Timberline High School | |
Type: | Public |
Established: | 1970, 2019 (current) |
Image Size: | 200px |
District: | North Thurston Public Schools |
Campus: | Suburban |
Grades: | 9 - 12 |
Enrollment: | 1,404 (2022-23)[1] |
Principal: | Paul Dean |
Faculty: | 65.10 (FTE) |
Ratio: | 21.57 |
Location: | 6120 Mullen Road SE |
City: | Lacey |
State: | Washington |
Country: | United States |
Colors: | Green & Gold |
Conference: | District Three, South Sound Conference (3A) |
Nickname: | Blazers |
Rival: | North Thurston |
Newspaper: | The Blazer [2] |
Yearbook: | The Cairn |
Website: | Timberline High School |
Coordinates: | 47.0075°N -122.8°W |
Footnotes: | [3] [4] |
Timberline High School is a comprehensive public secondary school in Lacey, Washington. Opened in 1970 and part of North Thurston Public Schools, its school colors are green and gold and the mascot is a blazer.
Timberline primarily receives students from Komachin Middle School. At one point the school building was also home to the experimental high school, New Century High School. Timberline's original floor plan was open, similar to the Juanita concept; the original building was fully demolished during the 2007 - 08 school year.[3]
The original building was completed in 1970. During the first week of school in 1970, the 700 students that attended met in the gym because it was the only completed part of the building.
The school building had an open-concept design and the class schedule was a flexible modular one, based on 15-minute increments. Nearly all instruction was individualized.
The first major change to scheduling was in the 1976–77 school year, which had a more traditional 7-period schedule. In 1978, it was changed to a 6-period schedule. The math department was the last to conduct primarily individualized instruction, doing so until the 1982–1983 school year.
Major changes to the building took place in 1980 with a $3.3 million construction project. Some classes were held in portables until spring 1981. The construction included the Language-Arts building, auto shop, graphics and journalism areas, weight room and wrestling addition, and the student commons.
During the 1985–86 school year, the softball and soccer fields were added. In 1987, the all-weather track was completed. In 2000, the swimming pool was renovated.
In 1989, the heating and air conditioning systems were updated.
In 2006, voters approved a $66 million fund to build a new main building, and in 2008, the new building was opened and the old main building demolished later that year.