Thailand Cultural Centre MRT station explained


Thailand Cultural Centre
Style:MRT
Address:Din Daeng and Huai Khwang, Bangkok, Thailand
Line: MRT Blue Line
Structure:Underground
Platform:1 island platform
2 side platforms (under construction)
Tracks:4 (2 in operation and 2 under construction)
Accessible:yes
Code:BL19
Owned:Mass Rapid Transit Authority of Thailand (MRTA)
Operator:Bangkok Expressway and Metro Public Company Limited (BEM)
Former:Thiam Ruam Mit
Passengers:4,103,960
Pass Year:2021

Thailand Cultural Centre MRT station (code BL19) is a Bangkok MRT station on the Blue Line in Bangkok, Thailand. It is located under Ratchadaphisek Road, near Thailand Cultural Centre and Stock Exchange of Thailand and MRT depot. During construction, the station had been named Thiam Ruam Mit.

Station details

The station uses symbol as color

blue.[1] It is an underground station, in width, in length, and in depth, and uses an island platform.

There are MetroMall in the station, but not opened yet.

Future

The under-construction MRT Orange line will interchange with MRT Blue Line at Thailand Cultural Centre station. Orange line will begin at Thailand Cultural Centre station and run eastward to Suwinthawong. In 2020, cabinet approved the extension of Orange line from Thailand Cultural Centre westward to Bang Khun Non.[2]

Major accident record

On 17 January 2005, just after 09:15, an empty train returning to the depot collided with a peak-hour train filled with passengers at the Thailand Cultural Centre station. 140 people were hurt, most of whom sustained only minor injuries, and the entire Metro network was shut down for two weeks.

After initial investigations, it was found that the empty train had run into problems shortly before the accident, grinding to a halt on a curve leading to the depot. The driver applied its brake and was waiting to be towed to the maintenance center close to Thailand Cultural Centre station.

A rescue train was attempting to connect to the stalled train when the driver was told to release the brake while coupling had not yet been successful. It was then that the empty train began to roll backwards at a speed of, before smashing into the other train, which was carrying passengers. Therefore, it was believed that the incident was caused by negligence due to insufficient training of operation staff.[3] This accident also resulted in two damaged trains with heavily damaged areas limited to the two leading cars. The colliding speed was suspected to be about 60 km/h due to the appearance of damaged areas. However, one train, which was rebuilt from the repair of the minor-damaged cars, was already fitted for operation at the end of 2006 and the remaining one was still under heavy repair until mid of 2007; it was put into service in October, 2007. The cost resulting from the accident might be a much higher figure than BMCL quoted, and it was expected to be at least 400 million baht, which was totally insured by a local insurance company.

The Metro resumed full operation on 1 February 2005, and passenger numbers soon rose back to pre-crash levels, partly due to a temporary promotional fare scheme which allowed passengers to travel any distance on the MRT for only ten baht (~0.33 USD).[4]

References

13.7661°N 100.57°W

Notes and References

  1. จุดเริ่มต้นของคนเดินทาง: ดำดินเดินทาง. คอลัมน์นายรอบรู้ นิตยสารสารคดี เดือนตุลาคม 2548
  2. Web site: MRT extension approved. . www.bangkokpost.com. 2020-04-28.
  3. News: Thai subway shut for safety probe . BBC News . 17 January 2005 . 13 May 2010.
  4. https://www.youtube.com/watch?v=cJnDFnNxcCA ข่าวดังข้ามเวลา : บทเรียนใต้พิภพ (21 มี.ค.59)