Transport in Sydney in the 2010s explained

The 2010s saw many developments relating to transport in the Australian city of Sydney. The decade saw a substantial investment in infrastructure, including a new airport, motorway projects, light rail lines, Australia's first metro system, the new Waratah fleet and the demise of the non-air conditioned S sets from the rail network. Planning and branding of public transport services became substantially more centralised.

Governance

In Australia, urban transport is primarily the responsibility of the state and territory governments. Transport was a major issue in the lead up to the 2011 New South Wales state election. The incumbent NSW Labor government's management of public transport was perceived as poor and a succession of infrastructure projects that were announced and then abandoned proved politically damaging.[1] [2] [3] The election saw the 16-year-Labor government defeated in a landslide by the Liberal–National Coalition. The Coalition retained power in the 2015 election and the 2019 election.

The following individuals have served as Premier or Transport Minister during the decade:

PartyPremierPremier's term of officeTransport MinisterMinister's term of office
LaborKristina Keneally4 December 200928 March 2011David Campbell8 September 2008 20 May 2010
John Robertson21 May 2010 28 March 2011
LiberalBarry O'Farrell28 March 201117 April 20144 April 2011 1 April 2015
Mike Baird17 April 201423 January 2017
Andrew Constance2 April 2015 6 October 2021
Gladys Berejiklian23 January 20175 October 2021

Transport for NSW

Transport for NSW is a statutory authority of the New South Wales Government that manages transport services in the state. It was established on 1 November 2011. The authority was a separate entity from the New South Wales Department of Transport.[4] The authority subsumed the Transport Construction Authority and the Country Rail Infrastructure Authority, and plans and coordinates the functions of RailCorp, the State Transit Authority and Roads & Maritime Services.[5]

Transport for NSW took over the management of most train, bus, ferry and light rail services in New South Wales, which had previously been managed by the operators of the services. The authority now manages the route design, timetabling and branding of these services and also provides passenger information via printed material, a telephone service and a website.[6] Operation of the services is contracted out to a mixture of other government-owned organisations and private enterprise.[7]

The organisation worked to provide more unified branding of public transport services. A new series of logos, dubbed "the hop", was introduced. New mode icons for trains, buses, ferries and light rail were also introduced. Train, ferry and light rail services were given line numbers (T1-T7 for trains, F1-F7 for ferries and L1 for light rail). The icon for metro was also introduced when the metro opened to service in May 2019.

Since absorbing Roads & Maritime Services in December 2019 (see below), it is also responsible for building and maintaining road infrastructure, managing the day-to-day compliance and safety for roads and waterways, and vehicle and license registrations.[8]

Roads and Maritime Services

As part of the 2011 reforms that established Transport for NSW, Roads & Maritime Services (RMS) was created as a new agency of the New South Wales Government. It was responsible for building and maintaining road infrastructure and managing the day-to-day compliance and safety for roads and waterways.[9] It was formed from a merger of the Roads & Traffic Authority and NSW Maritime. Planning responsibilities were transferred to Transport for NSW.

On 1 December 2019, RMS was dissolved and all its functions were merged into Transport for NSW.[8]

Public transport ticketing

The ticketing system used on government-operated services in urban New South Wales was expanded and rebranded in April 2010.[10] Called "MyZone", the changes somewhat standardised fare product names and ticket designs across trains, buses and ferries; and brought privately operated buses into the same fare structure as those operated by the State Transit Authority. Limited integration with the then privately owned light rail system was added in 2011. The number of fare bands was reduced, which provided some commuters with substantial price cuts for public transport. Like the previous ticketing range, MyZone used the existing magnetic-stripe Automated Fare Collection system on trains, government buses and ferries. Private bus services and the light rail required manual checking or validation of the ticket by the driver or conductor.

The magnetic-stripe system was introduced in 1992 and had come to be seen as out-of-date. Tcard was a failed attempt to introduce an inter-modal stored-value smart card. Though originally intended to be in place before the 2000 Sydney Olympics, the project suffered major delays. In 2007, the state government terminated the contract to deliver the project.[11] On 12 April 2010, the state government announced that a new contract had been awarded for the second attempt to introduce a smartcard system.[12] The new system, called Opal, was introduced between December 2012 and December 2014. Once the rollout was complete, Opal quickly started replacing all other tickets. The pre-existing tickets were retired in stages; the last remaining tickets were withdrawn on 1 August 2016. At this time, single trip Opal tickets were introduced for infrequent travellers.[13]

Road

NorthConnex

NorthConnex is a 9km (06miles) motorway tunnel in the northern suburbs. Opened 31 October 2020, it connects the M1 Pacific Motorway to the M2 Hills Motorway. NorthConnex links to the Sydney Orbital Network and forms part of the National Highway route. Major construction began in mid-2015 and completed in late 2020.

The tunnel will provide an alternative to Pennant Hills Road. In 2013 National Roads and Motorists' Association members identified Pennant Hills Road as the third worst road in New South Wales and the Australian Capital Territory.[14]

WestConnex

WestConnex is a motorway scheme currently under construction. The scheme, a joint project of the New South Wales and Australian governments, encompasses widening and extension of the M4 Western Motorway, a new section for the M5 South Western Motorway named the M8, and a new inner western bypass of the Sydney CBD connecting the M4 and M5.

The initial M4 widening and King Georges Road Interchange Upgrades began construction in 2015 and were completed in 2017. The M4 East was completed in July 2019, and the New M5 Tunnel is due for completion in 2020 respectively. The final stages, M4–M5 link, Iron Cove Link and Sydney Gateway, are expected to begin construction in 2019 and be completed by 2023.[15]

Other road proposals

The Western Harbour Tunnel and Beaches Link was a planned north-south motorway between Frenchs Forest in the Northern Beaches and the WestConnex motorway at Rozelle in the Inner West.[16] The four-lane motorway is planned to be 14 km long.[17] The Sydney Harbour Bridge and Sydney Harbour Tunnel corridor currently carry 80 percent of all vehicles crossing Sydney Harbour and the Parramatta River. The new tunnel would reduce pressure on the existing infrastructure by providing another harbour crossing. The New South Wales Government pledged $77 million in funding to evaluate the design and construction feasibility of the project.

In 2014, federal government and the New South Wales state government jointly funded the Western Sydney Infrastructure Plan (WSIP), a road investment program consisting of key road upgrade projects in Western Sydney. Included in the plan is the Western Sydney Airport Motorway, a planned east-west motorway along the current alignment of Elizabeth Drive between the Westlink M7 Motorway and The Northern Road. The four-lane motorway is planned to be 14 km long and to be built at a cost of $1.25 billion. It is aimed at providing direct access from the Westlink M7 to the new Western Sydney Airport at Badgerys Creek.[18] The NSW Government announced $6 million for planning the Western Sydney Airport Motorway as part of the 2014–2015 State Budget.[19] Other WSIP projects include the upgrade, road widening, and partial realignment of The Northern Road between South Penrith and Narellan.

A northern extension the Princes Motorway (F6) is being considered. The motorway links Sydney and Wollongong and currently ends in Sydney's southern suburbs. As part of modifications made during the planning stage of the WestConnex project, stub tunnels will be added to the M8 tunnel to allow for an extension connection to it by the F6 extension.[20] [21] In June 2016 Roads & Maritime Services commenced geotechnical analysis to determine underground rock and soil conditions on the former F6 corridor from Waterfall to the Sydney Orbital Network at Rockdale with a view into developing a possible link between the Princes Motorway and the Orbital Network.[22] In 2017, it was revealed that the state government had reviewed a 3.6 billion dollar train tunnel between Thirroul and Waterfall on the South Coast Line that could reduce travel time between Sydney and Wollongong by 22 minutes, but the government favoured improving and extending the motorway instead.[23] Later in 2017, a state government leak showed the extent of the route. Works would include tunnels to the northern side of the Captain Cook Bridge and a bridge duplication allowing for motorway traffic to use the existing bridge and local traffic to keep access. To the south of the bridge, a surface motorway would run through current parks and reserves which had been left for the original route, then run along the route of the current Princes Highway with tunnels bypassing the suburbs of Heathcote and Waterfall before joining the existing freeway.[24] [25]

Heavy rail and metro

From CityRail to Sydney Trains

At the start of the decade, Sydney's suburban passenger rail network was owned by RailCorp and operated under its CityRail brand. CityRail had two tiers of service: suburban services catered for travel within Sydney, while intercity services extended out to the surrounding regions. The new Coalition government decided to reform this structure. RailCorp was stripped of its role as network manager and passenger service operator but remained the network owner. Two new operators were created: Sydney Trains maintained the network and operated suburban passenger services, while NSW Trains operated intercity services under the NSW TrainLink brand. The new operators took control on 1 July 2013.[26] [27] [28] [29]

Rail Clearways Program and 2013 timetable

The Rail Clearways Program was a package of infrastructure improvements to the Sydney suburban network that took place in the second half of the 2000s and the first half of the 2010s. The following projects were completed in the 2010s:

ProjectDescriptionOpened
Homebush TurnbackBreaks the Bankstown loop by giving Inner West line trains a place to terminate where six tracks reduce to fourMarch 2011[30] [31]
Kingsgrove–Revesby QuadruplicationAllows express trains to overtake and remain separate from all stops services, in conjunction with existing four track section between Wolli Creek and KingsgroveApril 2013[32]
Lidcombe TurnbackBreaks the Bankstown loop by giving Bankstown line trains a place to terminateNovember 2010[33]
Liverpool Second TurnbackNew platform for through trains, allowing conversion of existing through platform and side turnback into two centre turnbacksJanuary 2014[34] [35]
Quakers Hill–Vineyard DuplicationImproves capacity to support new suburbs in North-Western SydneySchofields – Vineyard deferred Oct 2008[36]
Quakers Hill – Schofields: October 2011[37]
Sutherland–Cronulla DuplicationDuplication of single track sections between Sutherland and Gymea and between Caringbah and Cronulla to improve capacityApril 2010[38]

With all but one of the Rail Clearways projects completed, a new timetable was released in October 2013. The new timetable saw the introduction of line numbers to the Sydney Trains network and the rationalisation of lines. The Bankstown loop – the interwoven operation of the Bankstown and Inner West lines – was broken by terminating trains at Lidcombe and Homebush. Almost all Liverpool via Regents Park services were discontinued. The Cumberland line was extended to Schofields and its operating hours were increased. The Northern line was merged with the North Shore and Western lines. The Airport & East Hills and South lines merged and were joined with what was left of the Inner West line.

The former lines were:

- !colspan="2"Line colour and name !Between -Airport & East Hills Line
Bankstown Line
Carlingford Line
Cumberland Line
Eastern Suburbs & Illawarra Line
Inner West Line
Northern Line
North Shore Line
Western Line
South Line
Olympic Park Line Some services operate between Central and Olympic Park, particularly during special events

These were replaced with:

- !colspan="2"Line colour, number and name !Between -North Shore, Northern & Western Line
Airport, Inner West & South Line
Bankstown Line
Eastern Suburbs & Illawarra Line
Cumberland Line
Carlingford Line
Olympic Park Line Some services operate between Central and Olympic Park, particularly during special events

South West Rail Link and 2017 timetable

The South West Rail Link is a new passenger railway that serves the city's "South West Growth Centre". It diverges from the existing network at Glenfield and runs to Leppington. An intermediate station serves Edmondson Park. The line opened 8 February 2015.[39] [40] The railway was in December 2015, replacing the initial shuttle service between Leppington and Liverpool.[41]

A new Sydney Trains timetable was introduced in November 2017. The T2 line was split in two. The new T2 consists of services from Leppington to the city via Granville, with a branch to Parramatta being added. A new T8 line covers services from Macarthur to the city via Sydney Airport or Sydenham. The T2 is coloured light blue – a similar colour to CityRail's South Line. The T8 is coloured green.[42] T5 services were modified to no longer travel to and from Campbelltown, instead starting and terminating at Leppington. Late night and weekend services were introduced on the line.[43] The late night services extend to Richmond, replacing T1 services at these times. These changes mean the section of the network between Glenfield and Macarthur is served exclusively by services operating via the East Hills railway line.

- !colspan="2"Line colour, number and name !Between -North Shore, Northern & Western Line
Inner West & Leppington Line
Bankstown Line
Eastern Suburbs & Illawarra Line
Cumberland Line
Carlingford Line
Olympic Park Line Some services operate between Central and Olympic Park, particularly during special events
Airport & South Line

2018–2019 timetable changes due to Sydney Metro

The Epping to Chatswood railway line closed in September 2018 to enable its conversion to metro standards. This resulted in the reintroduction of the traditional Northern Line route from Hornsby to the city via Strathfield, by . This route was eventually made a separate T9 route in April 2019. The Metro North West Line began service one month later on 26 May 2019 when the Sydney Metro Northwest opened.

- !colspan="2"Line colour, number and name !Between -North Shore & Western LineBerowra and Emu Plains or Richmond via Chatswood, Central and Strathfield
Inner West & Leppington Line
Bankstown Line
Eastern Suburbs & Illawarra Line
Cumberland Line
Carlingford Line
Olympic Line Some services operate between Central and Olympic Park, particularly during special events
Airport & South Line
Northern LineHornsby and Gordon via Strathfield, Central and Chatswood
Metro North West LineTallawong and Chatswood

Freight infrastructure

The Southern Sydney Freight Line is a freight-only relief line in the south-western suburbs. It runs parallel to the Main South line and was constructed to avoid a curfew for freight trains that restricts them from operating in the suburban area during peak hours. The line forms part of a dedicated freight only corridor between Macarthur and Port Botany. The line is managed by the Australian Rail Track Corporation, while the adjacent passenger lines are managed by Sydney Trains. The line commenced operations in late 2012.[44]

The stage 1 Northern Sydney Freight Corridor projects provided increased capacity along the shared passenger and freight route between Sydney and Maitland. It included two projects within Sydney. A new underpass at North Strathfield removes the need for freight trains to switch tracks, which blocked passenger trains in the process. A third track between Epping and Thornleigh provides an additional overtaking opportunity for northbound trains on this steeply graded section. The projects were completed by mid-2016.

In its 2017 budget, the Australian Government announced funding for the Inland Rail project. This new route will provide a bypass of Sydney for trains connecting with Brisbane from Perth, Adelaide and Melbourne and will result in reduced growth in the number of freight trains passing through Sydney.

Metro projects

See main article: Sydney Metro. The decade has seen work begin on the long-planned North West Rail Link. The line was initially planned as a main line railway integrated with the rest of the Sydney suburban network, but in March 2008 the Government changed the project to a metro line dubbed the North West Metro and expanded the line to run all the way to the Sydney CBD via Drummoyne and Pyrmont. In October 2008, the NSW Government announced that the North West Metro would be indefinitely deferred due to budgetary cuts.[45] In February 2010, two and a half months after Kristina Keneally had become Premier, the NSW Government revealed the cancellation of the entire Sydney Metro project in its Metropolitan Transport Plan[46] [47] and returned to the North West Rail Link main line rail proposal.

Following his victory in the 2011 state election, newly elected Premier Barry O'Farrell announced that his first order of business would be to start construction on the North West Rail Link.[48] The new government had originally intended to maintain the plan to build the line as a main line railway, but in 2012 it decided to switch the project back to a metro line. The Epping to Chatswood railway line will also be converted to metro standards. The line, now known as Sydney Metro Northwest, opened 26 May 2019 and was Australia's first metro line.

The decision to build the line as a metro meant passengers travelling to and from the Sydney central business district are required to change trains at Chatswood. This would be inconvenient and would place pressure on the North Shore line. The government's solution was to announce a major extension of the metro project. Sydney Metro City & Southwest is a 30-kilometre extension from Chatswood to Bankstown. The link will include a new tunnel that begins at Chatswood, travels down the lower North Shore, under Sydney Harbour, through the Sydney central business district and emerges at Sydenham. The extension will then take over most of the main line Bankstown railway line. The project is due to be completed in 2024.

A second metro line was announced in November 2016. Sydney Metro West will travel from the central business district to Parramatta.[49] Planning for the line is at an extremely early stage. The line is expected to open in the second half of the 2020s.

A rail link to the Western Sydney Airport was announced by the New South Wales and Australian governments in March 2018. This line would run south from St Marys to the airport, before continuing on to the "Badgerys Creek Aerotropolis", an area south of the airport. Funding for the line will be split 50:50 between the governments.[50] The line is likely to be a metro or light metro.[51]

Rolling stock fleet

The decade has seen the delivery of the OSCAR and Waratah classes and planned introduction of a new Waratah-based suburban class and trains for the metro.

The OSCARS or H sets are a class of 55 four-car trains that primarily operate on intercity services but are sometimes also used on suburban services. They entered service between 2006 and 2012.[52]

The Waratahs or A sets are a class of 78 eight-car trains that operate on the suburban network. The trains entered service between 2011 and 2014.[53] [54] These were the first trains in Sydney to be configured as eight-car rather than four-car sets.

Originally, the Waratahs were intended to replace all 498 S set carriages, but in February 2013 it was revealed that some S sets would still be required to provide services on the South West Rail Link.[55] An option existed to extend the order, but in March 2013 the government indicated it would not take this up.[56] Instead, in May 2014, the government announced its intention to purchase new trains for the NSW TrainLink intercity network. These new trains are expected to enter service in late 2019 and will release at least some OSCARS from intercity to Sydney Trains services.[57]

Despite proceeding with the intercity train order, the New South Wales Government announced on 1 December 2016 that 24 new suburban trains had been ordered. Known as series 2 Waratahs or B sets, the trains share more than 90 percent of their design with the original Waratahs. The first trains entered service in late 2018 and the last by the end of June 2019 allowing the last S set to be withdrawn on 28 June 2019. A further 17 sets have been ordered with a possible 28 additional sets to the ordered at a future date.[58] [59] [60] [61] [62]

A technology upgrade of the Tangara trains was announced in August 2015. The program will extend the life of these trains (which were introduced in the late 1980s and early 1990s) and bring technology into line with newer trains. The contract was awarded to UGL Limited.[63] [64] The program is expected to be completed in 2019.[65]

22 six-car Alstom Metropolis trains were put into service in 2019. These operate on the Sydney Metro network and are single deck, in contrast to the double deck suburban trains.[66]

Light rail and monorail

Purchase by the government and closure of monorail

Sydney's original light rail line, the Inner West Light Rail, was delivered as a public-private partnership. The private owner, Sydney Light Rail Company, was awarded a 30.5-year concession, allowing it to operate the line until February 2028, when ownership would pass to the New South Wales Government.[67] The contract gave the company significant control over the commercial arrangements relating to future extensions or interconnecting lines.[68] The government purchased the company in March 2012, removing the contractual restrictions on expanding the light rail network.[69] [70]

Another motivation for the purchase was the government's desire to redevelop the Sydney Convention and Exhibition Centre at Darling Harbour. The Sydney Monorail, a loop line between the Central Business District and Darling Harbour, shared an ownership and operational structure with the light rail. The government saw the monorail as an impediment to the redevelopment of the Darling Harbour area.[71] Opening in 1988, the monorail was built as a response to an earlier redevelopment of Darling Harbour from a port to a leisure precinct. The monorail ceased operating on 30 June 2013 and was then demolished.[72]

Light rail extensions

The Inner West Light Rail was extended from Lilyfield to Dulwich Hill in March 2014.[73] Like much of the preexisting line, the extension uses the alignment of a disused freight railway.

The CBD and South East Light Rail is a future line that will operate from Circular Quay at the northern end of the Central Business District to Central station at the southern end, then continuing to the south-eastern suburbs. Major construction began in October 2015.[74] The line was initially projected to open in early 2019.[75] However, the project was extensively delayed, with the line between Circular Quay and Randwick opened on 14 December 2019 and the rest of the stops on the Kingsford branch to open March 2020.[76] [77]

Parramatta Light Rail is the name given to two planned lines that converge on the Western Sydney centre of Parramatta. The first line runs from Carlingford to Westmead via the Parramatta CBD. It includes the conversion of most of the underused existing heavy rail Carlingford line to light rail standards. Construction is expected to begin in 2018 and be completed by 2023.[78] [79]

The second line branches from the first at Camellia or Rydalmere and heads to the Sydney Olympic Park events precinct. The route was originally meant to travel to Strathfield but was redesigned and truncated in October 2017. Construction of this line has been deferred. To the present day, stations between Camellia and Sydney Olympic Park have never been confirmed.

Tram fleet

Services on the Inner West Light Rail are provided by a fleet of twelve CAF Urbos 3 trams. The trams were ordered to service the Dulwich Hill extension, increase service frequencies and replace the Variotrams that had been providing services on the Inner West Light Rail since the first section of the line opened in 1997.[80] [81] The trams entered service between July 2014 and June 2015.[82] [83] As a stopgap measure until the new trams arrived, four leased CAF Urbos 2 trams ran on the Inner West Light Rail in 2014.

Sixty Alstom Citadis X05 trams were purchased to provide services on the CBD and South East Light Rail.[84] The trams consist of five-sections and operate coupled together in pairs.[85] The first unit was completed in May 2017.[86] [87]

An additional thirteen CAF Urbos 3 vehicles will operate on the Parramatta Light Rail.[88]

Bus

Bus contract reform

The 2004 Review of Bus Services in NSW (the Unsworth report) found that the Sydney metropolitan area had two bus systems – government and privately operated, with widely varying levels of service and customer satisfaction that fell short of community expectations. The government accepted the review's recommendation that the existing 87 serviced areas be consolidated into 15 regions and service contracts be established with the operators. The contracts provided consistent fares, concessions and service standards for customers on both government and privately operated services. These contracts were negotiated with existing operators and commenced in 2005.[89]

In 2011 and 2012 the privately operated contract regions were put out to competitive tender for the first time.[90] [91] Some of the incumbent operators lost the right to continue operating services in their regions.

State Transit

The role of the government-owned bus operator State Transit was reduced. Operation of the Liverpool–Parramatta T-way was included in the broader region 3 contract from 2013, with Transit Systems taking over operation from State Transit's Western Sydney Buses subsidiary.

In 2017, the government announced that region 6 services – covering Sydney's Inner West region – would be transferred to a private operator.[92] Transit Systems was also awarded this contract, which commenced on 1 July 2018 and runs for eight years.[93]

State Transit were also replaced as the operator of Newcastle's bus and ferry services – the authority's only operations outside of Sydney. However, operation of the new B-Line service was handed to State Transit as part of its region 8 contract.

B-Line

A new express bus service called B-Line was introduced on the Northern Beaches in November 2017. The service runs for 27 kilometres, between Mona Vale on the Northern Beaches and the Sydney central business district. It is operated by dedicated fleet of double deck buses.[94] [95] [96] [97] As part of its introduction there was a restructure of other routes operating in the region.[98]

Bus fleet

As the government has moved to a contestable contract model since the Unsworth report, so it has acquired a greater interest in the buses acquired to operate its routes. The government buys many of the new buses entering service in private operator fleets, and has step-in rights where a private operator loses a contract. State Transit and the private operators must buy new vehicles from approved panel suppliers. After several decades absence, double-decker buses were re-introduced to Sydney on select routes. Until 2010, each bus operator determined the livery for their vehicles. In late 2010, the NSW Government introduced a new livery for use on all new vehicles entering service on the network. The design is composed of a light blue background, a white chevron shape pointing in the direction of travel, and dark blue bumpers.[99] In 2017 the government announced that articulated buses would be progressively phased out in favour of double-deckers.[100]

Ferry

Franchising

Operation of the Sydney Ferries network was contracted out to a private operator.

On 3 April 2007, Bret Walker, a Senior Counsel, was appointed to undertake a commission of inquiry into Sydney Ferries' operations.[101] Submissions to Walker's inquiry were critical of many aspects of the operation of Sydney Ferries.[102] Walker's report, delivered in November 2007, was highly critical of the ferry management, industrial relations and government interference.[103] [104] Walker made several major recommendations including the urgent replacement of the entire ageing fleet of vessels and handing day-to-day operations over to a private sector operator while the NSW government retained the fleet and other assets in public ownership.[105]

In 2008, the NSW Government called for private sector bids to provide ferry services under a services contract. But in April 2010 the NSW Government decided the service contract would remain with Sydney Ferries Corporation.[106]

In 2011, following the election of the O'Farrell Government, it was decided to contract out the operation of Sydney Ferries to the private sector, with the government retaining ownership of both the Balmain Maintenance Facility and the ferry fleet.

On 28 July 2012, Harbour City Ferries, originally a 50/50 joint venture between Broadspectrum and Transdev Australasia, began operating the services of Sydney Ferries under a seven-year contract.[107] [108] [109] In December 2016, Transdev took full control of the joint venture, and to coincide with a new contract commencing 1 July 2019 and finishing in 2028, the operation was renamed Transdev Sydney Ferries[110]

Route changes

As part of the 2013 public transport branding changes, route numbers were introduced to the Sydney Ferries network. The routes were: F1 Manly, F2 Taronga Zoo, F3 Parramatta, F4 Darling Harbour, F5 Neutral Bay, F6 Mosman Bay and F7 Eastern Suburbs. The 2017 timetable saw some of these routes reorganised. The F7 route was truncated to terminate at Double Bay instead of Watsons Bay and the F4 was extended from its prior terminus at Circular Quay to take over the remainder of the route. The F3 was split up, resulting in a new F8 route taking over services to most wharves east of Cockatoo Island.

New and upgraded wharves

A new Barangaroo ferry wharf was built to act as a hub for ferry access from the western side of the Sydney central business district. The Barangaroo area, which had been a working port for years, had been a long-proposed site for urban renewal. Major construction of the redevelopment at Barangaroo began in 2011.[111] In May 2013, the government outlined plans to build a new ferry terminal at Barangaroo to replace the nearby Darling Harbour wharf.[112] As well as allowing for additional services on the F3 Paramatta River route, the increased capacity will allow additional routes to use the new wharves.[113] It was proposed that all Sydney Ferries routes that used the Darling Harbour wharf would be rerouted to Barangaroo, with Darling Harbour to be decommissioned and handed back to private operation.[114] The wharf opened in late June 2017.[115] [116] It offers a transport interchange with Wynyard railway station via Wynyard Walk, an underground pedestrian tunnel built to improve connections between the railway station and Barangaroo.[117] [118]

Many other wharves served by Sydney Ferries have been rebuilt during the decade. The new wharves use a largely shared design.[119]

Ferry fleet

In November 2014, the government announced six new ferries would be ordered.[120] [121] Called the Emerald class, they operate on the Inner Harbour routes and are designed to look similar to the First Fleet class vessels.[122] The first ferry was expected to enter service in late 2016.[123] However, the entry into service was delayed due to problems uncovered during testing that required modifications to the design.[124] The first ferry eventually entered service on 26 June 2017.[125] [126] The introduction of the Emerald class ferries allowed the final two Lady class ferries to be withdrawn in October 2017.[127]

Other

Western Sydney Airport

The construction of a Second Sydney Airport has been a long-standing issue for the city. A site located within the suburb of was officially designated by the Australian Government on 15 April 2014, bringing an end to decades of debate on the location of another airport within the Sydney basin.[128] Western Sydney Airport is a planned 24-hour, curfew-free airport.[129] Construction began in September 2018 and is expected to be completed in 2026.[130]

Moorebank Intermodal Terminal

Moorebank Intermodal Terminal is under construction in the south-western suburb of Moorebank. In April 2012 the Australian Government committed to developing the Moorebank Intermodal Terminal with private sector involvement. The terminal will be built on 240 hectares of land formerly occupied by the Australian Army. The site will be connected to the Southern Sydney Freight Line near Casula station, providing access to Port Botany. It will also be close to the M5 Motorway and its junctions with the M7 and Hume Highway.[131] [132] Construction began in April 2017.[133] [134]

Notes and References

  1. Web site: West. Andrew. How Labor lost New South Wales. Inside Story. 26 October 2017. 30 April 2012. live. https://web.archive.org/web/20170306222440/http://insidestory.org.au/how-labor-lost-new-south-wales. 6 March 2017.
  2. Web site: Aarons. Mark. NSW Labor. The Monthly. Schwartz Media. 26 October 2017. 16 February 2011. live. https://web.archive.org/web/20170820151200/https://www.themonthly.com.au/issue/2011/march/1314864337/mark-aarons/comment. 20 August 2017.
  3. News: NSW must emerge from Labor's heart of darkness . News Limited . The Australian . 25 March 2011. 28 March 2011.
  4. Web site: Annual Report for the Department of Transport. Government of New South Wales. 2014. 11 April 2015. live. https://web.archive.org/web/20171027015204/https://www.transport.nsw.gov.au/sites/default/files/media/documents/2017/tfnsw-annual-report-2013-2014.pdf. 27 October 2017.
  5. News: Saulwick, J. . Synchronised timetables for travellers-but not yet . The Sydney Morning Herald . 16 July 2011 . live . https://web.archive.org/web/20110818070249/http://www.smh.com.au/nsw/synchronised-timetables-for-travellers--but-not-yet-20110715-1hi53.html . 18 August 2011 .
  6. Web site: About transportnsw.info. transportnsw.info. Transport for NSW. 12 September 2015. dead. https://web.archive.org/web/20150629065427/http://www.transportnsw.info/en/about/about-us.page. 29 June 2015.
  7. Web site: The Transport Cluster. Transport for NSW. 19 August 2015. live. https://web.archive.org/web/20150911005225/http://www.transport.nsw.gov.au/about/transport-agencies. 11 September 2015.
  8. Web site: Roads and Maritime Services has joined with TfNSW. Roads and Maritime Services. 5 December 2019. https://web.archive.org/web/20191204230403/https://www.rms.nsw.gov.au/about/news-events/roads-maritime-transport.html. 4 December 2019. live.
  9. Roads and maritime services agency effective from today. 1 November 2011. 2 November 2011. Government of New South Wales. dead. https://web.archive.org/web/20130619034037/http://www.rta.nsw.gov.au/newsevents/downloads/minister_releases/111101-rmservices.pdf. 19 June 2013.
  10. https://web.archive.org/web/20100204200421/http://myzone.nsw.gov.au/index.html MyZone website
  11. News: Sydney Morning Herald. $64m Tcard fiasco over. 1 August 2008. 9 November 2007. live. https://web.archive.org/web/20080418153534/http://www.smh.com.au/news/national/64m-tcard-fiasco-over/2007/11/09/1194329499286.html. 18 April 2008.
  12. Web site: Pearl Consortium wins NSW Tcard contract . 12 April 2010 . iTwire . 2016-03-03 . dead . https://web.archive.org/web/20160303195536/http://www.itwire.com/it-industry-news/strategy/38211-pearl-consortium-wins-nsw-tcard-contract . 3 March 2016 .
  13. Web site: The last paper tickets to be wrapped up on August 1. Transport for NSW. 4 July 2016. dead. https://web.archive.org/web/20160706072443/http://www.transport.nsw.gov.au/media-releases/last-paper-tickets-be-wrapped-august-1. 6 July 2016.
  14. Web site: Seeing Red on Roads . 2013 . 28 April 2015 . The National Roads and Motorists' Association . dead . https://web.archive.org/web/20150413003022/http://www.mynrma.com.au/about/news/seeing-red-on-roads-2013.htm . 13 April 2015 .
  15. News: Saulwick . Jacob . What you need to know about WestConnex, the biggest road we've ever seen . 14 March 2015 . The Sydney Morning Herald . 14 March 2015 . live . https://web.archive.org/web/20150924215736/http://www.smh.com.au/nsw/what-you-need-to-know-about-westconnex-the-biggest-road-weve-ever-seen-20150313-143ujn.html . 24 September 2015 .
  16. News: Western Harbour Tunnel and Beaches Link. NSW. Roads and Maritime Services. 2017-04-06. en. live. https://web.archive.org/web/20170407055110/http://www.rms.nsw.gov.au/projects/sydney-north/western-harbour-tunnel-beaches-link/index.html. 2017-04-07.
  17. News: Project – Infrastructure Pipeline. Infrastructure Pipeline. 2017-04-06. en-US. live. https://web.archive.org/web/20170407143944/http://infrastructurepipeline.org/project/western-harbour-tunnel/. 2017-04-07.
  18. Web site: New Motorway – M7 to The Northern Road. Department of Infrastructure and Regional Development. 16 April 2014. 16 April 2014. dead. https://web.archive.org/web/20140416174400/http://www.infrastructure.gov.au/infrastructure/western_sydney/infrastructure_plan.aspx. 16 April 2014.
  19. Web site: Budget Paper 4 – Infrastructure Statement. NSW Budget 2014–2015. NSW Treasury. 21 June 2014. PDF. 17 June 2014. dead. https://web.archive.org/web/20140620184837/http://www.budget.nsw.gov.au/2014-15/budget_papers. 20 June 2014.
  20. News: Saulwick . Jacob . 3 September 2015 . Multimillion-dollar compensation brawl brews over WestConnex St Peters interchange . . 26 July 2016 . live . https://web.archive.org/web/20151107084751/http://www.smh.com.au/nsw/multimilliondollar-compensation-brawl-brews-over-westconnex-st-peters-interchange-20150903-gje9oi.html . 7 November 2015 .
  21. Book: WestConnex – Updated Strategic Business Case . Sydney Motorway Corporation . November 2015 . 26 July 2016 . 978-1-925421-39-2 . live . https://web.archive.org/web/20170225011155/https://www.westconnex.com.au/sites/default/files/WestConnex%20Updated%20Strategic%20Business%20Case%20-%20November%202015.pdf . 25 February 2017 .
  22. Web site: Fact sheet: F6 Corridor Geotechnical Analysis . . . June 2016 . 10 October 2016 . dead . https://web.archive.org/web/20161010214917/http://www.rms.nsw.gov.au/documents/projects/sydney-south/f6-corridor/f6-corridor-fact-sheet-1606.pdf . 10 October 2016 .
  23. News: Minister's answer undercut by cabinet documents on Sydney-Wollongong rail tunnel . 27 June 2017 . 27 June 2017 . Sydney Morning Herald . Robertson . James . Matt . O'Sullivan . live . https://web.archive.org/web/20170929201820/http://www.smh.com.au/nsw/ministers-answer-undercut-by-cabinet-documents-on-sydneywollongong-rail-tunnel-20170627-gwzmg0.html . 29 September 2017 .
  24. News: Update: The F6's biggest impact area. Trembath. Murray. 28 September 2017. St George & Sutherland Shire Leader. 2017-09-29. en. live. https://web.archive.org/web/20170929135334/http://www.theleader.com.au/story/4953381/update-the-f6s-biggest-impact-area/. 2017-09-29.
  25. Web site: Cabinet documents leaked to #9News show hundreds of homes and parks could be swallowed up by a new Sydney motorway. #NSWPol @CoKeefe9 #9Newspic.twitter.com/aP77oNOcPO. Sydney. Nine News. 27 September 2017. @9NewsSyd. en. 2017-09-29. live. https://web.archive.org/web/20171027015204/https://twitter.com/9NewsSyd/status/912952571576197120?ref_src=twsrc%5Etfw&ref_url=http%3A%2F%2Fwww.theleader.com.au%2Fstory%2F4953381%2Fupdate-the-f6s-biggest-impact-area%2F. 2017-10-27.
  26. http://www.smh.com.au/nsw/railcorp-job-cuts-first-of-many-unions-20120515-1yo93.html#ixzz1uwKcuUpH "RailCorp job cuts first of many: unions"
  27. http://www.dailytelegraph.com.au/news/sydney-news/ruthless-railcorp-reforms-planned-as-middle-management-axed/story-fnb5f12x-1226355250747 "Ruthless RailCorp reforms planned as middle management axed"
  28. http://www.railcorp.info/__data/assets/pdf_file/0010/7021/RailCorp_Corporate_Plan.pdf Corporate Plan 2012/13
  29. http://www.dailytelegraph.com.au/news/jobs-to-go-as-railcorp-gets-the-axe/story-e6freuy9-1226517985059 "700 jobs to go as RailCorp gets the axe"
  30. http://www.transport.nsw.gov.au/Projects-Completed-Projects/Rail-Clearways-Program Rail Clearways Program – Completed Projects
  31. https://web.archive.org/web/20090605190627/http://www.tidc.nsw.gov.au/SectionIndex.aspx?PageID=570 Homebush Turnback Project Profile
  32. https://web.archive.org/web/20090605191530/http://www.tidc.nsw.gov.au/SectionIndex.aspx?PageID=598 Kingsgrove to Revesby Quadruplication Project Profile
  33. https://web.archive.org/web/20090605192107/http://www.tidc.nsw.gov.au/SectionIndex.aspx?PageID=510 Lidcombe Turnback Project Profile
  34. https://web.archive.org/web/20090605190916/http://www.tidc.nsw.gov.au/SectionIndex.aspx?PageID=518 Liverpool Turnback Project Profile
  35. http://www.transport.nsw.gov.au/sites/default/files/b2b/projects/Clearways_Liverpool_construction_update_January_2014.pdf Liverpool Turnback
  36. http://www.treasury.nsw.gov.au/__data/assets/pdf_file/0016/12706/08-09_Mini-Budget.pdf Mini-Budget 2008/09 page 25
  37. https://web.archive.org/web/20090605183823/http://www.tidc.nsw.gov.au/SectionIndex.aspx?PageID=537 Richmond Line Duplication Project Profile
  38. https://web.archive.org/web/20090605192424/http://www.tidc.nsw.gov.au/SectionIndex.aspx?PageID=592 Cronulla Line Duplication Project Profile
  39. http://www.sbs.com.au/news/article/2015/01/01/nsws-southwest-rail-link-open-soon NSW's southwest rail link to open soon
  40. http://www.transport.nsw.gov.au/media-releases/south-west-rail-link-opens-customers-february-2015-one-year-ahead-schedule-and-300m South West Rail Link opens to customers in February 2015 – one year ahead of schedule and $300m under budget
  41. Web site: South West Rail Link: Soon to head North and East, with more services. Transport for NSW. 15 October 2015. dead. https://web.archive.org/web/20151119041649/http://www.transport.nsw.gov.au/media-releases/south-west-rail-link-soon-head-north-and-east-more-services. 19 November 2015.
  42. Web site: Changes to Sydney's train network . Transport for NSW . 2017-08-09 . dead . https://web.archive.org/web/20170809041550/https://www.transport.nsw.gov.au/system/files/media/documents/2017/mtms-sydney-network-changes-aug-2017.pdf . 2017-08-09 .
  43. Web site: Transport for New South Wales . 27 February 2017 . More Trains, More Services for South Western Sydney . Government of New South Wales . 27 February 2017 . live . https://web.archive.org/web/20170227231955/https://www.transport.nsw.gov.au/sites/default/files/b2b/projects/more-trains-more-services-sw-sydney-fact-sheet.pdf . 27 February 2017 .
  44. Web site: SAFE Notice 2012. Number:2-1821 Enfield West to Glenlee. Commence operation of Southern Sydney Freight Line . Australian Rail Track Corporation . 14 December 2012 . 23 January 2013 . dead . https://web.archive.org/web/20140109023527/http://extranet.artc.com.au/docman/DocManFiles/DocTypes/SAFE/Files/2-1821.PDF?645512623 . 9 January 2014 .
  45. News: Benson. Simon. Northwest Metro rail link officially shelved. 6 April 2011. The Daily Telegraph. 31 October 2008. Sydney, New South Wales.
  46. Web site: NSW Government. Metropolitan Transport Plan: Connecting the City of Cities. 7 April 2011. dead. https://web.archive.org/web/20110406101341/http://www.nsw.gov.au/metropolitantransportplan. 6 April 2011.
  47. Book: Sydney Metro. 2010 Annual Report. 2010. NSW Government. 7 April 2011. dead. https://web.archive.org/web/20110404235324/http://www.transport.nsw.gov.au/sites/default/file/Sydney%20Metro%202010%20Annual%20Report.pdf. 4 April 2011.
  48. Web site: ABC News. O'Farrell hails new political landscape. Australian Broadcasting Corporation. 6 April 2011. 27 March 2011. live. https://web.archive.org/web/20110501204315/http://www.abc.net.au/news/stories/2011/03/27/3174848.htm. 1 May 2011.
  49. Web site: Sydney Metro West: a new railway, more trains for Western Sydney . 14 November 2016 . Transport for NSW . live . https://web.archive.org/web/20170429171125/http://www.transport.nsw.gov.au/newsroom/media-releases/sydney-metro-west-new-railway-more-trains-western-sydney . 29 April 2017 .
  50. Web site: Western Sydney City Deal to deliver rail, investment and jobs. Transport for NSW. 6 March 2018. 4 March 2018.
  51. Web site: Western Sydney Rail Needs Scoping Study Outcomes Report. https://web.archive.org/web/20180306142557/https://www.transport.nsw.gov.au/system/files/media/documents/2018/wsrnsoutcome-report.pdf. dead. 2018-03-06. Australian Government and New South Wales Government. 7 March 2018. 55. March 2018.
  52. Web site: Oscar project. RailCorp. https://web.archive.org/web/20130325015654/http://www.railcorp.info/about_railcorp/oscars. 25 March 2013. dead.
  53. News: Preening Waratah makes its entrance. The Sydney Morning Herald. Jacob. Saulwick. 2 July 2011. dead. https://web.archive.org/web/20110703093455/http://www.smh.com.au/nsw/preening-waratah-makes-its-entrance-20110701-1gv3e.html. 3 July 2011.
  54. Web site: NSW Government delivers final Waratah train: all Sydney services air-conditioned. Transport for NSW. 3 June 2014. 2 June 2014. dead. https://web.archive.org/web/20140606223645/http://www.transport.nsw.gov.au/media-releases/nsw-government-delivers-final-waratah-train-all-sydney-services-air-conditioned. 6 June 2014.
  55. http://au.news.yahoo.com/latest/a/-/latest/16192438/cityrail-passengers-travelling-waratah-trains-transport-nsw-lee-jeloscek/ New Trains Won't Run on All Rail Lines
  56. http://www.smh.com.au/nsw/commuters-stuck-with-old-trains-on-new-rail-link-20130314-2g3e5.html Commuters stuck with old trains on new rail link
  57. Web site: NSW Government to invest $2.8 billion in new intercity trains, making all trains air-conditioned. Transport for NSW. 8 May 2014. live. https://web.archive.org/web/20140508224818/http://www.transport.nsw.gov.au/media-releases/nsw-government-invest-28-billion-new-intercity-trains-making-all-trains-air. 8 May 2014.
  58. News: Sydney trains to receive $1.5b boost for services to western suburbs. McNally. Lucy. 1 December 2016. ABC News. Australian Broadcasting Corporation. en-AU. 2016-12-01. live. https://web.archive.org/web/20161201093106/http://www.abc.net.au/news/2016-12-01/sydney-trains-get-$1.5b-boost-for-services-to-western-suburbs/8083774. 2016-12-01.
  59. Web site: Rail revolution: 'More Trains, More Services' to bust congestion. Transport for NSW. 1 December 2016. 2016-12-01. live. https://web.archive.org/web/20161201211659/http://www.transport.nsw.gov.au/newsroom/media-releases/rail-revolution-more-trains-more-services-bust-congestion. 2016-12-01.
  60. Web site: More Trains, More Services. Transport for NSW. 1 December 2016. dead. https://web.archive.org/web/20161202035602/http://www.transport.nsw.gov.au/sites/default/files/b2b/projects/more-trains-more-services-program-fact-sheet.pdf. 2 December 2016.
  61. Web site: Downer awarded Sydney Growth Trains contract. Downer Group. 1 December 2016. 1 December 2016. dead. https://web.archive.org/web/20161201212612/http://www.downergroup.com/Investors-and-media/ASX-announcements/2016/Downer-awarded-Sydney-Growth-Trains-contract.aspx. 1 December 2016.
  62. James. Michael. November 2018. The Waratah Series Two has arrived. Railway Digest. 28–31.
  63. http://www.ugllimited.com/Asset/cms/ASX_announcements/2015/August/ASX_Release_UGL_awarded_contract_for_Tangara_technology_upgrade.pdf UGL awarded $131m contract for Tangara technology upgrade
  64. http://www.abc.net.au/news/2015-08-05/newcastle-train-builder-awarded-24131m-contract/6674034 Newcastle train builder awarded $131m contract/6674034
  65. Web site: Fleet update – September 2017. https://web.archive.org/web/20180213022011/https://www.transport.nsw.gov.au/system/files/media/documents/2017/fdp-fleet-update-sept-2017-final.pdf. dead. 2018-02-13. Transport for NSW. 12 February 2018. 4. September 2017.
  66. Web site: Case study: North West Rail Link, Sydney, Australia. Alstom. 14 October 2015. dead. https://web.archive.org/web/20160304121646/https://assets.partners.alstom.com/StreamedAsset.axd?assetid=eec46df7-20f4-4ca0-b084-48fd3bab023e&size=Original&disposition=inline. 4 March 2016.
  67. Web site: Sydney Light Rail Extension – Stage 1 Inner West Extension Product Definition Report. Transport NSW. July 2010. dead. https://web.archive.org/web/20140407104941/http://www.transport.nsw.gov.au/sites/default/files/b2b/rail/SLRE-Stage-1-Final-Product-Definition-Report_Updated-19Jul10.pdf. 2014-04-07.
  68. Light Rail in Sydney: Some Privatisation Lessons. Mills, Gordon. Agenda. 1997. 4. 4. 435, 438.
  69. News: Tan. Gillian. Australian Infrastructure Fund sells Metro Transport stake. The Australian (from The Wall Street Journal). 23 March 2012. dead. https://web.archive.org/web/20140508154806/http://www.theaustralian.com.au/business/wall-street-journal/australian-infrastructure-fund-sells-metro-transport-stake/story-fnay3vxj-1226308293323. 8 May 2014.
  70. Web site: Light rail strategy for Sydney. Clayton Utz. Clayton Utz Insights. 5 July 2012. 6 July 2012. Cosgriff, Stuart. Griffiths, Emily. live. https://web.archive.org/web/20120714054448/http://www.claytonutz.com/publications/edition/5_july_2012/20120705/light_rail_strategy_for_sydney.page. 14 July 2012.
  71. News: Campion. Vikki. Last stop for Sydney Monorail. The Daily Telegraph. 23 March 2012.
  72. News: van den Broeke. Leigh. Sydney monorail makes its last loop after 25 years of service . The Daily Telegraph. 1 July 2013.
  73. Web site: Inner West Light rail extension now complete . . 27 March 2014 . dead . https://web.archive.org/web/20140327044022/http://www.transportnsw.info/en/transport-status/news/2014/light-rail-extension.page . 27 March 2014 .
  74. Web site: Final countdown to construction: Sydney Light Rail major works start October 23. Transport for NSW. 28 May 2015. live. https://web.archive.org/web/20150528070243/http://www.transport.nsw.gov.au/media-releases/final-countdown-construction-sydney-light-rail-major-works-start-october-23. 28 May 2015.
  75. Web site: CBD and South East Light Rail contract awarded with earlier delivery date. Transport for NSW. 18 December 2014. dead. https://web.archive.org/web/20141218104521/http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-contract-awarded-earlier-delivery-date. 18 December 2014.
  76. News: Gerathy. Sarah. Sydney's light rail is one year behind schedule, now set for 2020 finish. 19 April 2018. ABC News. Australian Broadcasting Corporation. 19 April 2018.
  77. https://www.smh.com.au/national/nsw/sydney-light-rail-cost-blows-out-to-at-least-2-7b-after-settlement-20190603-p51tvc.html Sydney light rail cost blows out to at least $2.7b after settlement
  78. Web site: Parramatta Light Rail – Stage 1: frequently asked questions. Transport for NSW. 17 February 2017. live. https://web.archive.org/web/20170217144506/http://data.parramattalightrail.nsw.gov.au/s3fs-public/PLR%20FS_FAQs_accessible2.pdf. 17 February 2017.
  79. Web site: Preferred route – stage 1. Transport for NSW. 17 February 2017. live. https://web.archive.org/web/20170217144322/http://data.parramattalightrail.nsw.gov.au/s3fs-public/PLR_alignment_map.pdf. 17 February 2017.
  80. Web site: Sydney's Light Rail Future. Transport for NSW. 13 December 2012. 14 December 2012. 12. dead. https://web.archive.org/web/20130410121516/http://engage.haveyoursay.nsw.gov.au/document/show/601. 10 April 2013.
  81. Web site: Six more new light rail vehicles for Sydney. Transport for NSW. 11 October 2013. dead. https://web.archive.org/web/20131202222948/http://www.transport.nsw.gov.au/media-releases/six-more-new-light-rail-vehicles-sydney. 2 December 2013.
  82. http://www.transport.nsw.gov.au/media-releases/first-new-light-rail-vehicle-tracks-customer-trips-pass-15-million First new light rail vehicle on the tracks as customer trips pass 1.5 million
  83. Inner West Light Rail extension celebrates first year as new light rail vehicles go into operation . Gladys Berejiklian . 27 March 2015 . 5 April 2015 . live . https://web.archive.org/web/20150406133529/https://www.gladys.com.au/content/inner-west-light-rail-extension-celebrates-first-year-new-light-rail-vehicles-go-operation . 6 April 2015 .
  84. Alstom to deliver to Sydney Citadis X05, the latest evolution of its tram range . Alstom . February 2015 . 25 February 2015 . live . https://web.archive.org/web/20150225152618/http://www.alstom.com/press-centre/2015/2/alstom-to-deliver-to-sydney-citadis-x05-the-latest-evolution-of-its-tram-range-/ . 25 February 2015 .
  85. Web site: Sydney is first Citadis X05 tram customer. Metro Report International. 12 June 2017. 25 February 2015. live. https://web.archive.org/web/20170808075047/http://www.metro-report.com/news/metro/single-view/view/sydney-is-first-citadis-x05-tram-customer.html. 8 August 2017.
  86. http://www.railjournal.com/index.php/australia-nz/alstom-completes-first-citadis-x05-lrvs-for-sydney.html?channel=526 Alstom completes first Citadis X05 LRVs for Sydney
  87. http://www.metro-report.com/news/single-view/view/first-citadis-x05-tram-rolled-out.html First Citadis X05 tram rolled out
  88. Web site: Transdev Australasia consortium secures Parramatta Light Rail contract . Transdev Australasia . 20 December 2018.
  89. Web site: 9 September 2015 . New South Wales Auditor-General's Report: Performance Audit – Sydney metropolitan bus contracts . live . https://web.archive.org/web/20160317063122/http://www.audit.nsw.gov.au/ArticleDocuments/521/Sydney%20Metropolitan%20Bus%20Contracts.pdf.aspx?Embed=Y . 17 March 2016 . Audit Office of New South Wales.
  90. http://www.smh.com.au/nsw/cut-costs-or-bus-contracts-will-go-to-private-sector-minister-tells-drivers-20121106-28w5t.html Cut costs or bus contracts will go to private sector, minister tells drivers
  91. Web site: 25 February 2013 . Tenders open soon for Sydney bus services . https://web.archive.org/web/20130428232708/http://www.transport.nsw.gov.au/content/sydney-bus-services-tenders . 28 April 2013 . Transport for NSW.
  92. News: 16 May 2017 . NSW Transport Minister announces inner-west bus region tender . live . https://web.archive.org/web/20170716212948/http://www.abc.net.au/news/2017-05-16/nsw-government-announces-inner-west-buses-tender/8528494 . 16 July 2017 . 19 July 2017 . ABC News . Australian Broadcasting Corporation.
  93. http://stayinformed.transport.nsw.gov.au/wp-content/uploads/2017/09/Andrew-Constance-med-rel-Transit-Systems-boosts-Inner-West-bus-services-1.pdf Transit Systems Boosts Inner West Bus Services
  94. http://www.transport.nsw.gov.au/media-releases/new-b-line-transform-northern-beaches-bus-travel New B-Line to transform Northern Beaches Bus travel
  95. http://www.smh.com.au/nsw/mike-bairds-bline-rapid-bus-routes-for-northern-beaches-20151109-gku634.html Mike Baird's B-Line rapid bus routes for northern beaches
  96. https://www.busnews.com.au/industry-news/1609/man-double-deckers-for-sydney-northern-beaches MAN double-deckers for Sydney Northern Beaches
  97. https://www.transport.nsw.gov.au/newsroom-and-events/media-releases/thousands-of-new-transport-services-starting-at-a-stop-wharf-and Thousands of new transport services starting at a stop, wharf and station near you
  98. http://yoursay.b-line.transport.nsw.gov.au/northern-beaches-bus-service-plan Northern Beaches bus service plan
  99. News: Smith . Alexandra . 22 December 2010 . Out of the blue, an illusion of more buses, all dressed alike . live . https://web.archive.org/web/20150924213810/http://www.smh.com.au/nsw/out-of-the-blue-an-illusion-of-more-buses-all-dressed-alike-20101221-194gk.html . 24 September 2015 . Sydney Morning Herald.
  100. News: Gerathy . Sarah . Raper . Ashleigh . 13 June 2017 . NSW Budget: New hospital, bus boost and roads planning announced with one week to go . live . https://web.archive.org/web/20170620001535/http://www.abc.net.au/news/2017-06-13/nsw-budget-includes-tweed-hospital-bus-boost-and-roads-planning/8612746 . 20 June 2017 . 20 June 2017 . ABC News . Australian Broadcasting Corporation.
  101. News: Crash ferries face special inquiry . The Daily Telegraph . 3 April 2007 . dead . https://web.archive.org/web/20080411134045/http://www.news.com.au/dailytelegraph/story/0,22049,21496834-5001021,00.html . 11 April 2008 .
  102. Web site: Action for Public Transport (NSW). 6 December 2009. Submission to The Special Commission of Inquiry into Sydney Ferries.. Action for Public Transport (NSW). 2013-01-20. live. https://web.archive.org/web/20120322080438/http://www.aptnsw.org.au/documents/walker.html. 2012-03-22.
  103. Web site: Bret Walker. 2007. Sydney Ferries Report. NSW Transport. 2013-01-20. dead. https://web.archive.org/web/20120325091608/http://www.transport.nsw.gov.au/sites/default/file/inquiries/walker-ferry-report.pdf. 2012-03-25.
  104. Web site: Linton Bessera & Robert Wainwright. 1 November 2001. Sydney Ferries' day of reckoning.. Sydney Morning Herald. 2013-01-20. live. https://web.archive.org/web/20140112104410/http://www.smh.com.au/news/national/sydney-ferries-day-of-reckoning/2007/10/31/1193618974052.html. 2014-01-12.
  105. Web site: Deborah Cornwall. 20 April 2009. Rees paralysed over Sydney Ferry reform.. ABC 7.30 Report. 2013-01-20. live. https://web.archive.org/web/20140103110230/http://www.abc.net.au/7.30/content/2009/s2547849.htm. 2014-01-03.
  106. Web site: The Infrastructure Journal. 20 May 2011. Let the private sector improve Sydney Ferry services.. ClaytonUtz. 2013-01-20. dead. https://web.archive.org/web/20120326155229/http://www.claytonutz.com/publications/news/201105/30/let_the_private_sector_improve_sydney_ferry_services.page. 2012-03-26.
  107. Web site: 2013. Harbour City Ferries. Harbour City Ferries. 2013-01-20. dead. https://web.archive.org/web/20130409123815/http://www.harbourcityferries.com.au/. 2013-04-09.
  108. http://www.smh.com.au/nsw/private-operator-to-take-control-of-ferry-services-20120502-1xzfp.html Private Operator to take control of ferry services
  109. http://www.smh.com.au/nsw/steady-as-he-goes-ferries-sail-into-private-hands-20120727-22zm9.html Steady as he goes: ferries sail into private hands
  110. https://www.transdev.com/en/press-release/transdev-secures-e815-million-sydney-ferries-renewal-contract-until-2028/ Transdev secures €815 million Sydney Ferries renewal contract until 2028
  111. Web site: Foschia. Liz. Barangaroo construction officially begins. ABC News Australia. Australian Broadcasting Corporation. 25 October 2011. 23 March 2015. live. https://web.archive.org/web/20150417012721/http://www.abc.net.au/news/2011-10-25/barangaroo-construction-officially-begins/3599672. 17 April 2015.
  112. Web site: ABC News staff. NSW Government unveils plans for the future of Sydney ferries. ABC News Australia. Australian Broadcasting Corporation. 22 May 2013. 23 March 2015. live. https://web.archive.org/web/20150402223256/http://www.abc.net.au/news/2013-05-22/nsw-government-unveils-plans-for-the-future-of-sydney-ferries/4705172. 2 April 2015.
  113. Web site: Saulwick. Jacob. Tenders released for Barangaroo ferry wharf. Sydney Morning Herald. 5 May 2014. 23 March 2015. live. https://web.archive.org/web/20150205224849/http://www.smh.com.au/nsw/tenders-released-for-barangaroo-ferry-wharf-20140504-zr4cw.html. 5 February 2015.
  114. Web site: O’Rourke. Jim. New ferry terminal a part of new Barangaroo skyline preview. The Daily Telegraph. News Corp Australia. 23 March 2015. https://archive.today/20170629100553/http://www.dailytelegraph.com.au/news/national/new-ferry-terminal-a-part-of-new-barangaroo-skyline-preview/news-story/efead448fdeb50bef840ce0937fd5440. 29 June 2017. 11 December 2014. dead.
  115. Web site: O'Sullivan. Matt. Sydney's new ferry hub at Barangaroo opens to commuters. The Sydney Morning Herald. Fairfax Media. 27 June 2017. https://web.archive.org/web/20170627100316/http://www.smh.com.au/nsw/sydneys-new-ferry-hub-at-barangaroo-opens-to-commuters-20170626-gwyfkk.html. 27 June 2017. 26 June 2017.
  116. Web site: McPhee. Sarah. New Barangaroo Wharf open for ferries. News.com.au. News Corp Australia. 27 June 2017. https://web.archive.org/web/20170627063830/http://www.news.com.au/national/breaking-news/barangaroo-wharf-opens-for-sydney-ferries/news-story/623a7b521eaecb69bf98075deee9554b. 27 June 2017. 26 June 2017.
  117. Web site: Australian Associated Press. New ferry hub at Sydney's Barangaroo. The Australian. News Corp Australia. 23 March 2015. https://archive.today/20150407110521/http://www.theaustralian.com.au/news/latest-news/new-ferry-hub-at-sydneys-barangaroo/story-fn3dxiwe-1226905598150. 7 April 2015. 5 May 2014. dead.
  118. Web site: O’Rourke. Jim. Barangaroo development: Wynyard Walk takes shape in Sydney. The Daily Telegraph. News Corp Australia. 23 March 2015. https://archive.today/20150407110544/http://www.dailytelegraph.com.au/news/nsw/barangaroo-development-wynyard-walk-takes-shape-in-sydney/story-fni0cx12-1227117764745. 7 April 2015. 10 November 2014. dead.
  119. Web site: Wharf Upgrade Program. Roads and Maritime Services. 26 October 2017. live. https://web.archive.org/web/20170712105950/http://www.rms.nsw.gov.au/maritime/projects/ferry-wharf-upgrade-program.html. 12 July 2017.
  120. http://www.transport.nsw.gov.au/media-releases/six-iconic-new-modern-ferries-sydney-harbour Six iconic new modern ferries for Sydney Harbour
  121. http://www.smh.com.au/nsw/new-sydney-ferries-set-to-sail-from-2016-20141127-11v1yz.html New Sydney ferries set to sail from 2016
  122. Web site: Australian shipyard to build Sydney's new ferries. Transport for NSW. 23 September 2015. dead. https://web.archive.org/web/20150923140103/http://www.transport.nsw.gov.au/media-releases/australian-shipyard-build-sydneys-new-ferries. 23 September 2015.
  123. Web site: Sydney's Ferry Fleet. Transport for NSW. 30 January 2017. https://web.archive.org/web/20170204221628/http://www.transport.nsw.gov.au/projects/sydneys-ferry-fleet. 4 February 2017. dead.
  124. News: O'Sullivan. Matt. Sydney's first new government-owned ferries in years hit bumpy waters. The Sydney Morning Herald. 30 January 2017. live. https://web.archive.org/web/20170308140753/http://www.smh.com.au/nsw/sydneys-newest-governmentowned-ferry-in-years-hits-bumpy-waters-20170125-gtyvyj.html. 8 March 2017.
  125. Web site: Fred Hollows enters service. Transport for NSW. 28 June 2017. 26 June 2017. dead. https://web.archive.org/web/20170626141254/https://www.transport.nsw.gov.au/newsroom/articles/fred-hollows-enters-service. 26 June 2017.
  126. News: McPhee. Sarah. New Barangaroo Wharf open for ferries. 28 June 2017. news.com.au. Australian Associated Press. 26 June 2017. live. https://web.archive.org/web/20170627063830/http://www.news.com.au/national/breaking-news/barangaroo-wharf-opens-for-sydney-ferries/news-story/623a7b521eaecb69bf98075deee9554b. 27 June 2017.
  127. News: O'Sullivan. Matt. Fate of Sydney's last ladies of the harbour finally sealed. 24 October 2017. The Sydney Morning Herald. 24 October 2017. live. https://web.archive.org/web/20171024134643/http://www.smh.com.au/nsw/fate-of-sydneys-last-ladies-of-the-harbour-finally-sealed-20171019-gz4onz.html. 24 October 2017.
  128. Truss, Warren. Warren Truss. Western Sydney Airport to Deliver Jobs and Infrastructure. Ministry for Inreastructure and Regional Development. Commonwealth of Australia. 15 April 2014. Abbott, Tony. Tony Abbott. live. https://web.archive.org/web/20140416210638/http://www.minister.infrastructure.gov.au/wt/releases/2014/April/wt056_2014.aspx. 16 April 2014.
  129. Web site: An airport for Western Sydney – Building Western Sydney's future. Department of Infrastructure and Regional Development. 27 October 2017. September 2016. live. https://web.archive.org/web/20170217182616/http://westernsydneyairport.gov.au/files/summary_brochure-an_airport_for_WS.pdf. 17 February 2017.
  130. News: Sydney's second airport: 'This will be a significant boost to Australia' . www.9news.com.au . 24 September 2018.
  131. http://simta.com.au/the-project/ The Project
  132. http://www.abc.net.au/news/2015-06-12/qube-moorebank-intermodal-hub-infrastructure/6541514 Qube's Moorebank intermodal hub a major infrastructure boost
  133. http://www.skynews.com.au/business/business/company/2017/04/06/moorebank-construction-finally-begins.html Moorebank construction finally begins
  134. http://minister.infrastructure.gov.au/chester/releases/2017/april/dc084_2017.aspx Construction begins on Moorebank Logistics Park