Thorntonbank Wind Farm
Location:28 km north off the Belgian coast
Cost:€ 1.3 billion

The Thorntonbank Wind Farm (also known as C-Power) is an offshore wind farm, 30km (20miles) off the Belgian coast, in water ranging from 12mto27mm (39feetto89feetm) deep. It is the first offshore wind farm in Belgium.

Electricity production started in early 2009, with a capacity of 30 MW.The capacity was increased to a total of 214 MW in 2012 and 325 MW in 2013.[1]

Phases

First phase

The first phase was built by C-Power and consists of six REpower offshore wind turbines of 5 MW capacity on the Thornton sandbank, at a cost of 153 million.[2] It was commissioned in June 2009.[3] [4] A 37 km 150 kV undersea cable connects the Thorntonbank Wind Farm to the shore.[5]

The first phase of what will ultimately be a 325 MW wind farm was completed in September 2008. The six REpower 5 MW turbines, which were installed on concrete gravity foundations, were linked to the Belgian power grid, giving a total rated capacity of 30 MW for the first stage.[6] The full story of the design, engineering, construction and installation of the Thorntonbank Wind Farm (first phase) is told in an illustrated book that was published in November 2010.[7] [8]

Second and third phase

In these phases, a total of 48 additional wind turbines of 6.15MWp were installed.[9]

Phase 2, completed in October 2012, comprises the installation of 30 of the 48 wind turbines. These wind turbines have been installed on steel jacket foundations designed by OWEC Tower AS and assembled at the Smulders shipyard in Hoboken.[10]

In the third and last phase, completed in September 2013, the remaining 18 wind turbines were installed, bringing the total capacity to around 325 MW.[11]

Environmental assessment

To assess the environmental impact C-Power has enlisted the assistance of the Research Institute for Nature and Forest (INBO[12]) and the Institute for Agricultural and Fisheries Research (ILVO [13]) to obtain the most detailed possible information on the occurrence of these animal species at Thornton Bank and to assess the possible effect of a wind farm on them.[14]

How the Wind Farms affect the landscape will be studied by WES-Onderzoek & Advies, who were also involved in earlier research in connection with the perceived impact on the landscape of near shore wind farms.[14]

Offshore wind farms may affect sea fishing. Certain areas may be closed to commercial fishing, as a result of which the total area that can be fished is reduced, but new habitats may also be created as a result. The basis for this study is a thorough investigation of the importance of the Thornton Bank for sea fishing.[14]

Offshore wind farms create new structures at sea and by definition they therefore pose an additional risk to the safety of shipping. C-Power has, however, chosen a location which is a long way from the most important shipping routes so that this risk can be reduced to a minimum. C-Power will be calling upon the specialised knowledge of German consultants Germanischer Lloyd.[14]

Financing

Thorntonbank was only the second offshore wind farm to be project financed.[15]

See also

External links

Notes and References

  1. Web site: Project Details . C-Power . c-power.be . 2020-08-07.
  2. http://www.4coffshore.com/windfarms/thornton-bank-phase-i-belgium-be01.html Thorntonbank (Belgium) offshore wind farm
  3. http://www.renewableenergyfocus.com/view/14232/repower-turbines-to-thornton-bank-offshore-wind-farm-expansion/ REpower turbines to Thornton Bank offshore wind farm expansion
  4. http://www.renewableenergyworld.com/rea/news/article/2009/07/thornton-bank-offshore-project-officially-commissioned Thornton Bank Offshore Project Officially Commissioned
  5. http://www.c-power.be/images/stories/downloads/press_releases/pb20070523-en.pdf Final kick off for the 300 MW wind farm in front of the Belgian coast
  6. Web site: Renewable Energy World Article . 2009-08-03.
  7. Jan Strubbe, "Reuzen in de Wind - Het windmolenpark op de Thorntonbank", Tielt (Belgium), 2009,
  8. Web site: Presentation - c-power . 2013-09-20 . dead . https://web.archive.org/web/20130921054137/http://www.c-power.be/presentation . 2013-09-21 . C-Power phase I
  9. Web site: REpower: C-Power's offshore wind farm Thornton Bank II installed. REpower. 6 November 2012. 2012-07-27.
  10. Web site: OWEC Tower: Supplying foundations for 48 turbines and one OTS. OWEC Tower. 16 July 2013. 2013-05-20.
  11. http://www.repower.de/press/press-releases/detail-press/?tx_ttnews%5Btt_news%5D=8109&cHash=071ef77c45bd3f13dc55372ca3c95111 Phase 2 complete
  12. http://www.vliz.be/imisdocs/publications/39505.pdf INBO
  13. http://www.mumm.ac.be/Downloads/mumm_report_mon_win2010.pdf ILVO
  14. http://www.c-power.be/environment Environmental impact
  15. Web site: C-Power Financing Article Article . 2009-08-03 . dead . https://web.archive.org/web/20081114053755/http://www.c-power.be/applet_mernu_nl/welkom/artikels/080306-ProjectFinance.pdf . 2008-11-14 .