Tirana Logistic Park | |
Type: | Private |
Foundation: | 2013 |
Location: | Tirane, Albania |
Key People: | Alket Hajdini |
Industry: | Logistics |
Subsid: | Balfin Group |
Tirana Logistic Park (TLP) is an Albanian company that offers logistic services in Albania. Tirana Logistic Park is a project of 3 "Class A" warehouses along the Tirana-Durrës highway. Its of buildings on of land met European standards in storage and manufacturing.[1] This logistic park was opened on October.[2]
Tirana Logistic Park is a project designed by Samir Mane, though construction did not begin until 2012.[3]
In 2013, the first phase of the construction was finished. The inaugural ribbon was cut by Michael D. Granoff (Chairman of the Albanian-American Enterprise Fund), Idajet Ismailaj, Lulzim Basha, Niko Peleshi, Aleksandër Arvizu and Samir Mane.[4]
The park has a dedicated railway spur line. The storage spaces include the utilities needed for processing containers.[5] The services are agreed to be guaranteed by an agreement with Milsped.[6]
The logistic park is positioned within a radius of 30km (20miles) between Tirana and Durres. The park is next to the railway and the Port of Durrës.[7]