Thiruvananthapuram Metro Explained

Thiruvananthapuram Metro
Native Name:TMC
Owner:Government of Kerala
Locale:Thiruvananthapuram, Kerala, India
Transit Type:Rapid Transit
Lines:2
Stations:38 (including 2 underground station) [1]
Began Operation:TBD
Operation Will Start:TBD
Operator:Kochi Metro Rail Limited
Character:Elevated, Underground
Train Length:3 Coaches
System Length:42.1 km (including 2 lanes) [2]
Notrack:2
Top Speed:80km/h
Map Name:Thiruvananthapuram Metro Map
Map State:collapsed

Thiruvananthapuram Metro is a proposed rapid transit[3] system in the city of Thiruvananthapuram, the capital of the Indian state of Kerala. Thiruvananthapuram, the capital city of Kerala, is all set to have its metro system. Earlier, there was a plan to build a light metro system in the city. However, the plan was later changed to a conventional metro system.

The new Thiruvananthapuram Metro is based on the Comprehensive Mobility Plan (CMP) for the city, which projected a high traffic volume in the future. According to the plan, the proposed Thiruvananthapuram Metro will have two corridors covering 42.1 km, connecting significant parts of the city. The Kochi Metro Rail Ltd (KMRL) submitted a DPR to the state government, marking a significant milestone in the development of this project.

History

Thiruvananthapuram's first attempt to build a rapid transit system for the city failed, when its proposal to build a metro rail system was rejected by the Delhi Metro Rail Corporation (DMRC) in the 2000s.[4] The Government of Kerala, then entrusted the National Transportation Planning and Research Centre (NATPAC), an autonomous research body under the State Government, to conduct the feasibility study of the proposal to build a monorail system in Thiruvananthapuram. The feasibility study was conducted by a core team comprising five scientists of NATPAC and various survey teams. Topographic studies, identification of stations and surveys were the main components of the study.[5]

The state government had initially asked the state transport department to prepare a detailed project report (DPR).[6] However, the DMRC was later entrusted with the task. DMRC principal advisor E. Sreedharan submitted the DPR to Chief Minister Oommen Chandy on 11 December 2012.[7] A special purpose vehicle (SPV) was created in October 2012.[8] The Thiruvananthapuram Monorail project was assigned to the KMCL on 26 November 2012. The government had handed over the Kozhikode Monorail project to the KMCL prior to that.[9]

On 12 June 2013, the state cabinet gave clearance for an agreement to be signed between KMCL and DMRC.[10] The DMRC will receive 3.25% of the 55.81 billion (35.90 billion for Thiruvananthapuram and 19.91 billion for Kozhikode) in general consultant fees.[11] The agreement was signed on 19 June 2013.[12]

Global tenders were floated for the Thiruvananthapuram Monorail.[13] The deadline for technical bids was extended from 1 October 2013 to 15 October.[13] However, a consortium led by Bombardier Transportation was the only firm that expressed an interest before the deadline. Pre-bid queries had also been made by Japanese firm Hitachi, Malaysian firm Scomi,[14] and firms from the United Kingdom, South Korea, and China.[15] The tender for the proposed project only received one bid, so a second tender had to be issued.[16] The deadline for bids was extended again to 15 April.[17] [18]

Bombardier Transportation, Hitachi, Afcons, Scomi, and Larsen and Toubro expressed interest in the second round of tender submissions. A pre-bid meeting was held in New Delhi on 20 February 2014.[18] Bidding on the Kozhikode and Thiruvananthapuram projects was delayed by the model code of conduct coming into effect prior to the 2014 Lok Sabha elections.[19]

On 28 August 2014, the State Government decided to use Metro, instead of Monorail, in Thiruvananthapuram and Kozhikode, mainly due to cost overruns. Though slightly costlier, Metro has several advantages, such as easy raising of capacity, DMRC's expertise in the field and more companies who can bid for the project.[20] [21] [22] [23]

Plan

The Thiruvananthapuram line will start from Technocity and terminate at Pallichal covering a distance of 27.4 km with 24 stations, along the old NH 47. Slight accommodations were made for the proposed flyovers at Kazhakuttam, Sreekaryam and Ulloor. Special spans are proposed where the line crosses the railway line at Railway Km 221/6-8. The car depot is located on a 12.5 hectares of Government land near the CRPF Camp at Pallipuram.

The second phase of 14.7 km was planned from Killipalam to Kazhakoottam via Technopark, Lulu Mall, Chacka and Eanchakkal. Eanchakkal to Killipalam is proposed as underground lane.

Phase 1

Route Terminals Length Stations Opening date
Route 1 24.4 km TBA
Route 2 Killipalam 14.7 km
Total39.1 km 2025

Phase 2

Route Terminals Length Stations Opening date
Route 1A 7 km TBA
Route 1B 8 km
Route 2 Eanchakkal8 km
Total22.20 19 2030

Cost

The cost of the project, based in April 2012 prices, was excluding taxes of .[24] The cost to construct each kilometre of the metro was estimated as 1617.1 million.[25] The Design, Build-Operate-Transfer (DBOT) mode was proposed.[26] The State and Union governments were to each pay 20% of the cost, and the rest was to be paid by other investors such as banks.[27]

In the 2012 State Budget, finance minister K. M. Mani, allotted for the Thiruvananthapuram project.[28] The project will be financed in part by a 5% state government surcharge on petrol and diesel sales. The surcharge is expected to bring in 2.50 billion per year.[29]

The operation and maintenance costs are divided into three major parts - staff costs, maintenance cost which include expenditure towards upkeep and maintenance of the system and consumables, and energy costs.[24]

In 2015, the cost for the Technocity - Karamana section was revised to 4,219 crore.[30]

Rolling stock

Each train will be made up of 3 coaches on the formation - leading car / intermediate car / leading car. The length and width of the cars will be 18m and 2.7m respectively. The total length of train will be approximately 54 m.[30]

Track Elevation development

The Trivandrum City Corporation faced huge challenges for elevated Viaduct in the city. This caused as most of the suburbs of the cities have roads that don't have broader length. In July 2019 Kerala Chief Minister Pinarayi Vijayan addressed that the route will not bound the NH 66 (Kovalam Bypass) it will enter the Thampanoor through Sreekariyam, Kesavadasapuram and Pattom one of Trivandrum's most busiest suburbs

Fare

Proposed fares for the metro vary from a minimum of 8 for two km to 30 for 18–24 km. However, the minimum fare projected for 2019 is 11 and the maximum 42.[7]

Monorail proposals

Representatives of Hyundai Rotem proposed in 2012 to use Maglev technology for setting up a mass rapid transport system in the city.[31]

On 28 August 2014, the state government decided to build a conventional rail metro rather than a monorail, as with then under construction Kochi Metro, in both Thiruvananthapuram and Kozhikode, mainly due to the prohibitive costs cited by prospective manufacturers.[32]

Personal Rapid Transit

A Personal Rapid Transit (PRT) system in Thiruvananthapuram has been proposed by INKEL ltd. A shift of 40% of the car and auto rickshaw travellers to the new system is expected. The PRT will function as a feeder mode of transport to supplement the metro.

The project will be completed in two phases. The first will be from Pallipuram to Thampanoor and the second from Thampanoor to Neyyattinkara. Thirty-five stations are proposed and the track will pass through Vellayambalam, Palayam, Statue, Overbridge, East Fort and Thampanoor.[33]

The approximate cost of the project is 60  crore per kilometre and it can be completed in 24 to 30 months.[34]

Finance Minister K.M. Mani allocated 2.5 million in the 2012-13 State Budget for preliminary work on the PRT in Thiruvananthapuram and Kottayam.

The project is expected to be completed in 24 months from date of commencement.[35]

See also

Notes and References

  1. Thiruvananthapuram
  2. Web site:

    Kerala Rapid Transit Corporation Limited::

    .
  3. https://www.newindianexpress.com/cities/thiruvananthapuram/2023/oct/09/report-suggests-kochi-metro-model-for-thiruvananthapuram-dmrc-to-prepare-fresh-dpr-2622086.html
  4. http://www.yentha.com/news/view/4/monorail-the-fading-dream Monorail – The Fading Dream - Trivandrum News
  5. https://web.archive.org/web/20131206210329/http://ibnlive.in.com/news/monorail-feasibility-study-ends/225487-60-123.html Monorail: Feasibility study ends
  6. News: PWD prepares project report for Kozhikode monorail project . https://web.archive.org/web/20131101152957/http://articles.timesofindia.indiatimes.com/2012-01-04/kochi/30588236_1_project-report-monorail-kozhikode . dead . 1 November 2013 . . 4 January 2012.
  7. News: DMRC submits detailed project report for Monorail . The hindu. 12 December 2012 . 18 December 2012 . Chennai, India . S. Anil . Radhakrishnan.
  8. News: TNN . Cabinet approves detailed project report of Kozhikode monorail project . https://web.archive.org/web/20131101152959/http://articles.timesofindia.indiatimes.com/2012-10-04/kozhikode/34258992_1_meenchanda-city-project-monorail . dead . 1 November 2013 . . 4 October 2012 . 18 July 2013.
  9. News: S. Anil Radhakrishnan . Monorail project on track soon . . 27 November 2012 . 18 July 2013 . Chennai, India.
  10. http://www.thehindu.com/news/national/kerala/nod-for-pact-with-dmrc-for-monorail/article4809672.ece Nod for pact with DMRC for monorail
  11. http://www.thehindu.com/news/national/kerala/agreement-with-dmrc-to-be-signed-on-june-19/article4815555.ece "Agreement with DMRC to be signed on June 19"
  12. http://www.thehindubusinessline.com/news/states/kerala-monorail-delhi-metro-ink-consultancy-agreement/article4830251.ece Kerala Monorail, Delhi Metro ink consultancy agreement | Business Line
  13. News: Global tenders again for Trivandrum, Kozhikode monorail . Chennai, India . The Hindu . S. Anil . Radhakrishnan . 17 October 2013.
  14. News: DMRC may go for another tender to select entities for monorail project. https://web.archive.org/web/20131102223938/http://articles.timesofindia.indiatimes.com/2013-10-18/thiruvananthapuram/43176926_1_monorail-project-kerala-monorail-corporation-limited-scomi-engineering . dead . 2013-11-02 . .
  15. News: Tender norms revised for Thiruvananthapuram, Kozhikode monorail projects . Chennai, India . The Hindu . S. Anil . Radhakrishnan . 23 October 2013.
  16. Web site: 'Government will go for re-tendering'. https://web.archive.org/web/20131106050629/http://newindianexpress.com/states/kerala/Government-will-go-for-re-tendering/2013/10/23/article1850594.ece. dead. 6 November 2013.
  17. Web site: Paperwork Stage, Still. https://web.archive.org/web/20140303162156/http://www.newindianexpress.com/cities/thiruvananthapuram/Paperwork-Stage-Still/2014/02/01/article2031133.ece#.UvU0eoXkjBY. dead. 3 March 2014.
  18. News: Monorail DPR for Thiruvananthapuram and Kozhikode to be submitted for nod . Chennai, India . The Hindu . S. Anil . Radhakrishnan . 6 February 2014.
  19. News: PWD works on the slow lane . Chennai, India . The Hindu . S. Anil . Radhakrishnan . 4 April 2014.
  20. News: Monorail scrapped, LRTS mooted. Radhakrishnan. S. Anil. 28 August 2014. The Hindu. 20 October 2014.
  21. News: . Kerala drops monorail projects, opts for metro . . 28 August 2014 . 6 May 2015.
  22. News: . Kerala opts for metro, not monorail . . 24 October 2014 . 6 May 2015.
  23. News: Nod for Metro project for Thiruvananthapuram, Kozhikode . . Radhakrishnan, S. Anil . 25 October 2014 . 6 May 2015.
  24. Web site: EXPRESSION OF INTEREST CUM PREQUALIFICATION FOR PROPOSED MONORAIL PROJECT IN KOZHIKODE AND THIRUVANANTHAPURAM CITIES OF KERALA STATE. DMRC. 10 November 2013. KMCL. Kerala Mono Rail Corporation. dead. https://web.archive.org/web/20131101182525/http://www.delhimetrorail.com/otherdocuments/614/EOI.pdf. 1 November 2013. dmy-all.
  25. News: DMRC submits detailed project report for monorail . https://web.archive.org/web/20131103020048/http://articles.timesofindia.indiatimes.com/2012-12-12/thiruvananthapuram/35773053_1_monorail-train-control-e-sreedharan . dead . 3 November 2013 . 12 December 2012 . . 20 December 2012.
  26. Web site: UK, Singapore firms express interest in Monorail, SRIP - South India - Kerala - ibnlive . ibnlive.in.com . 12 January 2022 . https://web.archive.org/web/20120920044707/http://ibnlive.in.com/news/uk-singapore-firms-express-interest-in-monorail-srip/292008-60-116.html . 20 September 2012 . dead.
  27. News: Tender deadline for monorail project extended. https://web.archive.org/web/20140202125335/http://articles.timesofindia.indiatimes.com/2013-12-25/thiruvananthapuram/45560702_1_kerala-monorail-corporation-limited-monorail-project-multi-crore-project . dead . 2014-02-02 . .
  28. http://english.manoramaonline.com/cgi-bin/MMOnline.dll/portal/ep/contentView.do?contentId=11246155&channelId=-1073865028&catId=-1073912525 FM allocates more funds for Metro, Monorail projects
  29. http://www.deccanherald.com/content/288102/kerala-citizens-pay-their-metro.html Kerala citizens to pay for their metro
  30. "Road ahead for Metro", The Hindu, THIRUVANANTHAPURAM, 19 May 2015
  31. https://archive.today/20130126101150/http://articles.timesofindia.indiatimes.com/2012-07-10/thiruvananthapuram/32617720_1_maglev-technology-e-sreedharan-high-level-meeting Maglev tech-based plan mooted for Thiruvananthapuram - Times Of India
  32. News: Thiruvananthapuram, Kozhikode monorail projects abandoned - The Hindu. The Hindu. 28 August 2014. Radhakrishnan. S. Anil.
  33. News: Trivandrum monorail. 21 February 2012. The Hindu. 20 February 2012. Chennai, India. S. Anil. Radhakrishnan.
  34. https://web.archive.org/web/20131212171602/http://ibnlive.in.com/news/prt-a-feeder-to-monorail/225486-60-123.html PRT: A feeder to Monorail
  35. News: Pod-cars to link major work centres . Chennai, India . The Hindu . S. Anil . Radhakrishnan . 23 March 2012.