.org . en-US.
  43. News: . Worldwide Review [regular news section] . June 2021 . . 252 . UK . Mainspring Enterprises Ltd. 1460-8324.
  44. News: . Worldwide Review [regular news section] . August 2021 . . 350 . UK . Mainspring Enterprises Ltd. 1460-8324.
  45. News: . Worldwide Review [regular news section] . February 2023 . . 73 . UK . Mainspring Enterprises Ltd. 1460-8324.
  46. Web site: Our second 'Type 6' light rail vehicle arrived on Friday! . March 13, 2023 . TriMet . Instagram . 2023-07-18.
  47. Web site: Graf . Tyler . TriMet’s newest trains need room to test this June along the MAX Red Line . TriMet . 2024-06-09 . June 5, 2024.
  48. Web site: Graf . Tyler . October 2, 2023 . Meet the sixth-generation MAX at TriMet’s October 15 preview event . 2024-01-01 . TriMet News . en-US.
  49. News: . Systems News [regular news section] . March 2004 . . 107. UK . . 1460-8324.
  50. Web site: Lum . Brian . How Transit Works in Snow and Ice . TriMet . 2020-05-07 . December 21, 2018.
  51. News: . Worldwide Review [regular news section] . April 2019 . . 153 . UK . Mainspring Enterprises Ltd. 1460-8324.
  52. Web site: Resolution 19-02-13 of TriMet, authorizing a contract with Siemens Mobility, for Type 2/3 SD660 Light Rail Vehicle (LRV) fleet mid-life overhaul services . TriMet . February 20, 2024 . https://web.archive.org/web/20190304114136/https://trimet.org/meetings/board/pdfs/2019-02-27/res-19-02-13.pdf . March 4, 2019 . February 27, 2019 . live.
  53. News: . Worldwide Review [regular news section] . May 2019 . . 194 . UK . Mainspring Enterprises Ltd. 1460-8324.
  54. News: Corselli . Andrew . TriMet taps Siemens for $80M mid-life overhaul . February 20, 2024 . . June 3, 2019.
  55. News: . Worldwide Review [regular news section] . February 2020 . . 74 . UK . Mainspring Enterprises Ltd. 1460-8324.
  56. McKinney . Kevin . Rush Hour [transit news section] . . February 2024 . 48 . 1 – First quarter 2024. 66 . White River Productions, Inc. . 0160-6913 .
  57. News: . Worldwide Review [regular news section] . December 2022 . . 481 . UK . Mainspring Enterprises Ltd. 1460-8324.
  58. News: . Worldwide Review [regular news section] . September 2021 . . 390 . UK . Mainspring Enterprises Ltd. 1460-8324.
  59. News: . Siemens delivery heralds Portland LRV changes . December 2023 . . 452 . UK . Mainspring Enterprises Ltd. 1460-8324.
  60. News: . Systems Factfile No. 163: Portland, USA . June 2021 . . 240–247 . UK . Mainspring Enterprises Ltd. 1460-8324.
  61. News: . Worldwide Review [regular news section] . June 2024 . . 234 . UK . Mainspring Enterprises Ltd. 1460-8324.