Toronto Water is the municipal division of the City of Toronto under Infrastructure and Development Services responsible for the water supply network, and stormwater and wastewater management in Toronto, Ontario, Canada, as well as parts of Peel and York Regions.

History

Early days

Water treatment was originally established in order to provide safe drinking water. In the 19th century, the water off the city's shores was severely polluted by the dumping of waste from residences and businesses.

Before 1842, Toronto's water supply was manually pumped from Lake Ontario, streams and wells. Water carters would take the water and distribute it to customers across the city.[1]

Private water supply

From 1843 to 1873, water was privately provided by Furniss Works or Toronto Water Works, a subsidiary of Toronto Gas Light and Water Company, which was owned by Montreal businessman Albert Furniss.[2]

Following Furniss's death in 1872, the City of Toronto bought out Furniss Works and transformed the water supply to public hands under the Toronto Water Works Commission.[3]

Suburban water supply

Outside of the pre-amalgamation City of Toronto each of the former municipalities had its own treatment plants and pumping stations. North York had three, one at Oriole, which was built in the 1923, the ruins of pumping station found near Duncan Mills Rd and Don Mills Rd,[4] Steeles built in the 1930s, and Sheppard West built in the 1940s. Scarborough had one built in 1921 and New Toronto had one built in 1924. Prior to the 1950s, the municipalities were responsible for water treatment and water came from local water sources like wells and streams.

Metro Toronto

The current system was introduced in the mid-1950s, with the formation of Metro Toronto in 1954, and was managed by Metro Toronto. Since 1975, Toronto has supplied water to York Region (mostly to residents in the south end of York).[5]

City of Toronto

Following amalgamation in 1998, Toronto Water was created from the Toronto Works and Emergency Services and once part of Metro Toronto Works department.

As of April 2005, the departments and commissioners were replaced by divisions under the City Manager (and Deputy Managers). Toronto Water is now under the Toronto Water Division.

Drinking water operations

Treatment process

Water pumped from Lake Ontario is treated via conventional drinking water treatment processes:

  1. Pre-chlorination
  2. Flocculation and sedimentation
  3. Filtration
  4. Chlorination
  5. Chloramination, prior to distribution

Treatment plants

The City of Toronto uses four water treatment plants, all of which are located next to and get their water from Lake Ontario:[6]

!Name!Opened!Location!Capacity
R.C. Harris Water Treatment Plant1941950ML/d
Island Water Treatment Plant1977 440ML/d
F. J. Horgan Water Treatment Plant1979800ML/d
R. L. Clark Water Treatment Plant1968615ML/d

R.C. Harris Water Treatment Plant

See main article: R. C. Harris Water Treatment Plant. The R. C. Harris Water Treatment Plant is located east of Old Toronto at the eastern end of Queen St East and the foot of Victoria Park Ave at Lake Ontario. It is the oldest of the operational water treatment plants in Toronto, being opened on November 1, 1941 after construction started in 1932.[7] The plant has a capacity of 950 million litres per day (250 million US gallons per day) and produces approximately 30% of Toronto's drinking water. The intakes are located over 2.6km (01.6miles) from shore in 15m (49feet) of water, running through two pipes under the bed of the lake.[8]

Prior to the construction of the water treatment plant, the area was the site of Victoria Park, a waterfront amusement park that operated from 1878 until 1906, and then the site was used by the Victoria Park Forest School until construction started in 1932. The plant is named after Roland Caldwell Harris, who was the Public Works Commissioner from 1912 to 1945. He was involved in projects including the Prince Edward Viaduct, the Mount Pleasant bridge, and the expansion of the Toronto Civic Railways' streetcar network.[9] Known for its Art Deco style, the building is dubbed “The Palace of Purification” and was designated under the Ontario Heritage Act in 1998.[10]

Island Water Treatment Plant

The Island Water Treatment Plant is located on the Toronto Islands. The plant was opened in 1977 with a capacity of 440ML/d.[11] The plant produces approximately 20% of Toronto's drinking water. The plant sits on the site of the first water treatment plant in Toronto, which was built in the 1900s and is no longer in service. The cold, treated water produced by the plant passes through a heat exchange system, which enables Enwave's Deep Lake Water Cooling project to cool buildings across the harbour in Downtown Toronto.[12]

F. J. Horgan Water Treatment Plant

The F. J. Horgan Water Treatment Plant is located in Scarborough in the West Hill neighbourhood on Lake Ontario. It is the newest of Toronto's water treatment plants, being opened in 1979. With a capacity of 800ML/d, it provides water to customers in the east end and York Region. The plant produces approximately 20% of Toronto's drinking water. The plant is named after Frank J. Horgan, the Commissioner of Works for Metro Toronto from 1980 to 1989.

In 2009, the plant was expanded by Alberici in a contract. The expansion included the construction of a new building with three ozone tanks, five filter boxes, and two backwash surge tanks.[13] As of 2022, it remains the only plant in Toronto that uses ozone as the primary disinfectant to control pathogens, seasonal taste, and odour. The plant features a green roof and a 10-megawatt standby power plant to meet demand in the event of a power outage.

R. L. Clark Water Treatment Plant

The R. L. Clark Water Treatment Plant is located in Etobicoke in New Toronto on Lake Ontario. The plant was opened on November 22, 1968. It has a capacity of 615ML/d and produces approximately 30% of Toronto's drinking water. The plant was originally called the Westerly Plant, but it was later named after Ross Leopold Clark, the Commissioner of Works for Metropolitan Toronto from 1956 to 1979. The plant replaced the New Toronto Filtration Plant, which was opened in 1915.[14]

Distribution

The drinking water distribution system operated by Toronto Water comprises 6 pressure zones and approximately 520 km of watermains (greater than 150 mm in diameter).[15]

Pumping stations are located across the city to pump water from the filtration plants to residences. They are particularly critical since the city gains in elevation as it moves northwards away from Lake Ontario. Some pumping stations are located outside the city.

The City of Toronto operates 18 water pumping stations as of 2014:[16]

Pumping StationLocationReservoirCity
Kennedy Pumping StationSouth of Steeles Ave E on Kennedy RdToronto
W.H. Johnston Pumping StationLawrence Ave W and Royal York Rd
Armour Heights Pumping StationWilson Ave west of Avenue Rd
West Toronto Pumping StationSouth of Davenport Rd on Old Weston Rd
St. Albans Pumping StationAukland Rd and St. Albans Rd, across from Kipling Station
Lawrence Pumping StationLawrence Ave W and Caledonia RdLawrence Reservoir
Richview Pumping StationNorth of Eglinton Ave W on Martin Grove RdRichview Reservoir
High Level Pumping StationPoplar Plains Rd, north of Dupont St and Davenport Rd
Keele Pumping StationSouth of Steeles Ave W on Keele StKeele Reservoir
Ellesmere Pumping StationEllesmere Rd west of Morningside AveEllesmere Reservoir
Eglinton Pumping StationAshtonbee Rd and Pharmacy AveEglinton Reservoir
Parkdale Pumping StationThe Queensway east of Parkside Dr
Rosehill Pumping StationMount Pleasant Rd and Carstowe RdRosehill Reservoir
Scarborough Pumping StationFishleigh Drive, south of Danforth Ave E and Kingston Rd
John St Pumping StationLake Shore Boulevard W and Rees St
Bayview Pumping StationSouth of Highway 407 on Bayview AveBayview ReservoirMarkham
Milliken Pumping StationEast of Kennedy Rd on 14th AveMilliken Reservoir
Thornhill Pumping StationGreen Lane and Bayview Ave

Storage

Toronto water stores water in three formats:

Water in the city is stored once it is treated, ensuring uninterrupted water supply.

There are 4 water towers located in the city.[17] They are mainly located in areas that cannot accommodate underground reservoirs due to space restrictions.

NameLocation
Whitlam TankLake Shore Boulevard E
Leslie TankLeslie St and Lawrence Ave E at Talwood Drive
Warden TankSheppard Ave E near Morningside Ave
Rouge TankWarden Ave and Civic Rd

There are 10 underground reservoirs across Toronto and in Markham:[18]

NameAbove groundLocationCityRef.
Eglinton ReservoirAshtonbee Reservoir ParkPharmacy Ave north of Eglinton Ave EToronto[19]
Ellesmere ReservoirEllesmere Reservoir ParkEast of Neilson Rd and Ellesmere Rd[20]
Keele ReservoirKeele Reservoir ParkSouth of Steeles Ave W and Keele St[21]
Lawrence ReservoirCaledonia ParkLawrence Ave W and Caledonia Rd[22]
Rosehill ReservoirDavid Balfour ParkAvoca Ave and St. Clair Ave E[23]
Richview ReservoirRichview ParkMartin Grove Rd and Eglinton Ave W[24]
St. Clair ReservoirSir Winston Churchill ParkSpadina Rd and St. Clair Ave W[25]
Milliken ReservoirMilliken Mills ParkEast of 14th Ave and Kennedy RdMarkham[26]
Maple ReservoirMaple Reservoir ParkSouth of Teston Rd and Keele St[27]
North Markham ReservoirGrass-covered propertyMcCowan Rd and Stouffville Sideroad[28]
Bayview ReservoirBayview Reservoir ParkSouth of Highway 407 on Bayview Ave[29]
Dufferin ReservoirGrass-covered propertyDufferin St and Autumn Hill BlvdVaughan[30]

There are in-plant temporary storage tanks storing water as well:[31]

NameCapacity
F. J. Horgan Water Treatment Plant68ML
Island Water Treatment Plant34ML
R. C. Harris Water Treatment Plant54ML
R. L. Clark Water Treatment Plant27ML
Scarborough Pumping Station25ML

Wastewater treatment

Treatment process

Toronto's wastewater treatment plants treat wastewater in a 5 step process:[32]

  1. Screening
  2. Git removal
  3. Primary treatment
  4. Secondary treatment
  5. Disinfection

During screening, large objects such as rocks and sticks that get washed into the sewer system are removed. Git removal removes smaller objects like tampons, dental floss, and wipes. Primary treatment separates human waste from wastewater. Secondary treatment uses microscopic organisms to reduce and convert pollutants in the wastewater. This stage also removes nitrogen and phosphorus from the wastewater. Disinfection destroys any remaining harmful pathogens. After disinfection, the effluent wastewater meets all Ministry standards and is returned to the natural environment and reused within the facility for internal process use.[33]

Solids removed during primary treatment and secondary treatment are pumped into digesters which allow a biological process that uses microorganisms, heat, mixing, and a 10-20 day holding time to break down complex organic matter into simpler forms. This produces methane as a byproduct. This produces biosolids, which are rich in organic material and nutrients.[34]

Treatment plants

The City of Toronto has four facilities that process wastewater before it is returned to the lake:[35]

!Name!Opened!Location!Capacity
Ashbridges Bay Wastewater Treatment Plant1910818ML/d
North Toronto Wastewater Treatment Plant192934ML/d
Highland Creek Wastewater Treatment Plant1956219ML/d
Humber Wastewater Treatment Plant 1960473ML/d

Ashbridges Bay Wastewater Treatment Plant

See main article: Ashbridges Bay Wastewater Treatment Plant.

The Ashbridges Bay Wastewater Treatment Plant is located on the east end of the Port Lands, south of the intersection of Leslie St and Lake Shore Blvd East along Lake Ontario. The plant has a capacity of 818ML/d, serving a population of 1.5 million. The plant began operation in 1917 and was originally called the Main Treatment Plant.

North Toronto Wastewater Treatment Plant

The North Toronto Wastewater Treatment Plant is located in the Don Valley north of the Millwood Rd over the Don Valley Parkway.[36] The treatment plant discharges into the Don River. The plant has a capacity of 34ML/d serving a population of 55,000. The plant began operations in 1929. The plant is one of several legacy projects of Roland Caldwell Harris, the Public Works Commissioner from 1912 to 1945. The plant was partly created after North Toronto residents threatened to de-amalgamate over inadequate sewage treatment in the late 1920s.[37]

Highland Creek Wastewater Treatment Plant

The Highland Creek Wastewater Treatment Plant is located at the mouth of Highland Creek in the West Hill neighborhood of Scarborough.[38] The treatment plant has a capacity of 219ML/d, which serves a population of approximately 450,000. The plant began operations in 1956. The operations of the plant, especially the handling of the 41,000 wet tonnes of biosolids the plant produces each year is an issue of concern to residents around the plant. A neighbourhood liaison committee has been established to allow residents to discuss these concerns.[39]

Humber Wastewater Treatment Plant

The Humber Wastewater Treatment Plant is located near the mouth of the Humber River on The Queensway. The treatment plant has a capacity of 473ML/d, which serves a population of approximately 680,000. The plant first began operations in 1960. Local residents have been complaining about the smell produced by the plant during hotter weather. The city spent in 2018 to help reduce the smell produced by the plant.[40]

Heavy rainfall

During heavy rainstorms, some excess flow which cannot be handled by the treatment plant many be diverted around some of the plant's treatment processes. As this bypass happens during storm events, the waster is mostly rain water, often with a ratio of four or five parts rain to one part sewage. These bypasses can happen at the Ashbridges Bay Wastewater Treatment Plant and the Humber Wastewater Treatment Plant, as these plants serve areas of the city with older combined sewers, which carry both sewage and stormwater to water treatment plants.[41]

In addition to bypasses at wastewater treatment plants, the city also has detention storage facilities that can temporarily hold sewage for treatment at a later time when the treatment plants are no longer operating at full capacity. These detention facilities include the Kenilworth Ave Tank which was put into operation in 1990 and the Maclean Ave Tank which was put into operation in 1995.[42]

Notes and References

  1. News: The digging begins on Avenue Rd. . Raveena . Aulakh . The Star . Toronto Star . 12 November 2010. 23 March 2012.
  2. The Culture of Flushing: A Social and Legal History of Sewage, p 66
  3. News: Aulakh . Raveena . Nov 12, 2010 . The digging begins on Avenue Rd. . The Star . Toronto .
  4. Web site: Archived copy . 2018-05-30 . 2016-03-04 . https://web.archive.org/web/20160304044817/http://nyhs.ca/2011MysteryRuinsDMYM.pdf . dead .
  5. Web site: History: supplying water to Toronto . 2012-03-23 . City of Toronto.
  6. Web site: 2017-11-17 . Fast Facts about the City's Water Treatment Plants . 2022-08-10 . City of Toronto . en-CA.
  7. Web site: Mannell . Steven . January 1, 2002 . Water Works . July 19, 2010 . Canadian Architect.
  8. Web site: The R.C. Harris Water Treatment Plant . 2022-08-10 . www.blogto.com . en.
  9. News: Lorinc . John . May 18, 2012 . Meet the man who shaped 20th-century Toronto . The Globe and Mail .
  10. Web site: City of Toronto's Heritage Property Search Detail . 2022-08-10 . secure.toronto.ca.
  11. Web site: Island Water Treatment Plant, Toronto Island Park . 2022-08-10 . Enjoy Ontario . en.
  12. Web site: Deep Lake Water Cooling System . 2022-08-10 . www.acciona.ca . en.
  13. Web site: F.J Horgan Water Treatment Plant Alberici Increasing Plant Capacity . 2022-08-10 . Alberici . en-US.
  14. Web site: New Toronto Filtration Plant/Lakeshore Pumping Station Historical Plaque . Toronto's Historical Plaques at Torontohistory.org . June 2002. 2012-03-23.
  15. Web site: The water distribution system . City of Toronto . 2011-05-15 . 2012-03-23.
  16. Web site: July 2016 . 2014 Annual Energy Consumption & Greenhouse Gas (GHG) Emissions . City of Toronto . Energy & Waste Management Office, Environment & Energy Division . 96.
  17. Web site: Water Towers and Standpipes in Ontario: T . Eureka4you.com . 2012-03-23.
  18. Web site: Mar 2016 . Toronto Water 13040 Equipment Tag Standard . 13.
  19. Web site: ACO Toronto - Eglinton Reservoir . 2022-08-11 . www.acotoronto.ca.
  20. Web site: Recreation . Toronto Parks, Forestry and . Ellesmere Reservoir Park . 2022-08-11 . City of Toronto . en-CA.
  21. Web site: Recreation . Toronto Parks, Forestry and . Keele Reservoir . 2022-08-11 . City of Toronto . en-CA.
  22. Web site: The Municipality of Metropolitan Toronto. 26.
  23. Web site: 2017-11-22 . Rosehill Reservoir Rehabilitation . 2022-08-11 . City of Toronto . en-CA.
  24. Web site: 2020-07-24 . Richview Reservoir Rehabilitation . 2022-08-11 . City of Toronto . en-CA.
  25. Web site: St. Clair Reservoir photographs catalogue record . 2 October 2011 . City of Toronto Archives catalogue.
  26. Web site: Milliken Reservoir & Pump Station . 2022-08-11 . Canadian Consulting Engineer . en-US.
  27. Web site: 2021-08-27 . South Maple Reservoir Upgrades . 2022-08-11 . York Region . en.
  28. Web site: Future Urban Area Conceptual Master Plan . City of Markham.
  29. Web site: DELEGATED APPROVAL FORM . City of Toronto.
  30. Web site: Conveyance of a Portion of 8851 Dufferin Street .
  31. Web site: Storage - Water Supply - Drinking Water . dead . https://web.archive.org/web/20141029033135/http://www1.toronto.ca/wps/portal/contentonly?vgnextoid=78d807ceb6f8e310VgnVCM10000071d60f89RCRD&vgnextchannel=b8011b9c6a85f310VgnVCM10000071d60f89RCRD . 2014-10-29.
  32. Web site: 2017-11-17 . Wastewater Treatment Plant Bypass Reports . 2022-08-11 . City of Toronto . en-CA.
  33. Web site: March 31, 2022 . North Toronto Treatment Plant 2021 Annual Report . City of Toronto . Appendix A.
  34. Web site: 2017-11-17 . Managing Sewage in Toronto . 2022-08-11 . City of Toronto . en-CA.
  35. Web site: 2017-11-17 . Wastewater Treatment Plants & Reports . 2022-08-11 . City of Toronto . en-CA.
  36. Web site: Kettel . Geoff . 2019-04-01 . North Toronto Sewage Treatment Plant – below the radar, yet a vital utility . 2022-08-11 . Leaside Life . en-US.
  37. Web site: Kettel . Geoff . 2019-04-01 . North Toronto Sewage Treatment Plant – below the radar, yet a vital utility . 2022-08-11 . Leaside Life . en-US.
  38. Web site: 2018-10-15 . Highland Creek Treatment Plant Neighbourhood Liaison Committee . 2022-08-11 . City of Toronto . en-CA.
  39. Web site: Scarborough community split over sewage at Highland Creek - Toronto Globalnews.ca . 2022-08-11 . Global News . en-US.
  40. Web site: Pelley . Lauren . July 4, 2019 . 'It still stinks!': Residents have mixed opinions on city efforts to curb Humber, Ashbridges sewage smells . CBC.ca.
  41. Web site: 2017-11-17 . Wastewater Treatment Plant Bypass Reports . 2022-08-11 . City of Toronto . en-CA.
  42. Web site: Performance Assessment of the Toronto Eastern Beaches Detention Tank . Toronto and Region Conservation Authority.